http://www.calgarytransit.com/html/setway_20110725.html

First public engagements for the SETWAY will be held this Fall
     
     
  #3582  
Old Posted Jul 28, 2011, 10:01 AM
outoftheice outoftheice is offline
Registered User
 
Join Date: Jan 2009
Posts: 914
Does this mean we can now kiss good-bye to the construction of the SE LRT for at least another decade?? The planning process on this link takes us deep into 2012. Add on the investment required to build a seperate BRT right of way and stations and you begin to wonder if we'll ever see an LRT in the SE... Personally I think the SETWAY is a step in the wrong direction.
     
     
  #3583  
Old Posted Jul 29, 2011, 12:19 AM
DarkKeyo DarkKeyo is offline
Transit/Cartography Geek
 
Join Date: May 2008
Location: Burnaby
Posts: 332
Quote:
Originally Posted by UofC.engineer View Post
http://www.calgarytransit.com/html/setway_20110725.html

First public engagements for the SETWAY will be held this Fall
Quoted from the article: "The early phases of the predesign will identify what incremental improvements will serve Southeast Calgary best in terms of improved travel time, reliability and convenience."

Because of the distance involved, you can't really improve any of these with a bus. I can't think of many places on the 302 where you have a choke point that slows things down. Downtown, a bit of Inglewood, along 24 St SE as the road isn't complete, crossing Glenmore, crossing Barlow.... That's about it.

If they want to spend that money, I would do the roadwork on 24 St, and at Glenmore, so that they don't have to do it at the same time as constructing the train. And then grade and prepare the rest of the route for the train.
     
     
  #3584  
Old Posted Jul 29, 2011, 3:10 PM
5seconds 5seconds is offline
Closed account
 
Join Date: Mar 2011
Posts: 935
Quote:
Originally Posted by DarkKeyo View Post
Because of the distance involved, you can't really improve any of these with a bus. I can't think of many places on the 302 where you have a choke point that slows things down. Downtown, a bit of Inglewood, along 24 St SE as the road isn't complete, crossing Glenmore, crossing Barlow.... That's about it.
You can absolutely make improvements with a bus. This is also from the link:

"The City is studying options for staging improvements in the form of bus rapid transit (BRT) on exclusive transitways"

Which means, to me at least, that they would be looking at dedicated bus lanes and roads. If done well, this could bypass many of the choke points you mention. (Or bypass regular traffic, thereby lessening the effect of the unavoidable choke points)

Would it make sense to begin the process of obtaining the land identified in the SELRT plan, and developing that ROW into a dedicated bus route? Would that allow the LRT path to be developed slowly (cost effectively) or would that just cause more work than just sticking the LRT in right away?

I just thought that if they developed the ROW with roads and bridges that would work with BRT, they could build that infrastructure in a way that they could then use it for LRT down the road. Is that crazy?
     
     
  #3585  
Old Posted Jul 29, 2011, 6:58 PM
MalcolmTucker MalcolmTucker is offline
Registered User
 
Join Date: May 2007
Posts: 11,625
Quote:
I just thought that if they developed the ROW with roads and bridges that would work with BRT, they could build that infrastructure in a way that they could then use it for LRT down the road. Is that crazy?
They can do it, but the record of achievement in other municipalities converting a system over usually needs lots of changes. Seattle had to change the floor height of their bus tunnels, Ottawa needs to change their alignment, yet both were 'designed' for LRT.

One has to be really careful not to cut things to save $1 million now, that will cost $100 million later to fix for LRT conversion.
     
     
  #3586  
Old Posted Jul 29, 2011, 9:10 PM
Dado's Avatar
Dado Dado is offline
National Capital Region
 
Join Date: Jul 2007
Location: Ottawa, Canada
Posts: 2,521
Having looked at the SELRT plans and being familiar with Transitway design and operational practise in Ottawa, I'll say this much.

