Old Posted Nov 23, 2010, 3:24 AM
Millennium2002 Millennium2002 is offline
 
Join Date: Jun 2009
Posts: 1,742
I hate to break the conversation but I'm throwing another wild concept out there... this one focusing more on grade-separating the interchange and attempting to remove at least one or two traffic lights. In the process I did remove all the businesses (but no homes).

     
     
  #2002  
Old Posted Nov 23, 2010, 4:15 AM
xd_1771's Avatar
xd_1771 xd_1771 is offline
 
Join Date: Aug 2010
Posts: 1,745
Quote:
Originally Posted by allan_kuan View Post
I hate to break the conversation but I'm throwing another wild concept out there... this one focusing more on grade-separating the interchange and attempting to remove at least one or two traffic lights. In the process I did remove all the businesses (but no homes).

That is a bit more mindblowing than I would expect
I wonder how that provides direct connections to Route 1. The routing still seems to favour a trumpet interchange with Blue Mountain and original-Cape-Horn style movement (with lots o' weaving), and United as the main route (very bad idea).
There goes Planet Lazer though, definitely Aside from that, this concept would end up very, very, very expensive and probably not push through.
     
     
  #2003  
Old Posted Nov 23, 2010, 4:30 AM
Millennium2002 Millennium2002 is offline
 
Join Date: Jun 2009
Posts: 1,742
Yeah... I didn't exactly determine the highway 1 - Blue Mountain - United interchange complex yet... in fact I cut it out for that reason... part of the problem comes from Malliardville which is in the way and causes all sorts of problems with the three intersections that exist at the moment. Also there's a lack of space at the north side of Highway 1, railway tracks in between, and a somewhat short distance between the two networks which may cause weaving issues. Which reminds me... yeah, there's a weaving issue with that interchange... I just noticed it now. >< Oh well. I tried. =S

Both interchanges have been giving me mental workouts (and also an unfinished concept of the Pattullo Bridge on the north end) because I have to consider so many issues like:
- principal volume corridors
- possible redundancies of interchanges
- amount of space available
- guideways, railway tracks, and geographical obstacles
- other possible or necessary connections
- possible future expansions of road networks

I'm going to take a break on that actually because i'm just a nervous wreck right now while waiting for my driving exam on wednesday. ><
     
     
  #2004  
Old Posted Nov 23, 2010, 4:42 AM
xd_1771's Avatar
xd_1771 xd_1771 is offline
 
Join Date: Aug 2010
Posts: 1,745
Quote:
Originally Posted by allan_kuan View Post
Yeah... I didn't exactly determine the highway 1 - Blue Mountain - United interchange complex yet... in fact I cut it out for that reason... part of the problem comes from Malliardville which is in the way and causes all sorts of problems with the three intersections that exist at the moment. Also there's a lack of space at the north side of Highway 1, railway tracks in between, and a somewhat short distance between the two networks which may cause weaving issues. Which reminds me... yeah, there's a weaving issue with that interchange... I just noticed it now. >< Oh well. I tried. =S

Both interchanges have been giving me mental workouts (and also an unfinished concept of the Pattullo Bridge on the north end) because I have to consider so many issues like:
- principal volume corridors
- possible redundancies of interchanges
- amount of space available
- guideways, railway tracks, and geographical obstacles
- other possible or necessary connections
- possible future expansions of road networks

I'm going to take a break on that actually because i'm just a nervous wreck right now while waiting for my driving exam on wednesday. ><
Don't push yourself, concentrate on what you have to concentrate on. I don't have any driving tests anytime soon, in fact all I really have to do right now is school, which is how I can be on here and share ideas so often
     
     
  #2005  
Old Posted Nov 25, 2010, 8:00 AM
xd_1771's Avatar
xd_1771 xd_1771 is offline
 
Join Date: Aug 2010
Posts: 1,745
Excuse the double post, but this belongs here:
New West disapproves of all Braid overpass options!
Looks like no one wanted to get rid of Planet Lazer :p I have huge doubts about option A though, considering you've got two intersections close together, a lack of proper lanes, some redundancy, useless stopping areas, lack of right turn lanes, a merge involving two lanes into one and then again onto Brunette (and it is SHORT)... I think this'd be a good time to contact Translink with my idea.
     
