  #841  
Old Posted Mar 25, 2011, 4:26 PM
Stormer's Avatar
Stormer Stormer is offline
Registered User
 
Join Date: Jan 2008
Posts: 8,078
This summer the $1.9 billion Co-op Refinery expansion will be toppled from its crown as the Regina area's largest construction project. K+S (Potash One) one of the world's largest salt and potash companies, will begin construction on its $2.5 billion greenfield solution mine 60km NW of Regina. The site is straight west of Disley on Highway 11 and just east of Buffalo Pound Lake. It includes large processing facilities, storage and handling buildings, a water pipeline and even a rail line. The feasibility study is done and they are ready to start. Many, many more construction jobs for this area...

http://www.potash1.ca/s/Home.asp

maps and info here:
http://www.potash1.ca/i/pdf/CorporatePresentation.pdf
     
     
  #842  
Old Posted Mar 25, 2011, 4:32 PM
cutterp's Avatar
cutterp cutterp is offline
#1 King Champ
 
Join Date: Oct 2007
Location: Regina
Posts: 261
Potash 1

Oh boy....

I wonder if this means they will reopen the rail line through lumsden to move their product around.

I don't think too many people would like that. Although I think the line might be owned by a group of farmers and would require some maintenance as it hasn't been used for a very long time. Especially to support the weight of loaded potash cars.

It's a little scary how much water they are going to use from our drinking water supply. I guess I'm a little bit of a tree huger at heart.


***EDIT*** No Lumsden rail line needed.
     
     
  #843  
Old Posted Mar 25, 2011, 4:44 PM
jigglysquishy's Avatar
jigglysquishy jigglysquishy is offline
Registered User
 
Join Date: Jul 2010
Location: Saskatchewan
Posts: 3,326
Where is K+S locating all their office jobs? With a plant of that size I'd imagine there are at least a few hundred office jobs floating around.

Hopefully they can be lured to Regina's downtown and build another tower.
     
     
  #844  
Old Posted Mar 25, 2011, 4:47 PM
Stormer's Avatar
Stormer Stormer is offline
Registered User
 
Join Date: Jan 2008
Posts: 8,078
Quote:
Originally Posted by cutterp View Post
Oh boy....

I wonder if this means they will reopen the rail line through lumsden to move their product around.

I don't think too many people would like that. Although I think the line might be owned by a group of farmers and would require some maintenance as it hasn't been used for a very long time. Especially to support the weight of loaded potash cars.

It's a little scary how much water they are going to use from our drinking water supply. I guess I'm a little bit of a tree huger at heart.


***EDIT*** No Lumsden rail line needed.
Actually they will be linking to the Last Mountain Railway (shortline) which now operates the former CN line through Lumsden. Currently yhey would have a very few, small trains , but expect that line to be busy with Potash cars in the future.

http://www.railm.ca/lmr

Regarding water, they have contracted with SaskWater who will ensure sufficient additional water is dumped from Lake Deifenbaker into Buffalo Pound to make up for what K+S uses.
     
     
  #845  
Old Posted Mar 25, 2011, 5:44 PM
Stormer's Avatar
Stormer Stormer is offline
Registered User
 
Join Date: Jan 2008
Posts: 8,078
Quote:
Originally Posted by djforsberg View Post
According to the document Stormer linked to, they have an office in Saskatoon, where it will most likely remain. Regina, Moose Jaw and area will have to provide most of the workforce for the mine, which is very good news.
DJ is correct:

K+S Aktiengesellschaft is pleased to announce that Richard L. Wilson, formerly Vice President, Manufacturing for Morton Salt, has been appointed as Chief Executive Officer of Potash One Inc. ("Potash One") effective March 1, 2011. Mr. Wilson is replacing Alexa Hergenröther, Head of Corporate Development at K+S Aktiengesellschaft, who was the Chief Executive Officer for an interim period.

