Quote:
Originally Posted by VANRIDERFAN
Actually I would rather they build a new railroad from the mine site to the CN Main line at Stony Beach. It is less than 15 miles (as the crow flies), and does not go through any urban area. If they reactivate the line from Lumsden to Regina then they would have to refurbish that section, improve the crossing to at least 25 streets (5 of them major roadways) and then manouver the train in a very confined switching yard. All of which would cost as much or more than a new rail road. Also I would assume that CN's long term plan would be to move the switching yard to the west of the city. Or they could just send the potash north.
|
Are there no trains at all on the Regina section of that line now? Presently LMR would only have at most a few trains a month and they may all go north.
Potash One's line is proposed on their presentation to go straight north from the processing plant to Findlater. They state:
Line routing completed (with two additional
options)
Land purchase for critical section completed
Detailed engineering will confirm route
Rail spur will be privately owned by
Potash One and will interconnect to
CN Rail (via LMR Shortline)
Potential CP Rail connection