HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure


View Poll Results: Based on options for Broadway Corridor Study, what is your preferred choice?
BRT: Commercial to UBC 25 6.16%
LRT A: Commercial to UBC OR Commercial via VCC to UBC 31 7.64%
LRT B: Main St. to UBC AND Commercial to UBC 18 4.43%
RRT: Commercial to UBC OR VCC to UBC 283 69.70%
COMBO: RRT to Arbutus/LRT to Main St via Arbutus 39 9.61%
BUS: Enhanced Bus Service for all buses to UBC 10 2.46%
Voters: 406. You may not vote on this poll

Closed Thread

 
Thread Tools Display Modes
     
     
  #4561  
Old Posted Sep 20, 2011, 2:21 AM
ChrisK's Avatar
ChrisK ChrisK is offline
Registered User
 
Join Date: Sep 2011
Location: Vancouver, BC
Posts: 15
On the topic of Canada Line access points, does anyone know if a better transfer at Granville will ever be dug out? Seems like it would be pretty straightforward pedestrian tunnel under the intersection of Granville and Georgia.
     
     
  #4562  
Old Posted Sep 20, 2011, 6:42 AM
jsbertram jsbertram is offline
Registered User
 
Join Date: Sep 2009
Posts: 3,245
Quote:
Originally Posted by ChrisK View Post
On the topic of Canada Line access points, does anyone know if a better transfer at Granville will ever be dug out? Seems like it would be pretty straightforward pedestrian tunnel under the intersection of Granville and Georgia.
And where would this new pedestrian tunnel under the intersection go to?

The station already connects to the Pacific Centre and Vancouver Centre malls, and indirectly through those malls to The Bay.

Is there somewhere else it needs to connect to?
     
     
  #4563  
Old Posted Sep 20, 2011, 6:57 AM
jsbertram jsbertram is offline
Registered User
 
Join Date: Sep 2009
Posts: 3,245
Quote:
Originally Posted by theho View Post
One thing to note about the difficulty of doing cut and cover along 10th ave is the VGH hospital complex. There are inter-building tunnels and all sort of hospital utility running under the road. I imagine it would be quite the logistical headache to dig around it all. Tunnelling presumably avoids that difficulty.
TBM tunnelling allows you to go deeper as necessary to get past those pesky problems.

The TBM building the Canada Line tubes didn't have much of a problem staying below the Granville Street sub-surface infrastructure (power cables, water pipes, sewers, telus conduits &tc.) while also crossing the Expo/Millennium line under Dunsmuir.

Even with all the underground obstructions under 10th Ave around VGH, they should be easier to deal with than what has been buried under Broadway for the last the 100+ years. The city engineers like to think they know whats under the city streets, but we all know that there will be some surprises when they start digging down to build the subway stations.

Using a 10th Ave alignment reduces the chances of "showstopper" surprises, since it hasn't been a major route for underground infrastructure like Broadway has been (as still is)

Last edited by jsbertram; Sep 20, 2011 at 7:09 AM.
     
     
  #4564  
Old Posted Sep 20, 2011, 7:07 AM
jsbertram jsbertram is offline
Registered User
 
Join Date: Sep 2009
Posts: 3,245
Quote:
Originally Posted by Old&New View Post
So is it possible to realign the line from broadway to 10th Ave instead?
No construction has been started, so it is possible.

I've recently realised that one advantage of a 10th Ave alignment from Kingsgate Mall to UBC is the jog from Broadway/Alma to 10th/Alma is no longer needed, so there isn't a need to expropriate properties in the area - notably the Chevron station and the strip mall with 7/11 in it.

This should please someone at Translink because not having to expropriate the Chevron property also means not having to pay big bucks to sanitize the site after decades of gasoline spills. They're still PO'd about the extra expense to detox the ground before they could build the King Edward station on the Canada Line.
     
     
  #4565  
Old Posted Sep 20, 2011, 11:09 AM
aberdeen5698's Avatar
aberdeen5698 aberdeen5698 is offline
Registered User
 
Join Date: May 2010
Posts: 4,803
Quote:
Originally Posted by TransitFreak View Post
Expertise is required for designing large projects like this, but if the public isn't given a voice in the matter (real or otherwise), it's hard for them to 'buy in' to the project, no matter how good the merits of the project/idea is..
But come on - they heeded the "one entrance per station" point on the survey? Isn't that's the time for the experts to step up to the plate and say "wait a minute, that will inconvenience people and make the system more difficult to access".

I don't know exactly what or how the survey was taken, but the way questions are worded can have a huge impact on the responses. If there was a question on it that said, for example, "would you like access to Vancouver Central station from Georgia only or from both Georgia and Robson", do you really think people would chose only the one entrance?
     
     
  #4566  
Old Posted Sep 20, 2011, 3:08 PM
Old&New's Avatar
Old&New Old&New is offline
Registered User
 
Join Date: Jun 2011
Posts: 1,537
Quote:
Originally Posted by jsbertram View Post
No construction has been started, so it is possible.

