Quote:
Originally Posted by theho
One thing to note about the difficulty of doing cut and cover along 10th ave is the VGH hospital complex. There are inter-building tunnels and all sort of hospital utility running under the road. I imagine it would be quite the logistical headache to dig around it all. Tunnelling presumably avoids that difficulty.
|
TBM tunnelling allows you to go deeper as necessary to get past those pesky problems.
The TBM building the Canada Line tubes didn't have much of a problem staying below the Granville Street sub-surface infrastructure (power cables, water pipes, sewers, telus conduits &tc.) while also crossing the Expo/Millennium line under Dunsmuir.
Even with all the underground obstructions under 10th Ave around VGH, they should be easier to deal with than what has been buried under Broadway for the last the 100+ years. The city engineers like to think they know whats under the city streets, but we all know that there will be some surprises when they start digging down to build the subway stations.
Using a 10th Ave alignment reduces the chances of "showstopper" surprises, since it hasn't been a major route for underground infrastructure like Broadway has been (as still is)