Quote:
Originally Posted by skthunder77
Hi everyone,
Has anyone on this forum heard anything definitive or further on the FCC tower "twin" that is rumoured to be going up as soon as crews are done with Tower III?
Last I had heard is that Harvard wants the crew that is currently working on T3 to just "move down the street" and commence on a second FCC tower connected to the first.
Hamilton street would definitively change should that be true.
These are exciting times in Regina.
|
I've heard that FCC's current lease is due in 2015 (not sure if beginning or end of 2015) and that they want the second tower built before signing a new lease. Since this building would be much easier to build than something like a Havard tower 3 (don't need to dig a hole, first two floors already exist, smaller in height and size), I suspect that this one could go up quite quickly, certainly less than 2 years. So if you do the math 2015 minus 2 years max, it would have to start by 2013 at the earliest. I suspect that other factors could determine a start date, like demand for the space vacated by FCC's other office use etc.
As for the height of the second tower, I am not sure, I think I saw a pic of the original plan at one point and seem to think it is taller than the current one but skinnier, however, I may have that backwards. Havard could also change the plan as the existing one must be very old by now..
So I wouldn't expect to here anything in the short term but it's not too far off that's for sure..