  #1381  
Old Posted Jan 28, 2011, 5:25 PM
OneWorldTradeCenter's Avatar
OneWorldTradeCenter OneWorldTradeCenter is offline
Editor
 
Join Date: Aug 2009
Location: Renningen, Germany
Posts: 1,201
Why has Two WTC another kind of cranes (like BofA Tower, those red-white cranes) and the cranes they use at One and Four WTC as well as the memorial (the white cranes with yellow tip)?
__________________
One World Trade Center= the best skyscraper in the world and the tallest in the Western Hemisphere
All the way with LBJ
Reply With Quote
     
     
  #1382  
Old Posted Jan 28, 2011, 5:28 PM
meh_cd meh_cd is offline
Registered User
 
Join Date: Jul 2008
Posts: 571
Quote:
Originally Posted by OneWorldTradeCenter View Post
Why has Two WTC another kind of cranes (like BofA Tower, those red-white cranes) and the cranes they use at One and Four WTC as well as the memorial (the white cranes with yellow tip)?
Different contractor -> different cranes.
Reply With Quote
     
     
  #1383  
Old Posted Jan 28, 2011, 5:33 PM
OneWorldTradeCenter's Avatar
OneWorldTradeCenter OneWorldTradeCenter is offline
Editor
 
Join Date: Aug 2009
Location: Renningen, Germany
Posts: 1,201
Quote:
Originally Posted by meh_cd View Post
Different contractor -> different cranes.
Thanks, that is true. That means, that those cranes are the ones for Tower 3 as well, because Tishman is responsible for the other projects in mentioned in my previous post.
__________________
One World Trade Center= the best skyscraper in the world and the tallest in the Western Hemisphere
All the way with LBJ
Reply With Quote
     
     
  #1384  
Old Posted Jan 28, 2011, 5:40 PM
meh_cd meh_cd is offline
Registered User
 
Join Date: Jul 2008
Posts: 571
Quote:
Originally Posted by Zensteeldude View Post
Yep.

The relativly small section is because those columns are not going to support the tower part of the building.
Just the goofy trading floor podium, right?

Either way, I usually dislike Fox News but they have been on the ball with their WTC coverage. Or, I should say, at least they cover it!
Reply With Quote
     
     
  #1385  
Old Posted Jan 29, 2011, 2:20 PM
asharmaearth411 asharmaearth411 is offline
Registered User
 
Join Date: Dec 2010
Posts: 55
Exclamation

Quote:
"A small step, but Fidje pointed out buildings like this one require “millions” of steps and they all need to be done correctly. More importantly, with these columns in place every planned building for the new WTC is moving up. It was the last time steel will go in for the first time."
Correction: Tower 3 Steel erection has not begun if I am not mistaken. Any feedback?

Thanks




Quote:
Originally Posted by NYguy View Post
http://www.foxnews.com/us/2011/01/27/steel-new-world-trade-center/

First Steel of the New World Trade Center



By Martin Hinton
January 27, 2011





It begins...
Reply With Quote
     
     
  #1386  
Old Posted Jan 29, 2011, 4:17 PM
Zensteeldude Zensteeldude is offline
Honored Member
 
Join Date: Jul 2009
Location: Northern New Jersey
Posts: 692
Quote:
Originally Posted by OneWorldTradeCenter View Post
Why has Two WTC another kind of cranes (like BofA Tower, those red-white cranes) and the cranes they use at One and Four WTC as well as the memorial (the white cranes with yellow tip)?
There are two main reasons, one, Lomma/NY Crane was removed from the list of Port Authority approved sub-contractors and Lomma has Favco cranes. (If you look at pics from about 6 months ago the cranes on T1 still said New York Crane on the side, now they say DCM/Federated.)

Two, this building is being erected by Cornell, not DCM. Cornell favors FMC/ Linkbelt products.

Tishman is the Construction Manager, the steel contractor determines what cranes they are going to use.

Quote:
Originally Posted by meh_cd View Post
Just the goofy trading floor podium, right?

Either way, I usually dislike Fox News but they have been on the ball with their WTC coverage. Or, I should say, at least they cover it!
Right.

I watch Fox News so I can understand what Jon Stewart is talking about.

Last edited by Zensteeldude; Jan 29, 2011 at 4:34 PM.
Reply With Quote
     
     
  #1387  
Old Posted Jan 30, 2011, 1:35 AM
NYguy's Avatar
NYguy NYguy is offline
New Yorker for life
 
Join Date: Jul 2001
Location: Borough of Jersey
Posts: 57,194
Quote:
Originally Posted by asharmaearth411 View Post
Correction: Tower 3 Steel erection has not begun if I am not mistaken. Any feedback?
It has not, and hasn't obviously for tower 5.
__________________
NEW YORK is Back!

