HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Atlantic Provinces > Halifax > Halifax Peninsula & Downtown Dartmouth


    Skye Halifax I in the SkyscraperPage Database

• Building Data Page   • Comparison Diagram   • Halifax Skyscraper Diagram

• Map Location

Reply

 
Thread Tools Display Modes
     
     
  #221  
Old Posted May 11, 2011, 11:04 PM
-Harlington-'s Avatar
-Harlington- -Harlington- is offline
Registered User
 
Join Date: Jun 2009
Location: Halifax-Nova Scotia
Posts: 1,097
Quote:
Originally Posted by halifaxboyns View Post
The HbD map says post bonus height is 66m. I'm not sure how many stories that is?
Well the trillium is 65m and its 19 stories so probably pretty close to that
so im not sure what the news was talking about
Reply With Quote
     
     
  #222  
Old Posted May 12, 2011, 12:15 AM
Empire's Avatar
Empire Empire is offline
Salty Town
 
Join Date: Sep 2003
Location: Halifax
Posts: 2,206
Quote:
Originally Posted by -Harlington- View Post
Well the trillium is 65m and its 19 stories so probably pretty close to that
so im not sure what the news was talking about
Developers should be required to post a bond with the development application in the CBD. 3% sounds good. So for a proposed 100 million dollar development 3 million would be lost if the DA expires. We need to get tough in the CBD. It may stop some proposals but most aren't worth the paper they are written on.
__________________
Salty Town
Reply With Quote
     
     
  #223  
Old Posted May 12, 2011, 12:24 AM
sdm sdm is offline
Registered User
 
Join Date: Oct 2006
Posts: 1,895
Quote:
Originally Posted by halifaxboyns View Post
AH yes; now I remember. Thanks!!
It seems to me that some developers pride themselves on biting off more than they can chew. These guys and the developer for Waterside Centre have been great examples of that.

They give people like Starfish Properties and Medjuck a bad name.
Waterside centre is still waiting for papers related to the easement from the city, which has been very clearly stated in the media. I am not sure i can agree with you that Waterside centre developer is the same. Besides, Waterside Centre began construction but halted it because the paper work was not in place and the city wanted changes to the easement of which the developer didn't suspect was going to be as big of an issue. You should add to your list Halkirk development as well as it was approved before even waterside centre, yet nothing has started.

That said, yes developments need to take place quicker, but real estate developments are market driven.

Last edited by sdm; May 12, 2011 at 12:37 AM.
Reply With Quote
     
     
  #224  
Old Posted May 12, 2011, 12:33 AM
someone123's Avatar
someone123 someone123 is online now
hähnchenbrüstfiletstüc
 
Join Date: Nov 2001
Location: Vancouver
Posts: 35,990
Part of the problem is that developers are encouraged to sit on empty land because it is taxed at a lower rate than a small building. There is demand to fill all empty downtown lots with small residential buildings but we don't see those because land is priced for future giant office towers. If empty land were taxed more the price structure and incentives would change; we would see faster and more modest development.

Imagine how much better off the downtown would be if all vacant lots were 10 story apartment buildings. In the event that more land were required for office the apartments could be converted or torn down.
Reply With Quote
     
     
  #225  
Old Posted May 12, 2011, 12:37 AM
Waye Mason's Avatar
Waye Mason Waye Mason is offline
opinionated so and so
 
Join Date: Apr 2009
Location: Halifax, NS
Posts: 721
Well, they have to do something to reach the bonus height, right? Is the un-bonused height 9 stories, bonus 17? Sounds right to me.

It is not ALL city hall's fault.

Plenty of approved stuff is not being built, not because of government failure, but because the economics are not there. There is over 1 million square feet of development approved for downtown commercial, according to the city, and none of it is being built.
Reply With Quote
     
     
  #226  
Old Posted May 12, 2011, 1:04 AM
someone123's Avatar
someone123 someone123 is online now
hähnchenbrüstfiletstüc
 
Join Date: Nov 2001
Location: Vancouver
Posts: 35,990
Quote:
Originally Posted by Waye Mason View Post
Plenty of approved stuff is not being built, not because of government failure, but because the economics are not there.
Part of it is beyond the government's control but a large part of the "economics" depend on the government.

A rational developer spending his own money or trying to get bank money pretty much needs to answer this question:

cost <= revenue - desired profit ? (if yes, building. if no, parking lot)

The government adds significantly to the "cost" side by imposing development fees and requiring the developer to go through a lengthy appeal process. Property taxes claw back revenues that would be obtained from the development.