There's little point in building the SETWAY beyond Ogden Station (that's at Ogden Rd SE and 69 Ave SE), other than a couple of missing linkages here and there (connect Shepard Rd SE to 24 St SE, and 40 St SE to 52 St SE). Certainly once onto 52nd there's absolutely no point whatsoever in building a parallel busway. The advantage of an exclusive rapid transit RoW, be it LRT or BRT, is in the constrained areas of Inglewood and Highfield.

You can make a busway convertible, though not by doing things the way Ottawa did, but frankly with the number of structures the SELRT has weaving its way around rail lines and roadways, it doesn't seem worth the extra expense of building wider structures for BRT than are needed for LRT. I don't really see a lot of savings by using BRT rather than LRT in terms of getting out of that difficult area, though there may be "savings" of a sort from not building the north-south tunnel downtown. If you have to push a rapid transit facility through Inglewood, it's going to cost a lot of money regardless of what runs on it.

My recommendation would be to build the SELRT as far as South Hill Station (that would be next to the irrigation canal just south of Glenmore Trail). There's enough space at that station to serve as a transfer facility, something none of the other stations further in have. Beyond there, existing roads with a few linkages as needed would basically do the job. If funds allow, the SELRT could be taken to Douglasdale (114 Ave) since that location has a bit more going for it as a terminus with retail and commercial nearby and being near a Deerfoot interchange, but it is an extra 2.5 km.
__________________
Ottawa's quasi-official motto: "It can't be done"
Ottawa's quasi-official ethos: "We have a process to follow"
     
     
  #3587  
Old Posted Jul 30, 2011, 2:51 AM
DarkKeyo DarkKeyo is offline
Transit/Cartography Geek
 
Join Date: May 2008
Location: Burnaby
Posts: 332
Quote:
Originally Posted by 5seconds View Post
You can absolutely make improvements with a bus. This is also from the link:

"The City is studying options for staging improvements in the form of bus rapid transit (BRT) on exclusive transitways"

Which means, to me at least, that they would be looking at dedicated bus lanes and roads. If done well, this could bypass many of the choke points you mention. (Or bypass regular traffic, thereby lessening the effect of the unavoidable choke points)

Would it make sense to begin the process of obtaining the land identified in the SELRT plan, and developing that ROW into a dedicated bus route? Would that allow the LRT path to be developed slowly (cost effectively) or would that just cause more work than just sticking the LRT in right away?

I just thought that if they developed the ROW with roads and bridges that would work with BRT, they could build that infrastructure in a way that they could then use it for LRT down the road. Is that crazy?
The land is already being acquired; what doesn't make sense to me is developing a ROW twice, for two slightly different purposes. And unlike the Ottawa transitway (which, as in the last two posts, is the best example to use here) we would still want to start the SELRT within a 10 year time frame.

And buses, even on a dedicated transitway, travel a lot slower than LRT, and the distance here is the biggest factor in travel time. And designing the bus system in the SE to feed into LRT stations, which wouldn't be effective with BRT stations, is the biggest factor in convenience.

Quote:
Originally Posted by Dado View Post
The advantage of an exclusive rapid transit RoW, be it LRT or BRT, is in the constrained areas of Inglewood and Highfield.

I don't really see a lot of savings by using BRT rather than LRT in terms of getting out of that difficult area, though there may be "savings" of a sort from not building the north-south tunnel downtown. If you have to push a rapid transit facility through Inglewood, it's going to cost a lot of money regardless of what runs on it.

My recommendation would be to build the SELRT as far as South Hill Station (that would be next to the irrigation canal just south of Glenmore Trail). There's enough space at that station to serve as a transfer facility, something none of the other stations further in have. Beyond there, existing roads with a few linkages as needed would basically do the job. If funds allow, the SELRT could be taken to Douglasdale (114 Ave) since that location has a bit more going for it as a terminus with retail and commercial nearby and being near a Deerfoot interchange, but it is an extra 2.5 km.
Just to comment on the bolded points here... Most of the cost of this project is Downtown, most of the rest of it is in Inglewood. Stopping it at Douglasdale could work, but past Douglasdale is the cheapest part of the line.

