HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan


Closed Thread

 
Thread Tools Display Modes
     
     
  #1701  
Old Posted Dec 15, 2011, 2:52 PM
Echoes's Avatar
Echoes Echoes is online now
Registered User
 
Join Date: Oct 2006
Location: Saskatoon, SK
Posts: 4,522
Looking through Monday's City Council agenda is a report discussing when and how the parcels in River Landing Phase II will be sold.
- The first parcel, Parcel 'A', is the former PEDCO site and is proposed to be sold spring 2012 through a request for proposals
- The sequence of the other parcels' sales will proceed in 2014 and 2016, giving due consideration for the timing of the Victory Majors project so as to not negatively interfere with demand for that project
- The report also notes that the final construction contract on the Phase II riverfront is anticipated to be complete by the end of the 2012 construction season

Report starts on page 78 of the City Council agenda.
__________________
SASKATOON PHOTO TOURS
2013: [Part I] [Part II] | [2014] | [2016] | [2022-25]
     
     
  #1702  
Old Posted Dec 15, 2011, 3:05 PM
macca's Avatar
macca macca is offline
the heat goes on
 
Join Date: Jul 2006
Location: Saskatoon, SK
Posts: 712
Quote:
Originally Posted by Echoes View Post
Looking through Monday's City Council agenda is a report discussing when and how the parcels in River Landing Phase II will be sold.
- The first parcel, Parcel 'A', is the former PEDCO site and is proposed to be sold spring 2012 through a request for proposals- The sequence of the other parcels' sales will proceed in 2014 and 2016, giving due consideration for the timing of the Victory Majors project so as to not negatively interfere with demand for that project
- The report also notes that the final construction contract on the Phase II riverfront is anticipated to be complete by the end of the 2012 construction season

Report starts on page 78 of the City Council agenda.
The report recommends sale of the parcel through a public tender process, not an RFP.
     
     
  #1703  
Old Posted Dec 16, 2011, 11:13 AM
Jerry's Avatar
Jerry Jerry is offline
Registered User
 
Join Date: Jan 2007
Location: Saskatoon
Posts: 798
Prime properties valued at $21M
By David Hutton,
The StarPhoenix December 16, 2011 4:18 AM

The final pieces of the River Landing property puzzle now have a price: $20.8 million.

The City of Saskatoon lays out its five-year plan to sell the four remaining pieces of vacant land - all west of the Idylwyld Freeway surrounding the Saskatoon Farmers' Market - in a report headed Monday to city council along with a $3-million budget hike for the public portion of the signature riverfront development. [...]

Read more: http://www.thestarphoenix.com/travel/Prime+properties+valued/5869575/story.html#ixzz1gh9oNwck
     
     
  #1704  
Old Posted Dec 16, 2011, 6:49 PM
Jerry's Avatar
Jerry Jerry is offline
Registered User
 
Join Date: Jan 2007
Location: Saskatoon
Posts: 798
Remai gallery receives national award
By David Hutton,

The StarPhoenix December 16, 2011 12:13 PM


The Remai Art Gallery of Saskatchewan has won a prestigious national award for its design.

The $84-million gallery, designed by Toronto-based architect Bruce Kuwubara, is featured on the cover of this month’s Canadian Architect and is a winner of the magazine’s 2011 Award of Excellence. [...]

Read more: http://www.thestarphoenix.com/Remai+gall...l+award/5872297/story.html#ixzz1gj0afe1e
     
     
  #1705  
Old Posted Dec 16, 2011, 7:12 PM
Echoes's Avatar
Echoes Echoes is online now
Registered User
 
Join Date: Oct 2006
Location: Saskatoon, SK
Posts: 4,522
Quote:
Originally Posted by Jerry View Post
Remai gallery receives national award
By David Hutton,

The StarPhoenix December 16, 2011 12:13 PM


The Remai Art Gallery of Saskatchewan has won a prestigious national award for its design.

The $84-million gallery, designed by Toronto-based architect Bruce Kuwubara, is featured on the cover of this month’s Canadian Architect and is a winner of the magazine’s 2011 Award of Excellence. [...]

