Quote:
Originally Posted by fenwick16
|
I seems to me Fenwick; that you and I had this debate before. I'm getting the funny feeling of deja vu.
I went through the downtown LUB and normally if a use is not requiring a permit, there is a section that talks about exempting certain uses and under what circumstances. Calgary's LUB has 3 pages (it's quite extensive). I didn't see the convention centre listed either in the peninsula lub or the downtown one, so it still needs at least a development permit and more than likely a building permit.
If I look at (15B); it sounds like any development permit needs to be referred to the design review committee, but only for the qualitative elements "as set out in Section 1.1 b of the Design Manual" (quote from the text).
Section 1.1 b of the design manual is:
b. The qualitative elements of an application (architectural design, streetscape presence, public realm contribution, sustainability, etc.) are
subject to a discretionary approval resulting from a design review process. It is this discretionary process for which the Design Manual is intended.
Additionally, the Design Manual contains criteria by which modest modifications to the quantitative elements of the Land Use By-law may be made through the design review process.
So it wouldn't be the site plan I guess. It would just be the design, etc. The more subjective stuff, versus height, etc.