Housing in greater Downtown is almost at boom levels again, with about 2,200 units underway in perhaps 2000 acres. Not as much as the 2007 peak (over 5,000 at one point), or possibly even the 2000 era, but still pretty good, particularly since all but 300 started very recently. This includes a couple projects still in site prep mode, which might mean they're waiting for building permits or notice to proceed from their clients. I'm jumping the — a little.

After I typed the first paragraph I took a walk. Had to check on a 118-unit project that got a building permit on Friday. It hasn't started yet. Not part of my count.

Another project, a 285-unit six-story building on Lower Queen Anne that I'm still calling site prep, appeared on the same walk to be spending real money....not sure if they're officially shoring yet (would need a shoring permit), but they've piled soldier piles and lagging onsite, the piles of dirt are taller than their backhoes, and they've temp paved the "side street" side of the site (will be a wider sidewalk and a small fringe at live/work units).

The other project in site prep has taken their high-revenue-generating parking lot offline and cut down the trees within their property, and also had a backhoe or two parked there a week ago. This is a 208-unit, 16-story project in the narrow strip of mostly historic buildings between the Financial District and the Central Waterfront, a block from the ferry terminal. Seattle's phenomenal business paper, the Daily Journal of Commerce, which focuses on construction projects and without which I'd die, is located across the street and heard that workers thought it was a June start. Of course, workers have varying definitions of "start" just as people do on SSP. Possibly it meant when the first major permit was awarded along with official notice to proceed from the owner.
Reply With Quote
     
     
  #2342  
Old Posted Jun 7, 2011, 6:50 AM
alki alki is offline
Registered User
 
Join Date: Apr 2011
Posts: 2,647
Not a hi rise and not a newbie but a building that will have a big impact on downtown. The Gates Foundation is starting to move in:



http://www.queenanneview.com/2011/05/25/...nvites-community-to-opening-celebration/

Original Post by mhays>

Quote:
Housing in greater Downtown is almost at boom levels again, with about 2,200 units underway in perhaps 2000 acres. Not as much as the 2007 peak (over 5,000 at one point), or possibly even the 2000 era, but still pretty good, particularly since all but 300 started very recently. This includes a couple projects still in site prep mode, which might mean they're waiting for building permits or notice to proceed from their clients. I'm jumping the — a little.
Not just downtown......at least 1000 units are planned or in the ground in Capitol Hill. Lots of construction in Ballard and West Seattle as well.
Reply With Quote
     
     
  #2343  
Old Posted Jun 7, 2011, 3:34 PM
mhays mhays is offline
Never Dell
 
Join Date: Jul 2001
Posts: 21,291
By "greater Downtown" I included the near parts of Capitol Hill and the back side of First Hill, including 230 Broadway, 13th & Madison, SU housing, etc.
Reply With Quote
     
     
  #2344  
Old Posted Jun 8, 2011, 1:22 AM
alki alki is offline
Registered User
 
Join Date: Apr 2011
Posts: 2,647
Original post by mhays>

Quote:
By "greater Downtown" I included the near parts of Capitol Hill and the back side of First Hill, including 230 Broadway, 13th & Madison, SU housing, etc
Oops! Misunderstood. Not as much development as I thought.
Reply With Quote
     
     
  #2345  
Old Posted Jun 10, 2011, 2:18 PM
alki alki is offline
Registered User
 
Join Date: Apr 2011
Posts: 2,647
Great photo gallery of buildings under construction; then shown completed.

Time Passages(they grow up so fast}

http://hugeasscity.com/2010/01/01/time-passages-they-grow-up-so-fast/
Reply With Quote
     
     
  #2346  
Old Posted Jun 12, 2011, 5:54 PM
mhays mhays is offline
Never Dell
 
Join Date: Jul 2001
Posts: 21,291
That 2,200 units is pretty official now. The LQA site is in mass excavation and shoring now, which is officially major construction. The Western Ave site was drilling for their shoring the other day, or so it appeared in a photo posted on SSC, along with scraping their site.
Reply With Quote
     
     
  #2347  
Old Posted Jun 12, 2011, 9:55 PM
mhays mhays is offline
Never Dell
 
Join Date: Jul 2001
Posts: 21,291
Took a walk today. Another project has started.