On top of this, the government makes the question harder to answer by adding substantial delays. For example, the Salter block development failed due to "economics" in the sense that it was not clearly profitable to build. Back when it was proposed, the hotel market was good and it was easy to get financing. Today, the hotel market is softer and it is much harder to get financing. Bureaucratic delays made it impossible to build at the right time and are at least part of the root cause of the problem.

Last edited by someone123; May 12, 2011 at 4:10 AM.
Reply With Quote
     
     
  #227  
Old Posted May 12, 2011, 3:40 AM
Empire's Avatar
Empire Empire is offline
Salty Town
 
Join Date: Sep 2003
Location: Halifax
Posts: 2,206
Quote:
Originally Posted by someone123 View Post
Part of it is beyond the government's control but a large part of the "economics" depend on the government.

A rational developer spending his own money or trying to get bank money pretty much needs to answer this question:

cost + desired profit >= revenue ? (if yes, building. if no, parking lot)

The government adds significantly to the "cost" side by imposing development fees and requiring the developer to go through a lengthy appeal process. Property taxes claw back revenues that would be obtained from the development.

On top of this, the government makes the question harder to answer by adding substantial delays. For example, the Salter block development failed due to "economics" in the sense that it was not clearly profitable to build. Back when it was proposed, the hotel market was good and it was easy to get financing. Today, the hotel market is softer and it is much harder to get financing. Bureaucratic delays made it impossible to build at the right time and are at least part of the root cause of the problem.
Something needs to be done to move development on lots like the Texpark. There should be a vacant lot tax in the CBD. The assessment for a vacant lot should be based on the allowable development for that site, perhaps 75% of that amount. It is bad enough to have hack parking lots like the Texpark holding up development but now we have parking lots not even being used for parking like the Salter lot.
__________________
Salty Town
Reply With Quote
     
     
  #228  
Old Posted May 12, 2011, 12:41 PM
Northend Guy Northend Guy is offline
Registered User
 
Join Date: Jun 2010
Location: Halifax
Posts: 254
Quote:
Originally Posted by Empire View Post
Something needs to be done to move development on lots like the Texpark. There should be a vacant lot tax in the CBD. The assessment for a vacant lot should be based on the allowable development for that site, perhaps 75% of that amount. It is bad enough to have hack parking lots like the Texpark holding up development but now we have parking lots not even being used for parking like the Salter lot.
I think you are on the right track here - then if something can't be built in a timely fashion, subsidize the property taxes if the developer converts to temporary greenspace in the interim - at least that would make the empty pockets in DT a little less offensive. (pretty sure someone had this idea on the forum last year - thought for sure it would have been implemented by now...)
Reply With Quote
     
     
  #229  
Old Posted May 12, 2011, 10:55 PM
Waye Mason's Avatar
Waye Mason Waye Mason is offline
opinionated so and so
 
Join Date: Apr 2009
Location: Halifax, NS
Posts: 721
Quote:
Originally Posted by someone123 View Post
Part of it is beyond the government's control but a large part of the "economics" depend on the government.

A rational developer spending his own money or trying to get bank money pretty much needs to answer this question:

cost <= revenue - desired profit ? (if yes, building. if no, parking lot)

The government adds significantly to the "cost" side by imposing development fees and requiring the developer to go through a lengthy appeal process. Property taxes claw back revenues that would be obtained from the development.

On top of this, the government makes the question harder to answer by adding substantial delays. For example, the Salter block development failed due to "economics" in the sense that it was not clearly profitable to build. Back when it was proposed, the hotel market was good and it was easy to get financing. Today, the hotel market is softer and it is much harder to get financing. Bureaucratic delays made it impossible to build at the right time and are at least part of the root cause of the problem.
Well to the second point, HRMbD shortens the application process to 60 days if they stay inside the requirements, right? So that has been addressed, unless you want to go outside of that.

To the first point on taxes, every city has commercial property tax, and some cities are building a lot and some are not building at all.
Reply With Quote
     
     
  #230  
Old Posted May 13, 2011, 1:55 AM
someone123's Avatar
someone123 someone123 is online now
hähnchenbrüstfiletstüc
 
Join Date: Nov 2001
Location: Vancouver
Posts: 35,990
Quote:
Originally Posted by Waye Mason View Post
To the first point on taxes, every city has commercial property tax, and some cities are building a lot and some are not building at all.
What a vague statement.

