Quote:
Originally Posted by trainiac
I wonder if they considered the land directly across Northside Dr from the dome? It would be right by the Vine City MARTA station instead of a long, hilly walk from either nearby train station
|
I actually read the majority of the proposal. From what I understand, the site proposed is best suited to hold the stadium primarily because it is a contiguous 28 acres (with a minimum of 25 required for a modern day football stadium) and because there minimal (in relative terms) other site work or right-of-way obstacles to overcome.
They also mentioned the fact walk times from existing tailgate spots and MARTA stations will be longer. There's a 37 page analysis on traffic flow, commute times to and from the stadium and parking, and availability of new parking lots that could be used among other things.