Quote:
Originally Posted by MalcolmTucker
So, the trains are going to wait for every car turning right at every intersection, and to enter stations? Usually since right turns have much more capacity than left turns (if there is no advanced green for the left turn) higher capacity transit goes in the middle and left turns are eliminated. Plus every car parking, oversize delivery vehicles would be blocking part of the rail ROW, the list goes on and on.
Denver has curb lanes for LRT in it its downtown, which you can see here,
but the lane is also restricted to trains only, and turns are restricted by downtown Denver being almost exclusively one way streets.
|
What I had envisioned is exactly what Denver has there. The tracks would be train-only so cars obviously wouldn't be allowed to park on them, and some alteration to delivery bays would likely be necessary in some places, though not many. Hollis is 1-way as it is and the way the system is set up, any turns that would cross the tracks would be left turns. Since many other streets downtown are 1-way several can't even be accessed turning left from Hollis. The Robie line may or may not present more challenges - it is a 2-way street but there are few delivery bays fronting onto Robie or Agricola. Just out of curiosity (and so I can respond to your posts with more or less detail as necessary) how familiar are you with the streets of Halifax? My parents are both from Edmonton, and I've been there enough times to notice that the two cities have very little in common when it comes to issues of planning and urban form. I would go as far as to say that they are basically on opposite ends of the spectrum as far as Canadian cities go.
Quote:
|
Originally Posted by someone123
The commuter rail is a shorter term project. It could be built in 2013 or something and then that capital expense would be finished. If streetcars were added 5 years later to complement the commuter rail they would be a separate expense. Halifax could certainly afford something like that if it is planned in a reasonable way and that is worth investigating.
|
For my thesis, I'm proposing multiple phases. Phase 1 would be the use of the existing CN line (or the replacement of the 2nd track if CN can't find a way to achieve temporal separation). Phase 1a, as I'll call it for now, would be the extension down Hollis Street ending at Historic Properties. Phase 2a would be the Robie-Agricola line, 2b would be the North Barrington extension.
Ideally Phase 1 and 1a would happen at the same time. This would make the service more attractive from the start and would work better as a "pilot project", because all other phases would use in-street tracks, so a line down the CN ROW would be a standalone project, not a pilot project. However if this is not possible then Bedford-VIA would still be a good starting point. Ideally HRM would still go with DLRT vehicles (like the Talents) rather than the BUDD cars, even if the initial service is scheduled commuter rail. We would save a lot of money in the long run and stations could be closer together, increasing ridership.
Phases 2a and 2b would likely come a few years later, and do not have to happen in any particular order. 2a could even be broken into two sub-phases, with the first being SMU-Quinpool. This would only require 1 additional train for 10-minute frequency and wouldn't have to deal with the narrow section of Robie right away. The advantage of getting 2a up and running is that it connects basically all of the major attractions on the peninsula outside the downtown core - Dal, SMU, all of the hospitals, NSIT, Spring Garden, the Hydrostone, Quinpool and the Commons to name a few. Phase 2b is contingent on the redevelopment of Cogswell (doesn't make sense to put tracks into a street that will be torn up in a couple years) but since it would service the shipyards it would be worthwhile pretty much from day 1.
I think a realistic timeframe for the system I'm working to be fully implemented is 10-15 years from the launch of Phase 1.