If you go here you can download property tax statistics for Canadian cities: http://www.realpac.ca/property-tax/

I am looking at the PDF right now. Finally Halifax can be #1 at something...

2010 ESTIMATED PROPERTY TAXES PER $1,000 OF COMMERCIAL ASSESSMENT

Calgary $13.79
Edmonton $15.56
Vancouver $18.64
Average $27.92
Winnipeg $28.54
Ottawa $34.98
Toronto $35.98
Montreal $37.65
Halifax $38.25

I believe HRM also has variable tax rates for different areas. If that is the case then the effective rate for the downtown is higher than what is listed. Higher assessments also result in disproportionately high tax rates.
Reply With Quote
     
     
  #231  
Old Posted May 13, 2011, 2:00 AM
worldlyhaligonian worldlyhaligonian is offline
Registered User
 
Join Date: Jun 2006
Posts: 4,049
Quote:
Originally Posted by someone123 View Post
What a vague statement.

If you go here you can download property tax statistics for Canadian cities: http://www.realpac.ca/property-tax/

I am looking at the PDF right now. Finally Halifax can be #1 at something...

2010 ESTIMATED PROPERTY TAXES PER $1,000 OF COMMERCIAL ASSESSMENT

Calgary $13.79
Edmonton $15.56
Vancouver $18.64
Average $27.92
Winnipeg $28.54
Ottawa $34.98
Toronto $35.98
Montreal $37.65
Halifax $38.25
Wow, that's wild. Its clear that Halifax needs to start building, our municipal government could have a better budget with taxes like that.

More that Montreal, wow.
Reply With Quote
     
     
  #232  
Old Posted May 13, 2011, 2:18 AM
Haliwood Haliwood is offline
Registered User
 
Join Date: May 2011
Posts: 30
I was recently able to talk to Mr.Saberi and he's quite ecstatic about the project. They're working on the design with the new elevated height now. They only made the proposal for the initial height because they knew once that gets approved, they can increase the height limit without much problems.

It may take a while, but it's going to be worth it. Trust me. Siamak Hariri is not your average architect from Halifax.
Reply With Quote
     
     
  #233  
Old Posted May 13, 2011, 2:33 AM
someone123's Avatar
someone123 someone123 is online now
hähnchenbrüstfiletstüc
 
Join Date: Nov 2001
Location: Vancouver
Posts: 35,990
Quote:
Originally Posted by Haliwood View Post
It may take a while, but it's going to be worth it. Trust me. Siamak Hariri is not your average architect from Halifax.
I hope you are right. That architect has done some interesting work but as of yet all we have is a parking lot.

I don't personally believe it matters much if the buildings are 81 m or 66 m or even 10 storeys at this point.

If it does work out it will be complemented nicely by the Discovery Centre redevelopment. There is also an opportunity for something great on the block below Hollis that fronts Sackville, next to the Bank of Canada building.
Reply With Quote
     
     
  #234  
Old Posted May 13, 2011, 2:48 AM
Empire's Avatar
Empire Empire is offline
Salty Town
 
Join Date: Sep 2003
Location: Halifax
Posts: 2,206
Quote:
Originally Posted by Haliwood View Post
I was recently able to talk to Mr.Saberi and he's quite ecstatic about the project. They're working on the design with the new elevated height now. They only made the proposal for the initial height because they knew once that gets approved, they can increase the height limit without much problems.

It may take a while, but it's going to be worth it. Trust me. Siamak Hariri is not your average architect from Halifax.
Do you mean the Texpark proposal and what elevated height are you referring to?
__________________
Salty Town
Reply With Quote
     
     
  #235  
Old Posted May 13, 2011, 2:55 AM
Haliwood Haliwood is offline
Registered User
 
Join Date: May 2011
Posts: 30
Quote:
Originally Posted by Empire View Post
Do you mean the Texpark proposal and what elevated height are you referring to?
I mean the 'Twisted Sisters' development. Is that in texpark? Sorry, I'm not sure.

Mr.Saberi said that since the approval, they've increased the height in the building plans. That's why we haven't seen any progress there yet.

Inevitably, the twin buildings will be the tallest buildings east of Montreal - even taller than the condo that was approved for Kings Wharf.
Reply With Quote
     
     
  #236  
Old Posted May 13, 2011, 3:42 AM
Empire's Avatar
Empire Empire is offline
Salty Town
 
Join Date: Sep 2003
Location: Halifax
Posts: 2,206
Quote:
Originally Posted by Haliwood View Post
I mean the 'Twisted Sisters' development. Is that in texpark? Sorry, I'm not sure.