Read more: http://www.thestarphoenix.com/Remai+gall...l+award/5872297/story.html#ixzz1gj0afe1e
Awesome news!

There's a great write-up on the gallery on Canadian Architect's website: http://www.canadianarchitect.com/Awards/Remai.aspx

I've really fallen in love with this gallery's design and can't wait to see it go up.
__________________
SASKATOON PHOTO TOURS
2013: [Part I] [Part II] | [2014] | [2016] | [2022-25]
     
     
  #1706  
Old Posted Dec 16, 2011, 10:07 PM
neoen neoen is offline
Registered User
 
Join Date: Oct 2008
Posts: 45
heard a rumor today of who is replacing Googies in the old sunlife / now affinity building on 4th.

Any guesses? I'll give you a hint. We current have MANY of these downtown!
     
     
  #1707  
Old Posted Dec 16, 2011, 10:46 PM
gowest gowest is offline
Registered User
 
Join Date: Feb 2009
Posts: 368
South Bridge

Cameras are now up and running.
     
     
  #1708  
Old Posted Dec 16, 2011, 11:54 PM
Jerry's Avatar
Jerry Jerry is offline
Registered User
 
Join Date: Jan 2007
Location: Saskatoon
Posts: 798
Thanks for letting us know gowest.
     
     
  #1709  
Old Posted Dec 17, 2011, 4:07 AM
kgc087's Avatar
kgc087 kgc087 is offline
Urban Dreamer
 
Join Date: Apr 2008
Location: Saskatoon
Posts: 1,128
Saw photos of the new cathedral and it really is lacklustre in every regard. The only cool thing are the abstract stained glass panels which remind me of a cool Canadian textile designer. The details are pretty minimal and the trussing in the roof was the only thing for me that could save this project and well it's nothing fancy, it's what is required to hold it up, nothing innovative. Sorry for the negativity but I just felt this project had MASSIVE potential and it was really wasted.

That's great news about the gallery! It really is a masterpiece and shows Canadian aesthetic very well! Subtlety and detail! It's pretty much a no brainer we should be saving the trees! Toronto is a concrete oasis and NOTHING grows, it's really quite sad. Saskatoon is incredibly lucky to have so much lush greenery in the central part of the city. Everything should be done to ensure this is maintained and expanded.
__________________
Just be.
     
     
  #1710  
Old Posted Dec 17, 2011, 7:09 AM
dsim249's Avatar
dsim249 dsim249 is offline
Registered User
 
Join Date: Jun 2008
Location: Calgary
Posts: 946
Quote:
Originally Posted by neoen View Post
heard a rumor today of who is replacing Googies in the old sunlife / now affinity building on 4th.

Any guesses? I'll give you a hint. We current have MANY of these downtown!
I can't think of anything that we have many of downtown...
     
     
  #1711  
Old Posted Dec 17, 2011, 7:32 AM
neoen neoen is offline
Registered User
 
Join Date: Oct 2008
Posts: 45
Quote:
Originally Posted by dsim249 View Post
I can't think of anything that we have many of downtown...

a STARBUCKS!!!!
     
     
  #1712  
Old Posted Dec 17, 2011, 7:44 AM
dsim249's Avatar
dsim249 dsim249 is offline
Registered User
 
Join Date: Jun 2008
Location: Calgary
Posts: 946
We only have 2 Starbucks downtown... haha.

But that's sweet. They always attract people. The newest one in the city, on Louise, is always packed.
     
     
  #1713  
Old Posted Dec 17, 2011, 4:56 PM
socialisthorde socialisthorde is offline
Registered User
 
Join Date: Sep 2007
Location: Saskatoon
Posts: 590
Quote:
Originally Posted by neoen View Post
heard a rumor today of who is replacing Googies in the old sunlife / now affinity building on 4th.