A 56-unit "apodment" project has started on the back side of First Hill, near Seattle University. Phenomenal concept for affordable housing: Tiny units (avg 180 sf), no elevator (a few units will be wheelchair-accessible), shared kitchen plus kitchenettes in the units, no parking. Due to the low building square footage, the project avoided the design review process. Small 4,800 sf site that used to be a house. In other words, they saved huge time and money. Rents at a similar building that the same developer just opened are $495 to $675, with this new building likely to be a bit higher due to closer-in location.

I love projects like this for several reasons, not the least being that they support low-income lifestyles, and lives lived around town rather than at home. Having built a few so far, the developer is reportedly getting calls all the time from others who want their "secret sauce," according to the Daily Journal of Commerce (sorry, passworded).

The Western Ave project I mentioned, a 16-story apartment within a golf shot of the Financial District, is drilling along their site perimeter and I'd call that a real start.
Reply With Quote
     
     
  #2348  
Old Posted Jun 27, 2011, 4:49 AM
Vashon118's Avatar
Vashon118 Vashon118 is offline
Registered User
 
Join Date: Nov 2005
Location: Vashon, WA
Posts: 950
6th and Blanchard (06/09):









1200 Madison (06/11):





















Colman Tower (06/23):



Alto Apartments (06/13):



























Reply With Quote
     
     
  #2349  
Old Posted Jun 30, 2011, 3:52 PM
alki alki is offline
Registered User
 
Join Date: Apr 2011
Posts: 2,647
@ Vashon

Great pics! Thanks.

Looks like Touchstone is getting ready to do another project:

Touchstone Buys Parcel from Seattle Times

Touchstone, one of the Seattle area's busiest developers, has acquired another South Lake Union block that is ripe for redevelopment.

The company paid The Seattle Times Co. $18.4 million for the 2.5-acre Troy Laundry block, which is just across the street from Amazon.com's burgeoning new headquarters complex.

The block, bounded by Fairview Avenue North, Thomas Street, Boren Avenue North and Harrison Street, is just north of The Times' headquarters. It is dominated by the Troy Laundry building, a former commercial laundry built in 1927 and used mostly for storage since The Times bought it in 1985.

The building's brick and terra-cotta façade is a historic landmark and must be integrated into any new development.

Touchstone has no immediate plans for the property. "We're still exploring the feasible development options," principal Douglas Howe said.

The acquisition is the second for Touchstone in South Lake Union in the past year. Last August it purchased most of the block just southeast of the Troy block from Cascade Natural Gas. Touchstone recently put the eastern half of that block up for sale, marketing it as an apartment-development opportunity.

Once-neglected South Lake Union is Seattle's fastest-changing neighborhood. More than 4 million square feet of office space and 2,300 apartments and condos have been built there since 2000, and another 1,000 apartments are in the pipeline.

Zoning now limits any new development on the Troy block to 65 feet in height. But city officials are considering rezoning the neighborhood to permit higher-density development; under one option, buildings on the Troy property could rise to 300 feet.

In addition, The Times recently asked the City Council to rezone the block to permit residential use. Howe declined to comment on whether Touchstone will continue to pursue the rezone.

The Times has been trying to sell the Troy block for nearly three years. In recent months the company had been asking $20 million for the property. It is assessed for tax purposes at $13.7 million.

Proceeds from the sale will be used to pay down debt and meet pension obligations, said a prepared statement from The Times.

Earlier this year The Times sold another South Lake Union property, the eight-story 1000 Denny office building, to California investors for $36 million, and said it would become the building's prime tenant, vacating its headquarters of 81 years.

The company intends to eventually redevelop the headquarters block and the block to the south, at Fairview and Denny Way, that now is mostly a parking lot.

Touchstone has been developing property in the Seattle area for 20 years. Last year Howe said the private company hoped to break ground in 2012 on a 15-story office, hotel and retail project in downtown Bellevue.

He also said Touchstone was working to assemble several blocks for eventual redevelopment in Seattle's Denny Triangle neighborhood around Boren Avenue and Stewart Street, where the company has acquired two parcels in recent years.