Mr.Saberi said that since the approval, they've increased the height in the building plans. That's why we haven't seen any progress there yet.

Inevitably, the twin buildings will be the tallest buildings east of Montreal - even taller than the condo that was approved for Kings Wharf.
The development agreement for the twisted sisters has expired so why are they reworking the design and how much higher than 27 floors are they talking about?
__________________
Salty Town

Last edited by Empire; May 13, 2011 at 3:53 AM.
Reply With Quote
     
     
  #237  
Old Posted May 13, 2011, 4:10 AM
fenwick16 fenwick16 is offline
Honored Member
 
Join Date: Feb 2007
Location: Toronto area (ex-Nova Scotian)
Posts: 5,558
Quote:
Originally Posted by someone123 View Post
What a vague statement.

If you go here you can download property tax statistics for Canadian cities: http://www.realpac.ca/property-tax/

I am looking at the PDF right now. Finally Halifax can be #1 at something...

2010 ESTIMATED PROPERTY TAXES PER $1,000 OF COMMERCIAL ASSESSMENT

Calgary $13.79
Edmonton $15.56
Vancouver $18.64
Average $27.92
Winnipeg $28.54
Ottawa $34.98
Toronto $35.98
Montreal $37.65
Halifax $38.25

I believe HRM also has variable tax rates for different areas. If that is the case then the effective rate for the downtown is higher than what is listed. Higher assessments also result in disproportionately high tax rates.
No wonder there is so little development downtown. For a small $500,000 old building downtown the tax rate would be $19,125 per year. For comparison, just imagine if an average home owner in a city such as Mississauga had to pay $19,125 per year in taxes. That commercial tax rate indicates that Halifax is grossly over-taxed.

Last edited by fenwick16; May 13, 2011 at 4:32 AM. Reason: typo!!!
Reply With Quote
     
     
  #238  
Old Posted May 13, 2011, 4:30 AM
fenwick16 fenwick16 is offline
Honored Member
 
Join Date: Feb 2007
Location: Toronto area (ex-Nova Scotian)
Posts: 5,558
There was a story in the allnovascotia.com (March 30th, 2011) that indicated that Saberi was considering three options - two 27 storey towers as proposed, or a 27 storey tower, or a downsized 20 storey tower.

Since residential/hotel storeys are around 10 feet (3.05 meters) per storey, 27 storeys would be about 82.3 meters high. The 1801 Hollis Street Tower is about 87 meters - (reference - Emporis). Although 1801 Hollis is only 22 storeys, commercial stories are higher per storey than residential storeys. Fenwick Tower is 98 meters, but I think that would be above Citadel Hill ramparts maximum at the United Gulf Texpark location. So I don't think that this could possibly become the tallest east of Montreal.
Reply With Quote
     
     
  #239  
Old Posted May 15, 2011, 1:46 PM
Haliwood Haliwood is offline
Registered User
 
Join Date: May 2011
Posts: 30
Quote:
Originally Posted by Empire View Post
The development agreement for the twisted sisters has expired so why are they reworking the design and how much higher than 27 floors are they talking about?
I can't disclose too much. Just know that the new proposal (which we'll see in about 3 months), is something absolutely unheard of in Halifax.. And would totally eclipse any structure in the city.
Reply With Quote
     
     
  #240  
Old Posted May 15, 2011, 2:40 PM
fenwick16 fenwick16 is offline
Honored Member
 
Join Date: Feb 2007
Location: Toronto area (ex-Nova Scotian)
Posts: 5,558
Quote:
Originally Posted by Haliwood View Post
I can't disclose too much. Just know that the new proposal (which we'll see in about 3 months), is something absolutely unheard of in Halifax.. And would totally eclipse any structure in the city.
It will be interesting to see. Personally, I hope that they won't go above 27 storeys since it would likely mean that the development agreement would have to be re-approved. It wouldn't bother me to see something taller, but I don't want to see years of discussions and appeals. If Saberi comes out with a design over the Citadel ramparts maximum then it is likely not a serious proposal since it would never be approved even under the previous height limitations (ramparts maximum).

I would much rather see 20 - 27 storeys of an interesting design.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Atlantic Provinces > Halifax > Halifax Peninsula & Downtown Dartmouth
Forum Jump



Forum Jump


All times are GMT. The time now is 9:32 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.