Quote:
Originally Posted by DarkKeyo
Since you first told me about this idea, I've been interested to know where you would put your high-frequency BRT's and LRT's. I assume the 6 radial LRT and 3 radial BRT corridors, as well as crosstown routes?
|
Actually, the plan I came up with for the BRT and LRT network is very similar to the City's LRT and BRT network plan (of course with a centre street LRT alignment). The important BRTs would be as follows:
1. The current 305- Bowness to International Avenue
2. 16th Avenue North- Peter Lougheed to Foothills/UofC
3. 52nd Street East- From Saddleridge station to SE Hospital (perhaps it will terminate on one SE LRT stations prior to that, which will act as a transfer station)
4. Westside connector- Westbrook/MRU/Rockyview/Heritage Station. Using 37th Street, Glenmore, 14th and Heritage. Future connection to SE LRT and 52nd Street BRT via Heritage and then Glenmore.
5. Marquis of Lorne Trail from Somerset to SE Hospital
6. Blackfoot BRT. From Heritage station via Heritage Drive, along Blackfoot and then continuing along to International Avenue.
This is very similar to the City's BRT network plan, with the addition of the Blackfoot BRT. All of these would utilize dedicated ROWs for the majority of their routes and would all be off-vehicle fare payments, multiple door boardings, signals control and limited stops (For example the BRT from Westbrook to Heritage would stop at 26th Avenue, Richmond Road, MRU, Richard Road Office Park, Rockyview Hospital, Heritage Park, Elbow Drive and Heritage Station).