Touchstone projects further down the pipeline include redevelopment and expansion of Kirkland's Parkplace shopping center and a five-story, 228,000-square-foot office or biotech project just north of Gas Works Park in Seattle.

In 2010 the company completed West 8th, a 28-story office tower in the Denny Triangle that is about one-third leased.

http://o.seattletimes.nwsource.com/html/businesstechnology/2015284837_troy11.html
Reply With Quote
     
     
  #2350  
Old Posted Jun 30, 2011, 8:55 PM
mhays mhays is offline
Never Dell
 
Join Date: Jul 2001
Posts: 21,291
A 285-unit project has scraped their site and installed a triple-wide jobsite office. This is 901 Dexter or thereabouts. Typical Seattle infill with five levels of woodframe over one level of concrete. That puts us in the 2,600-unit range for greater Downtown assuming it's a real start.
Reply With Quote
     
     
  #2351  
Old Posted Jul 12, 2011, 5:42 PM
mhays mhays is offline
Never Dell
 
Join Date: Jul 2001
Posts: 21,291
The 285-unit project at 901 Dexter announced that today is their official start. They had already cleared the site, started layout, moved a triple-wide onsite, etc.

So we're around the 2,600 figure for greater Downtown.

Per an article in the Seattle Times this weekend, 85% of the apartment construction in King and Snohomish Counties (pop 2.6 mil) is within Seattle, and most of that is in core urban districts. That's quite a departure from the past, with, iirc, less than 30% of the region's apartments currently in Seattle, and 43% of the apartment completions within Seattle from 1996-2011.

Basically, construction costs are higher in Seattle, particularly in core urban districts, but rents are way higher and it's a surer bet. Seattle has also relaxed or eliminated its parking requirements in many of these districts (parking is typically required except in/near the CBD), which saves a large amount of money.
Reply With Quote
     
     
  #2352  
Old Posted Jul 13, 2011, 6:04 AM
mhays mhays is offline
Never Dell
 
Join Date: Jul 2001
Posts: 21,291
How about a tally of other stuff getting built around greater Downtown:

Non-Residential:

1. Light rail tunnel from Downtown to Capitol Hill and U-District, extending current line. Tunnel boring machines are underway.

2. Redo of highway 99 south of Downtown. This is in preparation for putting the central portion of 99 into a 9,000' deep tunnel through the CBD, so we can eliminate the viaduct along the waterfront, the existing six block tunnel, and a few blocks of divided highway north of Denny.

3. Amazon's 10th new headquarters building. 12 stories. Starting to rise from the hole.

4. Renovation of King Street Station for commuter rail and Amtrak. Upgrades to the historic (small) station nearing completion for this phase, which is the largest of a series of upgrades, basically putting it past the 2/3 point. Future phases aren't imminent.

5. Virginia Mason Medical Center addition. Seven story addition is nearing completion.

6. Home Plate Center. Five(?) story office building in structural stage. Haven't been by in a while. Named because it's near Safeco Field.

7. Puget Sound Blood Center. Research center taking over building recently vacated when the Gates Foundation moved to its new campus on the edge of Downtown. (Also planning to filling other office buildings built in the last boom are Fred Hutchinson Cancer Research Center and the Polyclinic...love the life sciences helping cut the office oversupply.)

8. Mercer Redo Phase I. Turning a wierd switcheroo of streets into a single boulevard with the second street becoming two lanes. Underway in a multi-year switch. Heavy stimulus funding.

9. University of Washington, South Lake Union satellite research center Phase 3.1. New seven(?) story laboratory across the street from existing labs. Just broke ground last week. First of three buildings on new block.

10. Museum of History and Industry. Renovation underway at historic former Navy Reserve Building on Lake Union. Museum will move from a few miles away.

11. Just a TI, but significant. Nordstrom Rack is moving from Second & Pine a couple blocks to the basement and part of the first floor of Westlake Center, our #2 retail atrium center.

12. Target. They bought a 102,000 sf commercial base of a condo building last year, announced a new store, and did interior demo then. After a pause, there's activity again. Not sure what that means.

