There are a number of ways to provide input on the UBC Line during this crucial second round of public consultation. However they are time sensitive.
Monday, April 4th
-Online "webinar", an hour-long presentation and then Q&A session. Sign up here:
http://uri.mediaco.ca/u/translink_020211
Tuesday, April 5th
-Community Workshop. Kitsilano Secondary School, Large Gymnasium, 2550 W.10th Ave, Vancouver. 6pm-9pm
Wednesday, April 6th
-Community Workshop. Tenth Avenue Alliance Church, 11 W.10th Ave, Vancouver. 6pm-9pm.
Online Questionnaire
-
http://www.translink.ca/en/Be-Part-of-th...it-Study/Get-Involved/Questionnaire.aspx
The revised Phase 2 Public Consultation options for the UBC Line:
Bus Rapid Transit (BRT) | Centre of street, dedicated lanes with barrier, in-street stations, some signal priority.
Source
Light Rail Transit (LRT) #1 | Centre of Street, dedicated corridor with barrier, in-street stations, some signal priority.
Source
Light Rail Transit (LRT) #2 | Centre of Street, dedicated corridor with barrier, in-street stations, some signal priority.
Source
Rail Rapid Transit (RRT/SkyTrain branding) | Bored tunnel, full grade separation
Source
Combo 1 - RRT and LRT | Millennium SkyTrain Line extended from VCC-Clark to Arbutus in a bored tunnel, LRT from Main Street Science World to UBC in centre of street, dedicated corridor with barrier, in-street stations, some signal priority
Source
Combo 2 - RRT and BRT | Millennium SkyTrain extended from VCC-Clark to Arbutus in a bored tunnel, BRT from Commercial Drive to UBC, centre of street, dedicated lanes with barrier, in-street stations, some signal priority.
Source
Best Bus | Significantly enhanced level of local bus service and enhanced 99 B-Line (BRT-light)
Source
Street integration of LRT and BRT.
Standard four-lane section of Broadway or 10th Avenue.
Source
Standard six-lane section of Central Broadway (Commercial Drive to Arbutus)
Source
Intersection integration of LRT or BRT.
No turn restrictions at major intersections. LRT and BRT would stop and wait for the lights to change and the intersection to clear before proceeding.
Source
Left turn restrictions would be in place for moderately busy intersections. LRT and BRT would stop and wait for the lights to change and the intersection to clear before proceeding.
Source
"Right in and right out" intersections would be closed to through traffic perpendicular to Broadway/10th Avenue. LRT or BRT would continue through intersection without stopping.
Source
Representative street cross sections for each section of the corridor for LRT and BRT.
University Boulevard in UBC (everything west from Blanca)
Source
Blanca to Alma ("Point Grey Village")
Source
Alma to Arbutus
Source
Arbutus to Commercial Drive (Central Broadway, city's second downtown)
Source
False Creek segment for LRT Option 1 and Combo Option 1 (Main Street-Science World station to Arbutus and Broadway)
Source
Great Northern Way segment from sub-options in LRT option 1 and LRT option 2.
Source
UBC Line Rapid Transit Study homepage:
http://www.translink.ca/en/Be-Part-of-th...d-Transit-Study/Alternative-Designs.aspx