“Office buildings are our factories – whether for tech, creative or traditional industries we must continue to grow our modern factories to create new jobs,” said United States Senator Chuck Schumer.
Reply With Quote
     
     
  #1388  
Old Posted Jan 30, 2011, 4:34 AM
asharmaearth411 asharmaearth411 is offline
Registered User
 
Join Date: Dec 2010
Posts: 55
Thumbs down

Thanks

Is the East Bathtub surrounded by the existing slurry walls from the original WTC or has a new one been fitted in?
Also, is the foundation for Tower 2 being prepared assuming that it will be built to the top and not just street level?
Reply With Quote
     
     
  #1389  
Old Posted Jan 30, 2011, 6:18 AM
uaarkson's Avatar
uaarkson uaarkson is offline
Registered User
 
Join Date: Nov 2008
Location: Back in Flint
Posts: 2,103
Quote:
Originally Posted by asharmaearth411 View Post
Also, is the foundation for Tower 2 being prepared assuming that it will be built to the top and not just street level?
They're building tower 2. The only question is whether or not they'll stop at street level.

What you see here is the foundation for a 1,358' skyscraper.
Reply With Quote
     
     
  #1390  
Old Posted Jan 30, 2011, 5:18 PM
uakoops uakoops is offline
Registered User
 
Join Date: Jul 2009
Posts: 201
Quote:
Originally Posted by asharmaearth411 View Post
Thanks

Is the East Bathtub surrounded by the existing slurry walls from the original WTC or has a new one been fitted in?
Also, is the foundation for Tower 2 being prepared assuming that it will be built to the top and not just street level?
The east bathtub is new. The original WTC only had a bathtub west of Greenwich. The east side was only low-rise buildings.
Reply With Quote
     
     
  #1391  
Old Posted Jan 30, 2011, 6:26 PM
NYguy's Avatar
NYguy NYguy is offline
New Yorker for life
 
Join Date: Jul 2001
Location: Borough of Jersey
Posts: 57,194
Quote:
Originally Posted by uakoops View Post
The east bathtub is new. The original WTC only had a bathtub west of Greenwich. The east side was only low-rise buildings.
Yeah, the eastside of the bathtub is new, and one of the reasons Silverstein's towers were pushed so far behind. The Port Authority waited a few years after the site plan was selected to begin work on that. It was built pretty much the same as the original, only this time we got to witness it (assuming most of us didn't see the original get built).



Quote:
Originally Posted by asharmaearth411 View Post
Also, is the foundation for Tower 2 being prepared assuming that it will be built to the top and not just street level?
They're doing everything now beause they know the tower will be built as planned, it's just a question of when. Even with that uncertainty, they have to do it now, otherwise they would have to go back in, defeating all of the progress they are now making.
__________________
NEW YORK is Back!

“Office buildings are our factories – whether for tech, creative or traditional industries we must continue to grow our modern factories to create new jobs,” said United States Senator Chuck Schumer.
Reply With Quote
     
     
  #1392  
Old Posted Jan 30, 2011, 8:31 PM
BStyles BStyles is offline
Registered User
 
Join Date: Jul 2009
Posts: 557
Oh right, right. The trading floors.

Question. Tower 4 wasn't built the same way to grade. It looks like the building sits on top of a concrete pedestal. Is this because it's the shortest in the group and that it doesn't need the extra strength of steel to bedrock to support it?
Reply With Quote
     
     
  #1393  
Old Posted Jan 30, 2011, 8:52 PM
Zensteeldude Zensteeldude is offline
Honored Member
 
Join Date: Jul 2009
Location: Northern New Jersey
Posts: 692
Wait a minute, there were no highrise buildings on the east side of the origonal WTC site but there was an "East Bathtub".
There were basement levels under those low rise buildings.
This photo clearly shows the origonal slury wall built in the '60s running along the east side of the site. What took so long to get the towers 2 and 3 sites ready was the excavating and re-shuring of the existing slury walls.
http://www.flickr.com/photos/mflick-photos/5125112306/sizes/l/in/photostream/

Last edited by Zensteeldude; Jan 30, 2011 at 9:07 PM.
Reply With Quote
     
     
  #1394  
Old Posted Jan 30, 2011, 9:18 PM
STR's Avatar
STR STR is offline
Because I'm Clever!
 
Join Date: Oct 2004
Location: Chicago, Illinois
Posts: 5,078
^That was the old Hudson Terminal sublevels. It only covered half the area of the new excavation and didn't go as deep.
__________________
There are six phases to every project 1) enthusiasm, 2) disillusionment, 3) panic, 4) search for the guilty, 5) punishment of the innocent, 6) praise for the non-participants. - Guy Tozzoli
Build your own Model Skyscrapers** New York City 2015 3D Model W/ New WTC ** World Trade Center (1971-2001) 3D Model
Reply With Quote
     
     
  #1395  
Old Posted Jan 30, 2011, 9:25 PM
Zensteeldude Zensteeldude is offline
Honored Member
 
Join Date: Jul 2009
Location: Northern New Jersey
Posts: 692
Ok, but is the slury wall along Vesey St origonal, it sure looks it. (What is to be the north side of the T2 site.)