Any guesses? I'll give you a hint. We current have MANY of these downtown!
They are tearing down the whole buidling for surface parking?

edit: oops, in after the reveal :-o
     
     
  #1714  
Old Posted Dec 17, 2011, 4:59 PM
socialisthorde socialisthorde is offline
Registered User
 
Join Date: Sep 2007
Location: Saskatoon
Posts: 590
agree on the church KGC. Seems an unfortunate tendency here to have a grand vision and then let cost saving measures turn it lackluster.
     
     
  #1715  
Old Posted Dec 20, 2011, 12:12 PM
Jerry's Avatar
Jerry Jerry is offline
Registered User
 
Join Date: Jan 2007
Location: Saskatoon
Posts: 798
Website Focus Group

For those of you that hate the city's current website here is your chance for some input.

-------------------------------------------------------------------------------------------------------

Website Focus Group

The City of Saskatoon would like to invite you to participate in a Focus Group meeting on Thursday, January 5, either at 9:30 a.m., 1:30 p.m. or 6:30 p.m.


The City of Saskatoon has embarked on the first phase of the Website project. The purpose of the project as a whole is to redesign the City’s webpage, making it function better for all users including the public, business community, civic staff and City Council. [...]

Click Here To Read More
     
     
  #1716  
Old Posted Dec 20, 2011, 2:43 PM
Caswellian Caswellian is offline
Registered User
 
Join Date: Mar 2010
Location: Saskatoon
Posts: 29
All of Cameco's mine-site shipments orginate through their warehouse just northwest of 51st and Millar
     
     
  #1717  
Old Posted Dec 20, 2011, 7:18 PM
Echoes's Avatar
Echoes Echoes is online now
Registered User
 
Join Date: Oct 2006
Location: Saskatoon, SK
Posts: 4,522
Construction activity is ongoing on the main floor of the 2nd Ave Lofts.

Through some of the glass I noticed progress on walls being framed in, as well as for sale/lease signs for the commercial space. I wonder if they're breaking the space up in to smaller spaces in an attempt to finally lease it all? There's room there for quite a few shops, though I have a feeling the eventual tenants will lean more to the commercial office side than retail. However, with the Centro Office Lounge and Fiat Studio in there already, there's potential for a cool mix of businesses there.
__________________
SASKATOON PHOTO TOURS
2013: [Part I] [Part II] | [2014] | [2016] | [2022-25]
     
     
  #1718  
Old Posted Dec 20, 2011, 11:52 PM
Kruzat Kruzat is offline
Registered User
 
Join Date: Aug 2009
Posts: 49
As far as I know they're putting doctors/lawers/dentist/ type stuff in there, but there is still space that isn't spoken for I think? I can't remember what they said at the meeting, I'll try and get more info tho.
     
     
  #1719  
Old Posted Dec 21, 2011, 5:10 PM
drm310's Avatar
drm310 drm310 is offline
Registered User
 
Join Date: Aug 2006
Location: Saskatoon, SK
Posts: 650
Section of Traffic Bridge could be chopped

By David Hutton, The StarPhoenix
December 21, 2011 8:32 AM


If the City of Saskatoon isn't able to lock up funding soon for a new Traffic Bridge, a section of the bridge could be demolished as an interim measure, the city's infrastructure manager says.

"That is definitely an option on the table if the funding of the whole project looks in peril," said Mike Gutek, the city's general manager of infrastructure services.

"It would get traffic moving."

The span of the bridge on the east side of the river that is over land could be pulled down for between $300,000 and $350,000, he estimates. [...]

Read more: http://www.thestarphoenix.com/Section+Traffic+Bridge+could+chopped/5890459/story.html#ixzz1hBqHwITI
     
     
  #1720  
Old Posted Dec 21, 2011, 7:03 PM
Dougler306 Dougler306 is offline
Registered User
 
Join Date: Oct 2011
Location: Regina
Posts: 462
Stoons always loooking for more bridges eh. Reading that SP article makes me glad regina dosent have long spanning bridges like yours. Seems like those maintance costs can really add up. Is this bridge a seperate project from the circle drive bridge project?? Think you would secure funding before you start
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan
Forum Jump



Forum Jump


All times are GMT. The time now is 5:34 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.