Richard L. Wilson is a forty year veteran of Morton Salt and has broad experience in solution mining and processing. In his new role, Mr. Wilson will lead the management team based in Saskatoon, Canada, that is focused on the implementation of the Legacy Project, a planned K+S potash solution mining facility in Saskatchewan. "I am looking forward to the new assignment, and to the challenge of heading up a project of such strategic importance for the K+S Group," says Mr. Wilson.

The position of Chief Financial Officer of Potash One will continue to be held by Luis E. Mendoza, who was previously the Vice President of K+S North America.

Mike Ferguson, formerly Vice President, Projects at Potash One, will continue to act as Senior Vice President and Project Manager of Potash One. Erika Ritchie will continue to retain her position as Vice President Environmental & Regulatory Affairs of Potash One. Dr. Franz Xaver Spachtholz, formerly Head of General Mining Division at K+S Aktiengesellschaft, has been appointed as Vice President Engineering of Potash One.

     
     
  #846  
Old Posted Mar 25, 2011, 11:16 PM
North_Regina_Boy North_Regina_Boy is offline
Registered User
 
Join Date: Mar 2010
Location: Regina, SK (formerly Saskatoon)
Posts: 1,474
I am really happy that this rail line will be back in use again, and to see the tracks in North Regina being used again. Although a lot of rail infrastructure will need to be improved and I would assume this would be southwards along the line as that would be the cheapest way. Although people if that is the case seeing as Regina's only CN main line out of the city goes over ring road that will make that area MUCH more rail traffic intensive with 150 car potash trains on both CN and CP.

Unless they are planning on going north thru Saskatoon with the potash? Time will tell, I personally hope it is through Regina.
     
     
  #847  
Old Posted Mar 28, 2011, 12:57 AM
CCF's Avatar
CCF CCF is offline
Canadian Urbanite
 
Join Date: Jul 2006
Location: Across Canada
Posts: 3,533
When is the office at Albert and 11th going to begin construction? Hopefully this spring we see a few projects kick start.
     
     
  #848  
Old Posted Mar 28, 2011, 2:21 AM
saskdave saskdave is offline
Registered User
 
Join Date: Jul 2008
Posts: 82
News from Home & Garden Show

Miscellaneous news from Home & Garden Show:

-Gardens on Rose - 39/64 units sold - plan to start digging in a month depending on weather

-Centre Square Place - said they have just started selling but the top 2 or 3 penthouses (can't remember how many) are all sold (approx $800,000 each)

-Harbour Landing - three different condo/townhouse developments there and all of them are at least half sold out already

-Every builder you talked to said they are busy....

Dave
     
     
  #849  
Old Posted Mar 28, 2011, 4:50 AM
Planner2008 Planner2008 is offline
Registered User
 
Join Date: Mar 2008
Posts: 184
Quote:
Originally Posted by djforsberg View Post
I also noticed a "Proposed Mark's Work Warehouse" beside the "Zellers". I drove by Southland Mall last night and I noticed all the Zellers signs have been taken down so it has clearly been delayed or even scrapped. I still think they should move Canadian Tire there. They would do great in the mall. It doesn't look like there is room in Grasslands for them.
That's to make way for the "TARGET" coming soon signage!
     
     
  #850  
Old Posted Mar 28, 2011, 3:21 PM
StealthGirl's Avatar
StealthGirl StealthGirl is offline
Registered User
 
Join Date: Jun 2008
Posts: 1,280
Wasn't there a rumour that Tim Hortons was going to build in Southland Mall's parking lot? Could that be one of the three?
     
     
  #851  
Old Posted Mar 28, 2011, 5:37 PM
prairieguy prairieguy is offline
Registered User
 
Join Date: Apr 2007
Posts: 1,577
Quote:
Originally Posted by saskdave View Post
Miscellaneous news from Home & Garden Show:

-Gardens on Rose - 39/64 units sold - plan to start digging in a month depending on weather

-Centre Square Place - said they have just started selling but the top 2 or 3 penthouses (can't remember how many) are all sold (approx $800,000 each)

-Harbour Landing - three different condo/townhouse developments there and all of them are at least half sold out already

-Every builder you talked to said they are busy....