Ultimately, temporary improvements won't really have any benefit. We should be "saving up" in order to build the entire line at once. In the SE corridor, the final train is really the only solution to the area's own unique transit problem, so that's really all we need to build. The work being done now (acquiring the land, preparing station area plans, deciding on NCLRT so that it can definitively be linked or not to the SELRT) is the right step towards that; this SETWAY idea is not.
     
     
  #3588  
Old Posted Aug 1, 2011, 2:46 AM
srperrycgy's Avatar
srperrycgy srperrycgy is offline
I'm the bear on the right
 
Join Date: Jun 2004
Location: Calgary (Killarney)
Posts: 1,670
Olympic Plaza Demolition:


OlympicPlaza-07312011-1 by srp775, on Flickr
__________________
Stevinder.
* * * * * *
     
     
  #3589  
Old Posted Aug 2, 2011, 4:52 AM
armorand93's Avatar
armorand93 armorand93 is offline
Transit Nerd
 
Join Date: Nov 2010
Location: Calgary (former Winnipegger)
Posts: 2,707
Are they doing Renovations or completely axing it? Sorry, Winnipegger
     
     
  #3590  
Old Posted Aug 2, 2011, 4:54 AM
frinkprof's Avatar
frinkprof frinkprof is offline
Registered User
 
Join Date: Sep 2006
Location: The Gary
Posts: 4,865
Quote:
Originally Posted by armorand93 View Post
Are they doing Renovations or completely axing it? Sorry, Winnipegger
It is being demolished because it has been replaced by the new platform on the north side of the City Hall block to the east, which is now open.
     
     
  #3591  
Old Posted Aug 2, 2011, 2:11 PM
freeweed's Avatar
freeweed freeweed is offline
Home of Hyperchange
 
Join Date: Sep 2006
Location: Dynamic City, Alberta
Posts: 17,568
Seen on LRT platform today:

"Real time C-Train information coming August 2011"

*blink*

"August 2, 2011"

*repeat*

Just struck me as funny. Put a damn deadline on things and announce it!
     
     
  #3592  
Old Posted Aug 2, 2011, 2:51 PM
polishavenger polishavenger is offline
Registered User
 
Join Date: Oct 2002
Posts: 2,499
I drove past the new city hall platform last night and both sides had their LED's going, it was quite trippy, almost rave like. I guess they must have been testing them or something.
     
     
  #3593  
Old Posted Aug 2, 2011, 2:53 PM
armorand93's Avatar
armorand93 armorand93 is offline
Transit Nerd
 
Join Date: Nov 2010
Location: Calgary (former Winnipegger)
Posts: 2,707
Quote:
Originally Posted by frinkprof View Post
It is being demolished because it has been replaced by the new platform on the north side of the City Hall block to the east, which is now open.
Ahh, alrighty
     
     
  #3594  
Old Posted Aug 3, 2011, 10:11 PM
mersar's Avatar
mersar mersar is offline
Registered User
 
Join Date: May 2006
Location: Calgary, AB
Posts: 10,083
Quote:
Originally Posted by freeweed View Post
Seen on LRT platform today:

"Real time C-Train information coming August 2011"

*blink*

"August 2, 2011"

*repeat*

Just struck me as funny. Put a damn deadline on things and announce it!
They've been doing some testing, supposedly Bridgeland has had actual data showing on it sporadically for the past few days
__________________

Live or work in the Beltline? Check out the Official Beltline web site here
     
     
  #3595  
Old Posted Aug 3, 2011, 10:25 PM
Radley77's Avatar
Radley77 Radley77 is offline
The City That Moves
 
Join Date: Sep 2008
Location: Bridgeland, Calgary
Posts: 1,450
Quote:
Originally Posted by mersar View Post
They've been doing some testing, supposedly Bridgeland has had actual data showing on it sporadically for the past few days
Yeah, I can confirm Bridgeland station was working in both directions as I jogged over to St. Patrick's island last evening. As an occasional user of public transit, it was nice to see the frequency of trips.