     
  #2006  
Old Posted Nov 25, 2010, 8:37 AM
Metro-One's Avatar
Metro-One Metro-One is offline
 
Join Date: Sep 2008
Posts: 18,038
What is new? New West disapproves of all road projects within its boundaries, hence United Boulevard still ends as a single lane wooden bridge.
     
     
  #2007  
Old Posted Nov 25, 2010, 8:50 AM
red-paladin red-paladin is offline
 
Join Date: Sep 2008
Posts: 3,626
Quote:
Originally Posted by xd_1771 View Post
Excuse the double post, but this belongs here:
New West disapproves of all Braid overpass options!
Looks like no one wanted to get rid of Planet Lazer :p I have huge doubts about option A though, considering you've got two intersections close together, a lack of proper lanes, some redundancy, useless stopping areas, lack of right turn lanes, a merge involving two lanes into one and then again onto Brunette (and it is SHORT)... I think this'd be a good time to contact Translink with my idea.
Big surprise, New West hates road improvements. They not only tried to stop United BLVD from being connected to New West at all, but they pride themselves that everyone transferring from Highway 1 to 91A has to drive through their stupid 2 lane streets.
     
     
  #2008  
Old Posted Nov 25, 2010, 8:54 AM
dharper dharper is offline
 
Join Date: Jun 2010
Posts: 299
Why so expensive?

Why is this United Boulevard project so expensive? 150-175 Million? They built a comparable project in Langley at 204th, a couple of years ago, and it was only around 38 million.
     
     
  #2009  
Old Posted Nov 25, 2010, 12:25 PM
BCPhil BCPhil is offline
 
Join Date: Jun 2009
Posts: 2,578
Quote:
Originally Posted by xd_1771 View Post

I don't think that's a very fair example. The loop has much more lanes (including a dedicated right turn lane onto Royal) and usually never backs up. It's also nearly never used by long trucks.
They are both loops, one in your opinion is fine, the other a "ruiner". The problem isn't with the loops, it's with the volume of traffic. At the PB, you have 1 lane exiting into 1 lane on Royal. At QB, you have about 5 or 6 lanes worth of traffic from different directions squeezing onto a 2 lane bridge. Loops or not, traffic is going to be bad at the QB just because of how many people want to use it at peak hours. It's fine the rest of the day, and better than it ever was before.

Quote:
Originally Posted by xd_1771 View Post
Yes, and I can honestly say that I never had too many problems with the old layout. Then again, I usually only came on/off the bridge from a certain direction. IMO that is also the fault of traffic on 20th street, they are SUPPOSED to be YIELDING. I'd consider it a bit worse for 20th street southbound now, they not only have to face a merge point but also a light. I'll have to agree Marine/Stewardson movement is a big faster though depending on where you're going.
This will be a big change once the SFPR opens. The improved flow between Marine and the Bridge will be useful when trucks use the SFPR then 91/91A to get into the Fraser Lands, instead of coming off the PMB and travelling through New Westminster. The SFPR is going to be a bigger game changer than the NFPR.

Quote:
Originally Posted by xd_1771 View Post
Regardless of which way trucks will be going at that intersection, trucks will be using that intersection and without proper right turn lanes and median barriers the safety and capacity problems at hand could be quite large.
At that point it is a city street, what are safety barriers needed for? Again, trucks are not going to be coming off United and to go NB on Brunette. It's not going to be a major issue. Tucks can use King Edward or the east end of United and use the Cape Horn interchange. And trucks have dedicated exits at Cape Horn for getting onto United, so SB Brunette to EB United isn't going to be an issue either.

Quote:
Originally Posted by xd_1771 View Post
Chance-wise it is better to have two lanes, for with one lane as soon as a truck slips you are completely out of luck whatsoever. Trucks usually default to the right lane/slow lane anyways, and could be otherwise instructed to do so via radio if a snowstorm ever happens again. Even when there's no snow, some trucks are horrendously slow and with only one lane going up you could cause backups behind. It's a safety concern too; if a truck's engines were ever to fail going up, it would be at the cost of everybody behind. The ramp has to go up and over a Skytrain overpass (two levels) so I'd consider that crazy enough.
The Skytrain really isn't that high at that point. The top of the guideway is hardly higher than the trains in the BNSF yard. It almost looks short enough you could touch the bottom of the guideway standing under it.