Dave
Congratulations Regina! Your city is certainly showing a lot of strength and optimism in all of the major construction projects underway. As someone from Saskatoon, I think this is great for all of Saskatchewan.
I have to say, I am a bit "jealous" of what seems to be some deep pockets of private developers seeing the potential in Regina. Saskatoon still seems to be struggling a bit with this in terms of major projects (lots of small to mid size, but still waiting on a really big project...still holding breath on our River Landing Village )
     
     
  #852  
Old Posted Mar 29, 2011, 12:05 AM
Rodo Regina Lover Rodo Regina Lover is offline
Registered User
 
Join Date: Apr 2010
Posts: 220
I've been waiting decades for them to complete the lighting along the Ring Road from I think about the bridges over Wascana Creek south around to pretty much Lewvan Drive.I don't get the delay, when you drive from Medicine Hat to Redcliff they have all that section of the Trans-Canada highway lit up, and I think it looks pretty impressive. Just a thought!! Hopefully when the interchange at Lewvan Dr. is completed this fall, when they do the lighting of that project they will finish the rest of that southern section of the Ring Road!
     
     
  #853  
Old Posted Mar 29, 2011, 12:49 AM
sask1982's Avatar
sask1982 sask1982 is offline
Registered User
 
Join Date: Sep 2002
Location: Regina, Saskatchewan
Posts: 916
Quote:
Originally Posted by saskdave View Post
Miscellaneous news from Home & Garden Show:

-Gardens on Rose - 39/64 units sold - plan to start digging in a month depending on weather

Dave
Depending on weather? Maybe if it rains every day for the next 3 months but i think that at this point, it is a poor excuse. I could see maybe if the site was covered in 6 ft of snow, but i am pretty sure that isn't the case. Does anyone have a recent picture of the site? It's a parking lot currently, correct?
     
     
  #854  
Old Posted Mar 29, 2011, 12:56 AM
Rodo Regina Lover Rodo Regina Lover is offline
Registered User
 
Join Date: Apr 2010
Posts: 220
I talked to a spokesperson for the Centre Square Condo's at the Home Show on Sun. and he said the condos were selling very well and construction would start in June! I kinda sounded a little doubtful and said to him with the recent delays with the Plains Hotel demolition and the River Landing situation in Saskatoon, ya know "like your sure June is when you're starting construction" and he sounded very adamant that they will break ground in June!!So here's hoping it wasn't all just sales talk!
     
     
  #855  
Old Posted Mar 29, 2011, 1:07 AM
Rodo Regina Lover Rodo Regina Lover is offline
Registered User
 
Join Date: Apr 2010
Posts: 220
Bad idea?? All the roads in Wascana Centre have road way lighting,ALL the roads, so a major freeway is to remain in the dark, just because it runs through Wascana Centre?? That makes sense? Sorry but I don't get the logic in that at all. The future by-pass has no bearing on the currant Ring Road as there will always be heavy traffic on this freeway,by-pass or not.
     
     
  #856  
Old Posted Mar 29, 2011, 1:22 AM
Golks Golks is offline
Registered User
 
Join Date: Dec 2007
Location: Regina, SK
Posts: 119
Quote:
Originally Posted by Rodo Regina Lover View Post
I've been waiting decades for them to complete the lighting along the Ring Road from I think about the bridges over Wascana Creek south around to pretty much Lewvan Drive.I don't get the delay, when you drive from Medicine Hat to Redcliff they have all that section of the Trans-Canada highway lit up, and I think it looks pretty impressive. Just a thought!! Hopefully when the interchange at Lewvan Dr. is completed this fall, when they do the lighting of that project they will finish the rest of that southern section of the Ring Road!
The portion of the Ring Road south of Victoria Ave is maintained by the Provincial Government and could explain why there never was lighting installed.

But the city is taking over maintenance/ownership of that portion up to Lewvan and possibly as far as pinkie road in very near future.
     