(Since I mentioned tenant improvement work, I'm being really scattershot. Every city has numerous tenant improvements (TIs) happening at any moment, whether office, retail, healthcare, lab, whatever. Good economies spur some TIs, and bad economies spur many others, as companies time their moves to today's cheap leases, or downsize, or merge, or whatever. Or they renovate in place.
Reply With Quote
     
     
  #2353  
Old Posted Jul 19, 2011, 12:01 AM
alki alki is offline
Registered User
 
Join Date: Apr 2011
Posts: 2,647
Hey, it ain't a skyscraper but you take what you can get!

7-story, 171-unit apartment and hotel coming to Seattle Center



In about 18 months, Kauri Investments plans to start building a seven-story hotel/apartment complex near the Seattle Center on Fifth Avenue North between Broad Street and John Street.

Kent Angier, president and CEO of the Seattle-based Kauri, said the top two floors will have 55 apartments with 116 hotel rooms on the five floors below.

The Young's Accounting and Cafe Bee building is not part of the project site. It is separated by a small alleyway.

The complex should open 36 to 42 months from now, depending on how long it takes to get permits.

Kauri purchased the 16,966-square-foot Fifth Avenue site in late 2008. It paid Triad Development $5.69 million for the parking lot.


http://queenanne.komonews.com/news/devel...t-and-hotel-coming-seattle-center/653414
Reply With Quote
     
     
  #2354  
Old Posted Jul 19, 2011, 1:56 AM
mhays mhays is offline
Never Dell
 
Join Date: Jul 2001
Posts: 21,291
Apartment applications are swarming these days, but this is the first Downtown hotel plan in a while (for hotel purposes, I'm calling the Space Needle area Downtown, though it's not CBD proper).

We had Downtown or greater Downtown hotels under construction at all times from 1995-2010 per my recollection, adding what I've estimated was 5,500 of our current 12,000 rooms. This one might not be the first to start, but hopefully hotel construction will at least only have the two-year hiatus.

PS, an eight-story, 100-unit apartment at Second & Bell in Belltown appears to be starting. They parked a couple backhoes onsite today, and moved the fence out to cover one sidewalk. I wouldn't call that an official start but it's pretty likely. That makes the underway number about 2,700 units for greater Downtown.
Reply With Quote
     
     
  #2355  
Old Posted Jul 19, 2011, 2:25 AM
alki alki is offline
Registered User
 
Join Date: Apr 2011
Posts: 2,647
Originally posted by mhays

Quote:
We had Downtown or greater Downtown hotels under construction at all times from 1995-2010 per my recollection, adding what I've estimated was 5,500 of our current 12,000 rooms. This one might not be the first to start, but hopefully hotel construction will at least only have the two-year hiatus.
I think part of the problem has been that convention and tourism have been off for most of the past three years. Demand for hotel space has just not been there. Last time I checked, convention business was still off and hotel rates were down from last year. Tourism seems to be picking up though........I noticed when driving to Vancouver recently a number of license plates from the hot states like AZ and TX, trying to cool off. Haven't seen that much until this summer. I am also seeing a lot more out of state plates in the city for the first time in 3 years......which suggests things are returning to normal. All anecdotal stuff but it is what it is.

So maybe in the next year we'll see a pick up in hotel construction and in two years, a new office bldg may break ground.
Reply With Quote
     
     
  #2356  
Old Posted Jul 19, 2011, 2:41 AM
mhays mhays is offline
Never Dell
 
Join Date: Jul 2001
Posts: 21,291
Office buildings have broken ground. Two are underway on the Downtown fringes. As for the CBD proper, it's a good sign that Class A+ view space and cool techy space is doing pretty well already...

As for hotels, occupancy rates are pretty healthy again, but room rates are still way lower. Combine the two, and revenue per available room (RevPAR) is still low. It's hard to say when certain types of projects will pencil, because that depends way more on site-specific variables, way more than offices do, and I'm not aware of an easy guideline. Tourism as a whole seems to be ok. But the tourists are being much cheaper.