If you had a 2 lane exit, then you would need at least a 5 lane elevated structure to avoid merging issues at that point.

So what if someone is stuck behind a truck for a hundred or so meters, it's just a few seconds, then at the top you can change lanes and pass. Very few off ramps around here are 2 lanes. There aren't any lights leading up to where the overpass is going to be, so trucks will have a running start at the ramp.

Quote:
Originally Posted by xd_1771 View Post
I rather think that Translink is missing a point here. They seem to be deliberately removing a major highway connection that involves going through one intersection and then getting on the on-ramp, when in the future you'd have to go through the uphill ramp and two sets of on-ramps with a lot of weaving and merging in short distances just to get onto the Highway. United should not be a focus for the heavy through truck movement between Brunette/New West and the Mary Hill Bypass/Port Coquitlam. Highway 1 will have enough capacity to handle such traffic with 4+1 HOV lanes (a massive upgrade from 2+1), and I think provisions least wide enough to add a 3+1HOV+2 collector/direction C-D system if the time comes. It is also the only major connection for commuters/non-trucks going between all of Coquitlam and New West during the morning or afternoon commute, and a lot of people in this metropolitan area move such distances to go to work; whether in a car or on a bus, the issue is the same.
But like you've been complaining about, trucks are slow. What makes you think they'll be any faster at merging coming off your proposed on ramp, which is closer to Cape Horn than Brunette, and be up to speed to pick change lanes to the proper exit at Cape Horn? Why make a slow moving truck get on to a fast moving freeway for 2km, only to have him slow down an exit when it gets off? You were just complaining about slow moving trucks cramping your —, now you want to throw them on a 10 lane freeway?

A truck can still get on the TCH at Brunette. There is no need to build a $300 million Viaduct onto the TCH from Brunette. The improvements at Brunette are going to make a difference (but I would have like to see the original proposal built, Thanks Coquitlam) and Blue Mountain won't be done until after the SFPR is done and probably not until after the new Pattullo and McBride connector. Traffic from 91 or Burnaby will just use the AFB, and get on the SFPR. After the SFPR is done, we'll see fewer trucks on Brunette. It will mostly be traffic bound for the industrial area at the foot of the PMB or for Marry Hill bypass. It's going to be pointless for trucks to travel through New West to use a toll bridge when there are better, free options.

Quote:
Originally Posted by xd_1771 View Post
Lack of right turn lanes cause bigger problems than you think; a lot of people don't signal right away so they'll be signalling only a few meters before the turn and slamming the brakes, which could be a safety issue considering trucks need more time to decelerate. If there are pedestrians or other such traffic there, you're basically SOL until they move out of the way and often times by the time the pedestrian light ends and they are out of the way, the light turns yellow and red, and therefore you are stuck. With the amount of trucks and general traffic being added onto the route there will be near-zero opportunity to pass in the left lane. This is a major problem in Surrey right now and I worry it could become a major problem somewhere else.

What you said about United not being a highway is right, hence Translink should not convert United into a major truck route.
But that's what it was originally built as. It's a pretty beefy road, with a major interchange already built at the East end connecting United to Lougheed (which Gateway is taking advantage of).

There are very few (none at the moment) residents in the area, and most of the traffic already is industrial/commercial. Why not keep that traffic on a road that was built for them. Having truck congestion on that road isn't harming any commuter, except the few that work in the area. And that's the point, the increased traffic on United isn't going to harm residential areas or commuters.

Trucks that want to avoid it can. They can travel through Brunette to Lougheed and use the Cape Horn to get to Marry Hill or Lougheed to Coquitlam Center, or the PMB.

P.S., you might want to read up on your driver's manual. You are supposed to leave a safe distance to the car in front of you. That means you need to leave enough room so if the person in front of you slams on their brakes to avoid hitting a kitty cat on the road, you have enough time to react and apply your brakes too. If you are following so close you don't have time to react to people turning right, you aren't going to do well on your driver's test. As for trucks, the speed limit isn't going to be 90, they won't be riding people's asses when there are lights around.

