Quote:
Originally Posted by MalcolmTucker
A better comparison is Cambie St where they cut and covered, but yeah. They certainly wouldn't have the land to do it in the style of cut and cover adjacent to 17 Ave SW. Traffic would be much worse, compressed to at least three lanes, and in tighter spots 2 for most of the route, with one side of the street not having street access for at least 18 months, more likely 2 years minimum.
It would be messy, that is for sure. For those that would suggest boring, you still need huge station boxes dug out, so if you are adding a bunch of choke points, may as well choke the whole route. Plus boring would be more expensive unless some unknown geology really helped out.
Goal has to be to reduce the underground length as much as possible to reduce cost and perhaps disruption. Might be able to squeeze in an elevated guideway in a 'centre lane' by removing street parking, removing grass between the sidewalk and street, and taking parts of people's front yards as necessary north of 16th Ave at some point. Depending on height, a central guideway should have way less shadowing on private property than many property owners would reflexively expect due to the orientation of the line.
Everything is trade offs of course, but it is important to remember every project will cause opposition if it creates change in a community.
As for the transportation planning managers quote, at least they are being honest with the community, and if the entire city decides this is the way to go, then we will have made the decision with eyes open. I wouldn't expect anything less from breaucrats that are being forced to do these consultations by their political operatives. In the long run, it might make sense to replace that person with a more transit evangelist persona, who is both realistic and can see the vision of the future, not a person who is tied to the great wonders of 'old Calgary Transit' effective capital utilization model that ignores real world external costs and lost benefits from planning decisions made with only the capital budget in mind.
|
With a hypothetical Centre Street subway as an extension of the SELRT in mind I have a few thoughts. I would imagine that the segments from Eau Claire to just past 16 Ave would need to be bored either way. The river crossing and subsequent climb up the bluffs would necessitate it. It would also be the section that has the most potential to disrupt traffic greatly. Closing down the intersection of Centre Street and 16 Ave, for the station pit, would put a particularly bad strain on the road network. Likewise, if a station was placed at 8 Ave it would also cause problems, just not as severe. To mitigate this we could temporarily create some pseudo traffic circles by making certain streets one way. It would mean ripping up the new median on 16 Ave to let 1 St NW and 1 St NE travel through. Basically 1 St NW would become a southbound one way between 17 Ave and 7 Ave; 1 St NE would become a northbound one way between 7 Ave and 17 Ave; 7 Ave would become a one way eastbound between 1 St NW and 1 St NE; 13 Ave would become a one way eastbound between 1 St NW and 1 St NE; 17 Ave would become a one way westbound between 1 St NE and 1 St NW. Westbound 16 Ave traffic would be directed to take 1st St NE north, 17 Ave N west, and 1 St NW south; Eastbound 16 Ave traffic would take 1 St NW south, 13 Ave N east, and 1 St NE north; Centre Street through traffic would just utilize 1 St NW and 1 St NE as a couplet while local traffic would still have most of Centre Street and all of the minor roads remaining as is.
North of 16 Ave (or 17 Ave, at a minimum, if it needs to stay open as per the plan outlined above) I see far fewer issues with cut and cover. The rest of the road network should be able to handle having Centre Street reduced to one lane each direction for the length of construction. We would probably have to phase it so that only half or a third of the existing intersections are dug up at any one time, to allow traffic to still cross Centre in a decent manner, but that should not be a huge problem. Construction for the Bow was able to dig up 6 Ave, go much deeper in an area far more prone to water issues, and bridge over it in a very timely manner.
We would have to see what kind of issues exist regarding utilities work but I don't think we would necessarily have to limit the underground section to mitigate costs. Seven kilometers of cut and cover, from just north of 16 Ave to Beddington Trail, will not break the bank. Station costs would be a bigger issue, especially since I favour 800 meter spacing to provide for both adequate coverage to the entire corridor and effective perpendicular bus coverage to all of North Central Calgary. I think my plan for the NLRT would cost somewhere in the neighbourhood of 2.5 billion. It involves a continuation of the SELRT with stations at 8 Ave, 16 Ave, 24 Ave, 32 Ave, 40 Ave/32 Ave Connector, McKnight Boulevard, Northmount Drive, 64 Ave, 72 Ave/4 St, Beddington Boulevard, 96 Ave, Country Hills Village, and Stoney Trail Park and Ride. 500 million for the ~2 km bored tunnel from Eau Claire to 20 Ave and the stations at 8 Ave and 16 Ave; 1.5 Billion for the ~7 km cut and cover tunnel from 20 Ave to Beddington Trail (then use the existing bus underpass which would be rendered superfluous) and eight corresponding stations; 250 million for the ~5 km surface route along Harvest Hills Boulevard and two corresponding stations; and 250 million for a 10% contingency. That should be quite affordable. Much more so if various stations are eliminated, or at least delayed until developers desire them enough to be convinced to contribute, as others have expressed a desire for fewer of them. I suppose there would be additional costs for LRV purchases and the expansion of the SELRTs maintenance and storage facility but hopefully the contingency would go a long way towards paying for those. Even if the contingency was needed for construction, the entire project should still come in under 3 billion; 250 million would purchase 60+ LRVs, enough for 12 five car trains, providing excellent service frequency; 250 million to expand the SE maintenance and storage facility.