I'm slightly lost here, I have no prints for T2,3 and 4.
Photo by Patapsco
Reply With Quote
     
     
  #1396  
Old Posted Jan 31, 2011, 1:23 AM
asharmaearth411 asharmaearth411 is offline
Registered User
 
Join Date: Dec 2010
Posts: 55
Thumbs down

I agree. The slurry wall along Vessey St. looks original. I mean its not as smooth as other parts of the site. Maybe weathering is responsible for the look of this part of the site? There seems to be visible marks of patching, etc on this side, correct me if I'm wrong.

Quote:
Originally Posted by Zensteeldude View Post
Ok, but is the slury wall along Vesey St origonal, it sure looks it. (What is to be the north side of the T2 site.)

I'm slightly lost here, I have no prints for T2,3 and 4.
Photo by Patapsco
Reply With Quote
     
     
  #1397  
Old Posted Jan 31, 2011, 8:28 AM
STR's Avatar
STR STR is offline
Because I'm Clever!
 
Join Date: Oct 2004
Location: Chicago, Illinois
Posts: 5,078
The only part that was preexisting was ~50% of the eastern wall. If you look at the plans, it's actually pretty clear where the H&M sections are. The North and south are all new. However, I think they still did work underneath the old H&M walls, as the H&M terminal only went down to Elevation 264 (that number will probably only make sense to Zen) and I think the new tub is deeper than that.

A quick and dirty merge of WTC B4 and Plaza Levels


NWTC
__________________
There are six phases to every project 1) enthusiasm, 2) disillusionment, 3) panic, 4) search for the guilty, 5) punishment of the innocent, 6) praise for the non-participants. - Guy Tozzoli
Build your own Model Skyscrapers** New York City 2015 3D Model W/ New WTC ** World Trade Center (1971-2001) 3D Model

Last edited by STR; Jan 31, 2011 at 9:45 AM.
Reply With Quote
     
     
  #1398  
Old Posted Jan 31, 2011, 5:38 PM
NYguy's Avatar
NYguy NYguy is offline
New Yorker for life
 
Join Date: Jul 2001
Location: Borough of Jersey
Posts: 57,194
Quote:
Originally Posted by Zensteeldude View Post
Wait a minute, there were no highrise buildings on the east side of the origonal WTC site but there was an "East Bathtub".
Those walls are new. We watched them get built, and afterwards the excavation of the site. It was a relatively quiet process (compared to everything else that was happening with the site) but it did happen. That Vesey St wall looks original because they are basically all the same.


Brendan2008




http://www.hudsoncity.net/tubes/wtc-ht-construction.html

Quote:
East Bathtub Construction – This work will consist of the installation of a new slurry wall along Vesey Street between West Broadway and Church Street, Church Street between Vesey Street and Fulton Street, Church Street between Cortlandt Street/Way and Liberty Street, and along Liberty Street from Church Street to Greenwich Street. The new slurry wall will be designed to connect to a significant portion of the existing Hudson and Manhattan (H&M) Railroad basement wall along Church Street to create the full bathtub walls for the eastern portion of the WTC Site.
__________________
NEW YORK is Back!

“Office buildings are our factories – whether for tech, creative or traditional industries we must continue to grow our modern factories to create new jobs,” said United States Senator Chuck Schumer.

Last edited by NYguy; Jan 31, 2011 at 6:09 PM.
Reply With Quote
     
     
  #1399  
Old Posted Jan 31, 2011, 10:54 PM
Zensteeldude Zensteeldude is offline
Honored Member
 
Join Date: Jul 2009
Location: Northern New Jersey
Posts: 692
Very interesting, I had no idea they added that much wall.
Reply With Quote
     
     
  #1400  
Old Posted Feb 1, 2011, 12:28 AM
GioFX's Avatar
GioFX GioFX is offline
Euroscraper
 
Join Date: Jan 2004
Location: Padua, Italy
Posts: 617
^ Damn interesting indeeed.

The original east buthub / h&m terminal sulevels during final cleanup work in March 2002:





source: FEMA Photolibrary
__________________
Preserve the past, renew the present and build the future.
Don't use war. You can't fight fire with fire, and you can't fight terror with terror.
Having shady reasons for avoiding a war isn't nearly as bad as having shady reasons for going to war. - skylife

Last edited by GioFX; Feb 1, 2011 at 12:40 AM.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Global Projects & Construction > Supertall Construction
Forum Jump



Forum Jump


All times are GMT. The time now is 9:45 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.