Quote:
Originally Posted by xd_1771 View Post
That's a major problem, there are currently no provisions for being able to get on the TCH or Lougheed easily without a lot of merging, weaving, and stopping via low-capacity ramps. In fact I'd rather think of them as removing these provisions, possibly on purpose.
The ramps from Brunette are getting a major improvement. Again, not as good as it should have been, but it will be a lot better. I don't see how traveling through the Braid intersection to the Brunette interchange is a issue for car traffic. And at the east end of United at the existing interchange, it looks like Lougheed is going to be divided into 4 sections (sort of similar to how it is now) to divide traffic flow into to/from PMB and to/from the west.

I there will be any more merging or weaving than in your plan.

Quote:
Originally Posted by xd_1771 View Post
Trucks or not, as I said avenue right turns are a major problem in Surrey. I have seen way more of Surrey roads than you have, sitting at at least two intersections at similar times of day waiting for the bus, every day for 2 months, studying the traffic flow as I wait. The same issues I fear could happen to United because all that traffic on E. Columbia is apparently being directed onto United - a very similar amount of traffic to 104th Avenue today with a mix of trucks, commuters in cars and buses. There already is access to Highway 1; it will be removed. With the additional capacity, as I once again said, there will be no reason to avoid the 1 at least in the short term. United will still be there as an alternate route, but by no means should it become a primary route for traffic.
It's great that you've studied 2 intersections so closely for 2 whole months. I've only driven all over the lower mainland in my car for years. I've lived in 7 different places in the region in the last 10 years. I've traveled in all kinds of different directions at all kinds of different times of day. I feel inadequate.

There is a difference between United and 104 ave. 104 ave is a major street through the heart of Surrey connecting 2 of the largest SoF town centers. It connects City Center to the TCH, and is used by trucks bound for the Fraser Docks and River Road.

United is through industrial land. It's not a road people NEED to use to get places. Commuter traffic is on the TCH. Who the — cares if United is a parking lot of trucks between King Edward and Marry Hill? There are other casinos nearby and Ikea is safe.

The important thing is to keep TCH and Lougheed as clear as possible for those who NEED it so that it's fast for commuters. Regular Travelers on Brunette don't need to get onto United, they stay on Brunette and can use the ramp to the TCH or go to Lougheed.

Quote:
Originally Posted by xd_1771 View Post
I agree, it does not have to be a freeway. However, consider how bad intersections are treated in this area and how often they're placed where they shouldn't be. Think of the lineups on Highway 91 northbound every single morning at 72nd. Think of the total mess 104th is all day, every day between 152nd and the Route 1 on-ramp. Think of the Mary Hill Bypass. I think intersections will at least need to be minimized on such a busy route. Not every direction needs dedicated left turns; some left turns, including Brunette > Braid WB (use North Road damnit) will be or are already redundant. I try to avoid redundancy where possible, it just results in extra costs and problems.
104 will be a lot better in a few years once SFPR opens. Which is sort of like what the NFPR will do, get trucks off roads used by local and commuting traffic.

Light controlled intersections are pretty few and far between on the Marry Hill Bypass (4 by my count), the major problem used to the the PRB, and the intersection at United (which won't be a problem after this). And between Highway 1 and McBride there are 5 lights on Brunette/Columbia. Improvements need to be made to that stretch, but the fault doesn't entirely lay on the lights.

There actually isn't a left turn at from Brunette to WB Braid, most people already do drive through Columbia to North road. Again, it's Columbia there, and New West wants to minimize traffic going through their city on E. Columbia; they've done as much traffic calming as possible and lowered the speed limit to 30. The only reason that intersection at Brunette and Columbia is still open is because of the Hospital. And it depends on which option they want to go with, but United to WB Braid should be a travel option once it's done.

Quote:
Originally Posted by xd_1771 View Post
You had a better option of Como Lake. I lived south of Burquitlam plaza much closer to Lougheed Town Centre and the best route for me was to go south, especially eastbound. For people living further east (where most people are concentrated in Burquitlam) Blue Mountain would be the better option.
In the rough and tumble shadow of the Vancouver Golf Club isn't really Burquitlam. But if you are already on the East Side of North, heading East on Austin is a lot faster than turning left onto North and going through the North Road Plazas. Going South on North Rd was only an option after 8pm, and only faster than Lougheed to Brunette if you went 90km/h down North.