On the anecdotal level, greater Downtown seems to be doing well, as the touristy districts seem packed like every summer, or more so. Of course that goes way beyond hotel guests...also people staying with friends, cruise passengers taking a few hours before heading for the ship, day-trippers from Vancouver and Portland, local staycationers, etc.
Reply With Quote
     
     
  #2357  
Old Posted Jul 20, 2011, 6:06 AM
alki alki is offline
Registered User
 
Join Date: Apr 2011
Posts: 2,647
Quote:
Office buildings have broken ground. Two are underway on the Downtown fringes. As for the CBD proper, it's a good sign that Class A+ view space and cool techy space is doing pretty well already...
Besides the obvious big users like Amazon, Dendreon, a biotech with a new cancer vaccine, is gobbling up office space downtown. Another downtown biotech, Oncothyreon, is also working on a cancer vaccine that looks promising. Assuming FDA approval, Seattle will have two major biotechs taking up some serious space DT.

Unfortunately, last I looked, the vacancy rate for the CBD was 18%. It has to come down some before any developer will start putting up a major building.
Reply With Quote
     
     
  #2358  
Old Posted Jul 20, 2011, 6:14 AM
alki alki is offline
Registered User
 
Join Date: Apr 2011
Posts: 2,647
Apartment developers bypass suburbs, target Seattle

More new apartments will come on the market in King and Snohomish counties in 2013 than in any year since 1991, one researcher projects. This apartment boom, however, is different from those that preceded it. This time it's focused almost entirely on Seattle. Developers, for the most part, are bypassing the suburbs.

By Eric Pryne

Seattle Times business reporter

Three giant cranes — one red, two yellow — have taken up residence along a one-mile stretch of Seattle's Madison Street over the past six months.

Beneath each one a new apartment complex is taking shape. Together, they'll contain more than 470 units.

Apartment development is a cyclical business, and right now it's on a big upswing in the Seattle area. More new apartments will come on the market in King and Snohomish counties in 2013 than in any year since 1991, one researcher projects.

This apartment boom, however, is different from those that preceded it.

This time it's focused almost entirely on Seattle. Developers, for the most part, are bypassing the suburbs.


The city accounts for 85 percent of all the apartments under construction — and 90 percent of all units in the pipeline — in King and Snohomish counties, says Tom Cain, president of research firm Apartment Insights Washington.

Most of those projects are in Seattle's close-in, highest-density neighborhoods. It's unprecedented, Cain says.

Another research firm, Dupre + Scott Apartment Advisors, measures a bit differently but reaches the same conclusion: It projects 85 percent of the unsubsidized units to be finished in the two counties between 2012 and 2015 will be built in Seattle.

In contrast, between 1996 and 2010, the city accounted for just 43 percent of the region's new apartments.

"It's a huge shift," says principal Mike Scott.


Sudden rebound

More than 3,000 apartment units are under construction in Seattle.

Developers began racing to get new apartments out of the ground here and elsewhere after the apartment industry suddenly rebounded a year ago.

Vacancy rates, which had been rising, started to fall. Rents, which had been slipping, began climbing again.

Observers attributed the turnaround to a host of influences: foreclosed homeowners re-entering the rental market; an economic recovery that was sufficiently strong to allow some young adults to finally move into their own places; and growing disillusionment with homeownership.

Thanks to the recession, however, there was little new supply on the horizon to meet this surge in demand: In King and Snohomish counties, 2011 is shaping up as the worst year for new-project completions since at least 2004.

Now apartment developers are rushing to fill that gap, inspired in part by projections that growing demand will continue to push rents up — perhaps another 25 percent by 2015, Scott projects.

In the Greater Seattle market, economic, demographic and political forces are combining to draw those developers to the city rather than outlying areas.

Since April, Vancouver, Wash.-based Holland Partner Group has broken ground on two projects — one on First Hill, the other in South Lake Union — with a total of more than 500 apartments. It hopes to start building another 102-unit South Lake Union complex before the end of the year.

"The big driver is jobs," says Tom Parsons, who heads Holland's Pacific Northwest development team, "and a lot of the new jobs are downtown" — Amazon.com, the Gates Foundation, tech and biotech companies.

With traffic still a headache, living close to work — perhaps without a car — should appeal to many, Parsons says.

Then there's the big "echo boom" generation, people in their 20s and early 30s just entering the housing market.

People that age have always mostly been renters, Scott of Dupre + Scott says — "It's just that there's more of them now... . It's the biggest surge of young people we've seen since the baby boom."

They're even more inclined than their predecessors to rent rather than buy, many observers say — in part because the real-estate bust has made them wary, in part because renting gives them more flexibility to go where the jobs are.

