The first part of a 3 part study is underway and the municipality now has a website - municipal website. The first part of the study is to establish a business plan, the second part would be to decide on a stadium design and the third part would be the construction.
I think many of us are waiting until June when the first stadium study is supposed to be complete.
I agree about the Metro Centre - it is a good facility and there is even some room for expansion.
|
HMC is old, but... the main complaints are concessions and loading.
The HMC is old enough that the ramps onto the floor are designed for 48 foot trailers, and the standard is now 53 foot. You can't get a 53 footer in one side, and barely (literally an inch or less clearance) on the other. But that can be fixed.
If you look at the design, the building is basically four concrete box pillars at each corner holding up the roof. Not impossible to rework everything inside of that envelope.
I think it would be possible and desirable to do a major mid-life refit, but something in the 20-30 million range at the existing space, rather than $150 million for a new almost NHL size facility.