I've recently realised that one advantage of a 10th Ave alignment from Kingsgate Mall to UBC is the jog from Broadway/Alma to 10th/Alma is no longer needed, so there isn't a need to expropriate properties in the area - notably the Chevron station and the strip mall with 7/11 in it.

This should please someone at Translink because not having to expropriate the Chevron property also means not having to pay big bucks to sanitize the site after decades of gasoline spills. They're still PO'd about the extra expense to detox the ground before they could build the King Edward station on the Canada Line.
Anyone have connections to the "authorities" on this? I think a 10th Ave. alignment might be something for them to consider, or reconsider...
     
     
  #4567  
Old Posted Sep 20, 2011, 4:24 PM
Zassk Zassk is offline
Registered User
 
Join Date: Sep 2009
Posts: 2,303
Quote:
Originally Posted by Old&New View Post
Anyone have connections to the "authorities" on this? I think a 10th Ave. alignment might be something for them to consider, or reconsider...
I believe 10th is already considered the best route in the existing documents.
     
     
  #4568  
Old Posted Sep 20, 2011, 4:40 PM
TransitFreak TransitFreak is offline
Registered User
 
Join Date: Oct 2009
Posts: 194
Quote:
Originally Posted by aberdeen5698 View Post
But come on - they heeded the "one entrance per station" point on the survey? Isn't that's the time for the experts to step up to the plate and say "wait a minute, that will inconvenience people and make the system more difficult to access".

I don't know exactly what or how the survey was taken, but the way questions are worded can have a huge impact on the responses. If there was a question on it that said, for example, "would you like access to Vancouver Central station from Georgia only or from both Georgia and Robson", do you really think people would chose only the one entrance?
Don't get me wrong, I wholeheartedly agree with multiple entrance/exit points for select stations (i.e. VCC, Broadway-City Hall and Oakridge come to mind). In fact, they set a precedent with Waterfront where you can go either Hastings or Waterfront proper, so you would think they could do it for some of them. Only think I can think of is that there was no vacant spot on Robson, so they'd have to enter a deal with Cadallac Fairview (Pacific Centre owners) for right-of-way, which may be pricey.
     
     
  #4569  
Old Posted Sep 20, 2011, 6:51 PM
jsbertram jsbertram is offline
Registered User
 
Join Date: Sep 2009
Posts: 3,245
Quote:
Originally Posted by TransitFreak View Post
Don't get me wrong, I wholeheartedly agree with multiple entrance/exit points for select stations (i.e. VCC, Broadway-City Hall and Oakridge come to mind). In fact, they set a precedent with Waterfront where you can go either Hastings or Waterfront proper, so you would think they could do it for some of them. Only think I can think of is that there was no vacant spot on Robson, so they'd have to enter a deal with Cadallac Fairview (Pacific Centre owners) for right-of-way, which may be pricey.
The Vancouver Centre station mezzanine stairs, escalator and elevator were part of the mall level of Pacific Centre and the plaza above - you can take the elevator from the street right into the Pacific Centre parkade under the station mezzanine.

The Robson St. entrance wouldn't need to be part of any other building. Using the Waterfront station as an example, the Hastings mezzanine entrance stairs & escalators are right at the curb of Granville and the elevator shaft is right on the property line -it actually blocks the stairs of the United Kingdom building.

The redevelopment of the SW corner of Robson/Granville (Granville Mall Optical) could have made provisions to connect to a new south entrance for the Vancouver Centre station mezzanine, but it since Translink doesn't want a new Robson St. entrance, there won't be anything for the new building to connect to. The developer isn't even making a provision for a future connection to a Robson St. Mezzanine entrance - which is a missed opportunity.
     
     
  #4570  
Old Posted Sep 20, 2011, 7:10 PM
Old&New's Avatar
Old&New Old&New is offline
Registered User
 
Join Date: Jun 2011
Posts: 1,537
Quote:
Originally Posted by Zassk View Post
I believe 10th is already considered the best route in the existing documents.
For the majority of the line?
     
     
  #4571  
Old Posted Sep 20, 2011, 7:27 PM
Zassk Zassk is offline
Registered User
 
Join Date: Sep 2009
Posts: 2,303
Quote:
Originally Posted by Old&New View Post
For the majority of the line?
The whole way, yes - there is not going to be a subway under Broadway itself at any point.
     
     
  #4572  
Old Posted Sep 20, 2011, 8:05 PM
Old&New's Avatar
Old&New Old&New is offline
Registered User
 
Join Date: Jun 2011
Posts: 1,537


Do you have a link to the existing documents? I would really appreciate getting access to those.
     