And when they choose an apartment, "they want to be in the city," Parsons says. "They want to be where the action is."

Many developers are building smaller, comparatively affordable units to accommodate them.

The echo boomers will accept less space if it's in the right neighborhood, builders say.

The local portfolio of AvalonBay Communities, one of the nation's biggest apartment developers, consists almost entirely of Eastside and Snohomish County complexes. Now, however, it's building a 204-unit project on Lower Queen Anne.

A 272-unit project by Avalon in Ballard is scheduled to break ground in the fall, followed by a 385-unit University District complex next year.

Policies paved way

Brian Fritz, who heads the company's local development office, says city policies, including recent zoning changes, have paved the way for such large projects and helped lure developers.

"They're not just embracing density," he says of city officials. "They're promoting it."

Proposed apartment projects also tend to pencil out better in Seattle, Fritz says, because rents are higher in the city.


The average apartment in King and Snohomish counties rented for $1,072 this spring, according to Apartment Insights Washington.

In downtown, Belltown and South Lake Union, in contrast, the average rent was $1,464. It topped $1,200 on First Hill, Capitol Hill, Queen Anne and the near North End.

Close-in Seattle neighborhoods also had the region's lowest vacancy rates — 3.5 percent on First Hill, for instance, compared with 4.7 percent regionwide.

All those numbers matter to investors and lenders when they're deciding where to put their development dollars, says Apartment Insights' Cain.

What's more, "there's always a perception of lower [financial] risk when you're close in," says Tracy Edgers, a Wells Fargo Bank senior vice president who heads its Seattle real-estate banking group.

Apartments are more numerous and better established in the city than many suburbs, he says: "I can assess the market a lot better."

Equity funds have raised billions to invest in real-estate development, says Seattle land-use economist Matthew Gardner, and for now apartments — especially in-city apartments with higher projected rents — offer the healthiest potential returns.

Office vacancy rates, while declining, remain relatively high. With many recently built condos still unsold, it will be years before another project is built, Gardner predicts.

"Apartments, in my opinion, are the only feasible development form for now," he says, "and the city of Seattle has a lot going for it."

http://seattletimes.nwsource.com/html/businesstechnology/2015562249_cityapartments10.html
Reply With Quote
     
     
  #2359  
Old Posted Jul 20, 2011, 3:48 PM
mhays mhays is offline
Never Dell
 
Join Date: Jul 2001
Posts: 21,291
Quote:
Originally Posted by alki View Post
Besides the obvious big users like Amazon, Dendreon, a biotech with a new cancer vaccine, is gobbling up office space downtown. Another downtown biotech, Oncothyreon, is also working on a cancer vaccine that looks promising. Assuming FDA approval, Seattle will have two major biotechs taking up some serious space DT.

Unfortunately, last I looked, the vacancy rate for the CBD was 18%. It has to come down some before any developer will start putting up a major building.
...Definitely, in terms of major buildings. But we have a couple of build-to-suits going on already, with Amazon and the new UW SLU start (a lab, not an office), and that could continue despite the economy. If someone wants a whole building, or to be in a certain district, or has particular needs, that can be the way to go.

The vacancy rate is high. But vacancies for A+ and "cool" space are much lower than A- or B space. Good lab space is also getting pretty tight. There may be niches. Meanwhile, conversions of vacant offices can work, whether it's the Polyclinic taking over an office building at 7th & Madison, or a residential conversion, or a lab conversion, etc. Labs and housing have specific needs that limit the number of buildings appropriate to each (such as bay depth for housing, and floor stiffness and floor-to-floor heights for labs), but projects can be very successful when it's right.
Reply With Quote
     
     
  #2360  
Old Posted Jul 20, 2011, 8:22 PM
mSeattle's Avatar
mSeattle mSeattle is offline
Socialism 4 Extreme Rich?
 
Join Date: Dec 2002
Location: here
Posts: 10,073
Speaking of Madison Street which is slowly coming into its own - just needs a streetcar. As of 7/19/11...

Cascadia Center Construction Underway (Pictures)
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Global Projects & Construction > City Compilations
Forum Jump



Forum Jump


All times are GMT. The time now is 10:11 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.