It'd be extra cool if during special events this might be remotely programmed with Go Flames Go! I really appreciate when the buses have those cute messages or the operator of the train has a morning greeting and weather report for the day.
     
     
  #3596  
Old Posted Aug 3, 2011, 11:26 PM
DizzyEdge's Avatar
DizzyEdge DizzyEdge is offline
My Spoon Is Too Big
 
Join Date: Oct 2006
Location: Calgary
Posts: 9,162
Are the boards single colour LED or LCD screens?
__________________
Concerned about protecting Calgary's built heritage?
www.CalgaryHeritage.org
News - Heritage Watch - Forums
     
     
  #3597  
Old Posted Aug 4, 2011, 2:06 PM
freeweed's Avatar
freeweed freeweed is offline
Home of Hyperchange
 
Join Date: Sep 2006
Location: Dynamic City, Alberta
Posts: 17,568
Quote:
Originally Posted by DizzyEdge View Post
Are the boards single colour LED or LCD screens?
I'm pretty sure the former. And thank dog. I can't imagine the stupidity that would ensure with full colour LCD screens - anything to make it unreadable but "pretty".

Speaking of screens, I noticed a route number on the front of a C-Train the other day. I've never actually seen this, they've always just had the destination name. It's about time - if it wasn't for you folks, I don't think I'd actually know that we even have route numbers. And yet the schedules and such refer to them - but how is the average person supposed to know that "Crowfoot" is the 201?
     
     
  #3598  
Old Posted Aug 4, 2011, 2:52 PM
DizzyEdge's Avatar
DizzyEdge DizzyEdge is offline
My Spoon Is Too Big
 
Join Date: Oct 2006
Location: Calgary
Posts: 9,162
Quote:
Originally Posted by freeweed View Post
I'm pretty sure the former. And thank dog. I can't imagine the stupidity that would ensure with full colour LCD screens - anything to make it unreadable but "pretty".
Ah ok. I was thinking the lcd screens in the Toronto subway were cool, but of course that's indoor under controlled lighting.
__________________
Concerned about protecting Calgary's built heritage?
www.CalgaryHeritage.org
News - Heritage Watch - Forums
     
     
  #3599  
Old Posted Aug 4, 2011, 3:52 PM
Cage Cage is offline
Registered User
 
Join Date: Oct 2010
Location: YYC
Posts: 2,750
Quote:
Originally Posted by freeweed View Post
Speaking of screens, I noticed a route number on the front of a C-Train the other day. I've never actually seen this, they've always just had the destination name. It's about time - if it wasn't for you folks, I don't think I'd actually know that we even have route numbers. And yet the schedules and such refer to them - but how is the average person supposed to know that "Crowfoot" is the 201?

Route numbers for the C-train have historically been not required, however with the implementation of OBMF yard, there are quite a few Crowfoot to McKnight/Westwinds trains. Leaping off this idea I think there warrants another route designation for these trains.

For Example:
201 - Crowfoot to/from Somerset
202 - McKnight to from City Centre (future 69th Street)
203 - Crowfoot to/from McKnight
204 - Somerset to/from 69th Street

Alternately Ctrain could really redesign the routing to reflect Downtown as a terminus for all inbound core trains. For example:
201 - Somerset to Downtown
202 - McKnight to Downtown
203 - Crowfoot to Downtown
204 - 69th Street to Downtown
Once trains get downtown they could be reassigned to a new route. This would be helpful for instances where there is a traffic disruption on one of the lines.
     
     
  #3600  
Old Posted Aug 4, 2011, 5:28 PM
freeweed's Avatar
freeweed freeweed is offline
Home of Hyperchange
 
Join Date: Sep 2006
Location: Dynamic City, Alberta
Posts: 17,568
Not a bad idea. I like it.

This will become more and more important once we have many more lines in 20 years time. I suspect we'll just go with colours like everyone else has.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Calgary > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 9:11 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.