     
  #4573  
Old Posted Sep 20, 2011, 8:56 PM
nname nname is offline
Registered User
 
Join Date: Aug 2005
Posts: 5,104
     
     
  #4574  
Old Posted Sep 20, 2011, 9:40 PM
wrenegade's Avatar
wrenegade wrenegade is offline
ON3P Skis
 
Join Date: Sep 2008
Location: Lower Lonsdale, North Vancouver, BC
Posts: 2,594
Quote:
Originally Posted by jsbertram View Post
This should please someone at Translink because not having to expropriate the Chevron property also means not having to pay big bucks to sanitize the site after decades of gasoline spills. They're still PO'd about the extra expense to detox the ground before they could build the King Edward station on the Canada Line.
Although They very well may need to expropriate the Imperial Oil site at the SE corner of 10th/Alma to build a station and would be back in the same boat to clean up the site.
__________________
Flickr
     
     
  #4575  
Old Posted Sep 20, 2011, 9:47 PM
Old&New's Avatar
Old&New Old&New is offline
Registered User
 
Join Date: Jun 2011
Posts: 1,537



Thanks!


Quote:
Originally Posted by awvan View Post
Although They very well may need to expropriate the Imperial Oil site at the SE corner of 10th/Alma to build a station and would be back in the same boat to clean up the site.
Shouldn't Chevron be responsible for cleaning up their own brownfield?
     
     
  #4576  
Old Posted Sep 20, 2011, 10:08 PM
Pinion Pinion is offline
See ya down under, mates
 
Join Date: Jul 2007
Posts: 5,167
To say the Canada line only has one entrance at City Centre is a bit misleading. Most of the buildings from Robson to Dunsmuir and Richards to Howe are connected to it underground. I walked through Sears or the Bay or Pac Centre to get in when I worked there. Unless you're taking a bus going down Georgia st there's little reason to use the "official" escalator.
     
     
  #4577  
Old Posted Sep 20, 2011, 10:24 PM
twoNeurons twoNeurons is offline
loafing in lotusland
 
Join Date: Aug 2002
Location: Lotusland
Posts: 6,123
Quote:
Originally Posted by Zassk View Post
The whole way, yes - there is not going to be a subway under Broadway itself at any point.
Yep. It has been discussed many times before here on SSP. The "Broadway Corridor" encompasses 4th to 16th Avenue:

source: Human Transit

Preliminary station design puts the stations under 10th and the entrances on Broadway. Because 10th is at a higher elevation than Broadway, this allows the station entrances to be almost level with the station (especially if stations are built cut n' cover). You can probably find links to documents in this thread somewhere.

My preference is that the route will be done with a TBM but have stations that are cut n' cover. This will allow for shallow stations with almost level entrances off of Broadway.

This is what the diagrams I have seen (on this site) look like.
     
     
  #4578  
Old Posted Sep 20, 2011, 10:26 PM
aberdeen5698's Avatar
aberdeen5698 aberdeen5698 is offline
Registered User
 
Join Date: May 2010
Posts: 4,803
Quote:
Originally Posted by TransitFreak View Post
Only think I can think of is that there was no vacant spot on Robson, so they'd have to enter a deal with Cadallac Fairview (Pacific Centre owners) for right-of-way, which may be pricey.
Well there's already an emergency exit stairwell that comes up right into the street at Robson & Granville. I can't understand why they couldn't have just widened it.

Quote:
Originally Posted by Pinion View Post
To say the Canada line only has one entrance at City Centre is a bit misleading. Most of the buildings from Robson to Dunsmuir and Richards to Howe are connected to it underground.
First of all that only works when the stores are open. Secondly, it doesn't matter whether you walk through the buildings or not, you still have to make your way northward most of the way to Georgia Street before you can access the station. With a south stairwell you could come out of Future Shop at Robson and Granville, for example, and descend directly into the station instead of having to walk 3/4 of a block north and then 1/2 block south again.
     
     
  #4579  
Old Posted Sep 20, 2011, 10:51 PM
djh djh is online now
Registered User
 
Join Date: Jul 2003
Location: Vancouver
Posts: 1,978
Quote:
Originally Posted by nname View Post
Did anybody notice this line in the study (page 4 - bold emphasis is mine):
Quote:
Combinations Considered

The study considered six alternative combinations of the
three technologies, shown graphically in Figure 2.
The Steering Committee chose these 6 combinations as
the ones that were most practical for the transit rider (i.e.
fewer transfers along the route) and the transit provider
(i.e. cost effective). For example:

A - SkyTrain from Commercial to UBC is theoretically
possible, but, for cost reasons, not likely to be constructed
further west than Arbutus.
     
     
  #4580  
Old Posted Sep 20, 2011, 11:02 PM
bardak bardak is offline
Registered User
 
Join Date: Oct 2010
Posts: 370
Quote:
Originally Posted by djh View Post
Did anybody notice this line in the study (page 4 - bold emphasis is mine):
Do note that the report is over 10 years old. some things have changed since 1999.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 2:40 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.