     
  #857  
Old Posted Mar 29, 2011, 3:07 PM
VANRIDERFAN's Avatar
VANRIDERFAN VANRIDERFAN is offline
Registered User
 
Join Date: Jan 2007
Location: Regina
Posts: 5,487
Quote:
Originally Posted by North_Regina_Boy View Post
I am really happy that this rail line will be back in use again, and to see the tracks in North Regina being used again. Although a lot of rail infrastructure will need to be improved and I would assume this would be southwards along the line as that would be the cheapest way. Although people if that is the case seeing as Regina's only CN main line out of the city goes over ring road that will make that area MUCH more rail traffic intensive with 150 car potash trains on both CN and CP.

Unless they are planning on going north thru Saskatoon with the potash? Time will tell, I personally hope it is through Regina.

Actually I would rather they build a new railroad from the mine site to the CN Main line at Stony Beach. It is less than 15 miles (as the crow flies), and does not go through any urban area. If they reactivate the line from Lumsden to Regina then they would have to refurbish that section, improve the crossing to at least 25 streets (5 of them major roadways) and then manouver the train in a very confined switching yard. All of which would cost as much or more than a new rail road. Also I would assume that CN's long term plan would be to move the switching yard to the west of the city. Or they could just send the potash north.
     
     
  #858  
Old Posted Mar 29, 2011, 3:40 PM
Stormer's Avatar
Stormer Stormer is offline
Registered User
 
Join Date: Jan 2008
Posts: 8,078
Quote:
Originally Posted by VANRIDERFAN View Post
Actually I would rather they build a new railroad from the mine site to the CN Main line at Stony Beach. It is less than 15 miles (as the crow flies), and does not go through any urban area. If they reactivate the line from Lumsden to Regina then they would have to refurbish that section, improve the crossing to at least 25 streets (5 of them major roadways) and then manouver the train in a very confined switching yard. All of which would cost as much or more than a new rail road. Also I would assume that CN's long term plan would be to move the switching yard to the west of the city. Or they could just send the potash north.
Are there no trains at all on the Regina section of that line now? Presently LMR would only have at most a few trains a month and they may all go north.

Potash One's line is proposed on their presentation to go straight north from the processing plant to Findlater. They state:

Line routing completed (with two additional
options)
􀂋
Land purchase for critical section completed

􀂋
Detailed engineering will confirm route

􀂋
Rail spur will be privately owned by
Potash One and will interconnect to
CN Rail (via LMR Shortline)

􀂋 Potential CP Rail connection
     
     
  #859  
Old Posted Mar 29, 2011, 3:56 PM
VANRIDERFAN's Avatar
VANRIDERFAN VANRIDERFAN is offline
Registered User
 
Join Date: Jan 2007
Location: Regina
Posts: 5,487
Quote:
Originally Posted by Stormer View Post
Are there no trains at all on the Regina section of that line now? Presently LMR would only have at most a few trains a month and they may all go north.

Potash One's line is proposed on their presentation to go straight north from the processing plant to Findlater. They state:

Line routing completed (with two additional
options)
􀂋
Land purchase for critical section completed

􀂋
Detailed engineering will confirm route

􀂋
Rail spur will be privately owned by
Potash One and will interconnect to
CN Rail (via LMR Shortline)

􀂋 Potential CP Rail connection
I live in the NW. There has not been a train on that section for 3 years.
     
     
  #860  
Old Posted Mar 29, 2011, 4:00 PM
boborider boborider is offline
Registered User
 
Join Date: Feb 2011
Posts: 196
My understanding is that LMR now owns the track and rail bed and as a Short line ,they are governed by different regs as to their operation and standards. It is also my understanding that they are allowed a maximum number of cars on a train and I believe it is no more than 16. This being the case I don't believe they would be interested in running "runt trains" on the existing line into Regina. I agree that it would make infinitely more sense to construct their own line and connect north to Saskatoon. Regina is a mess with tracks running all over the place - a transportation planner's nightmare. The sooner they get rid of the in city tracks the better IMO.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan
Forum Jump



Forum Jump


All times are GMT. The time now is 10:11 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.