Quote:
Originally Posted by The Chemist
How does interlining NOT reduce capacity if you could run trains every 2.5 minutes on each line without it but can only run trains every 5 minutes with it?
|
Let's look at it this way. When the 8th Ave subway is built, and only the NE-W line is running on 7th ave, the capacity of the NE line is 3 times what it currently is. going up to 4 car trains increases capacity by 33%. Using all the time slots used by S-NW trains currently increases capacity by 100%, but even more than that, because there are a few more 201 trains going through downtown than 202 trains. And that's assuming no improvements can be made with signallingm, etc, and means that no more trains go through downtown on 7th ave than what CURRENTLY do.
I see no reason why a 3 fold increase in capacity won't be enough for the NE-W line throughout my lifetime, at least.
Interlining immediately cuts capacity in half (since the NC would have similar ridership to the NE line), meaning that we don't get a 3x increase in capacity on the NE line, we only can get about a 50% increase in capacity from what is current. We know that without signalling improvements, its tough to practically fit more trains downtown. The NE line is quite full currently, has two more stations opening up next year, which will add a little to the ridership, plus there are four more future stations planned for, which will go through future residential areas that aren't small, then on to a dense new industrial/commercial centre, and considering that the MD has set aside space for the LRT, the NE line could eventually head up to Cross Iron Mills. I think a threefold increase in capacity can handle that. I KNOW that a 50% increase will not be nearly enough.
Obviously, a transfer at Zoo station would not be accessible either, there would never be room for extra riders to get on, and especially not in the numbers that would be riding the NC line.
So, if we would require a different downtown access for the NC line (we do, clearly), why not save the cost and build the NC line as an extension of the SE line, where the downtown infrastrcuture would already be in place? Sure, a subway up Centre Street would be expensive (I don't think anyone has said it wouldn't be), but the costs become much closer together for the different options when you save the $500 or so million that a new downtown connection would cost if the NC route is used.
Also, like I said before, the latest (2010) plan shows a streetcar also going down centre street. Doing a subway would eliminate the need for that, so we can use the cost of that system in the cost comparision as well. Like I said before, the $500M on a downtown connection, and $500 million on a centre street streetcar (rough guesses) would go quite a ways to building a centre street subway. Like others have said, the subway only has to go as far as 64th Ave, no further, before it can become an at-grade system. Keeping lots like the former The Brick lot at the corner of Centre and 16th clear to aid future subway construction, and provide a station head, could save hundreds of millions of dollars in the future as well.
I think the tunneling could easily be done cut and cover, saving cost, and I don't think it would be outrageously expensive. How much did the entire Canada line in Vancouver cost? A centre street subway here should be somewhat cheaper.