Quote:
Originally Posted by MalcolmTucker
That is way too close. Remember underground stations of the size if we are talking about low floor LRT cost north of $150 million each.
Anyone who says 800 m is ok has never had to actually commute on a line like the Bloor Line in Toronto which has way too many stations. Fully grade separated the speed is effectively 33 kph. It is so slow.
Except in urban cores, or in systems that are not designed to be rapid (like Toronto's planned Eglinton Line) do you see spacing as you say. Purposefully making transit slower while raising the cost a great deal isn't a good recipe for success.
|
A lot of stations on the Bloor Line are even closer than 800 meters. They are closer to six hundred, which I agree is too close. 800 meter station spacing would allow faster travel times than on Bloor. 800 is more like Yonge south of Eglinton, the Canada Line, and a multitude of other metro like systems. It is more than fast enough so long as headways are short and people can easily access nearby stations. The trip downtown from the northern terminus would still be much shorter than from Somerset-Bridlewood.
800 meter spacing is simply the ideal way to cover an area like North Central Calgary. The entire corridor would be able to easily reach stations while bus service along the intersecting roads would adequately service areas further away. It takes advantage of the grid that exists by allowing all transit to maintain relatively straight and simple to understand routes. Anything more than 800 meters would start pushing walking distances to stops beyond the 500 meter threshold or cause the busses to detour to be able to reach the stations.
Initially skipping 32 Ave, Northmount, and 72 Ave would, if deemed necessary, constrain costs until such a time that we would want to add them. The important thing would be maintain the option of eventually providing that ideal level of service. This would be akin to the 33 Avenue and 57 Avenue stations on the Canada Line. They were not built because the cost was decided to not be worth it at present. Leaving the rest of route the same though allows for a future ideal layout. If they had instead moved the 49 Ave station to 54 Ave and 41 Ave to 37 it would have permanently ensured a worse route. The stations would essentially be stuck at less than ideal locations and intersecting bus routes would be forced off of the logical main perpendicular roads.
I would be up for looking at a plan that calls for certain essential stations to be paid for as part of the Line and others to be built, at least in part, with funding from an extra property tax levy or developer contributions per resident approval.