[QUOTE=xd_1771;5065878]
The current Brunette interchange/on ramps option ruins everything there. It seemed much faster to use North-Braid-Brunette-TCH1 EAST on a non-busy day when no trains were crossing, since you didn't have to deal with a stop-sign-controlled dual right turn, sharp angles turns and an unsignalized left turn preceding a curve in the road where it is very hard to turn... I'm pretty sure other people thought the same. Once Blue Mountain is constructed, the triangle at Lougheed/BM/Brunette is resolved and ramps are better angled, that problem will have been solved.
[quote]

When it's not busy out, the most direct route is the fastest. Failing that, the route with the faster speed limit, and Lougheed was more direct and had a faster limit. If it's not busy out, there should be no problem turning right onto Brunette and turning left off Brunette on to the TCH. If its busy, heading to Gaglardi is the safest bet, it was longer but guaranteed to not be locked up.

Quote:
Originally Posted by xd_1771 View Post
There's one point proven by yourself. A lot of people in New West may choose to avoid the Pattullo, especially for more long-distance trips east of Surrey. Braid > Brunette > Rte. 1 East is also the only reliable route from New West to Coquitlam and proper. I'm thinking that the one way bridge is more of a problem than the rail crossing right now, and even then I doubt it would cost that much to build a very short cut-and-cover tunnel for the railway if it is such a problem, and would likely end up the better option as it would keep traffic moving straight on a better, higher-capacity route. The money saved from ramp/overpass simplicity and little property acquisition can be put onto that.
If people in New West are heading for points east of Surrey, they probably will use TCH, until the NFPR opens, then they can use Pattullo for free (for now) and access NFPR and avoid the PMB toll.

But if they do want to use the TCH they can already get on it at Brunette. Your plan makes it quite a bit harder for travelers in New West to access Highway 1. They go from 1 intersection to needing to use 2, plus cross rail tracks. And those tracks are not moving an inch. Not until a new billion dollar rail river crossing is built somewhere. There is no room for the tracks to go over or under and have room to make grade at where they cross the creeks and join with the other tracks. And there are 4 tracks there, it would be a pretty major project to move them if you could. Moving the tracks to a tunnel or overpass would cost orders of magnitude more than the proposed overpass, then on top of that we have to build your idea. It's turning from a $200 million project into something beyond the scale of GEB.
     
     
  #2010  
Old Posted Nov 25, 2010, 12:32 PM
BCPhil BCPhil is offline
 
Join Date: Jun 2009
Posts: 2,578
Quote:
Originally Posted by dharper View Post
Why is this United Boulevard project so expensive? 150-175 Million? They built a comparable project in Langley at 204th, a couple of years ago, and it was only around 38 million.
Yeah, it does seem a bit high. I guess it's a bit longer with the elevated section probably going all the way from where United ends now to Brunette, plus the interchange is more complex. And being built on probably very over valued land doesn't help.
     
     
  #2011  
Old Posted Nov 25, 2010, 3:57 PM
whiteshadow whiteshadow is offline
 
Join Date: Nov 2009
Posts: 73
Quote:
Originally Posted by dharper View Post
Why is this United Boulevard project so expensive? 150-175 Million? They built a comparable project in Langley at 204th, a couple of years ago, and it was only around 38 million.
My guess is that they have factored in land acquisition purchases... similar to why the SFPR has such a large budget, almost half that money (IIRC) was spent on buying up properties in Delta along River Road.
     
     
  #2012  
Old Posted Nov 25, 2010, 5:53 PM
Mininari Mininari is offline
 
Join Date: Jul 2004
Posts: 2,447
Truck traffic originating in Coquitlam is still going to need to traverse New Westminster if its going to Richmond / Burnaby / Vancouver. I can't imagine that a truck driver would drive further, AND pay a toll to cross the Port Mann, and use the SFPR to avoid New West.

Now, what is feasible for routing is said truck traffic uses the NFPR to connect from Coquitlam to a new Patullo bridge, which has direct ramps to / from the NFPR, and to / from the SFPR. Trucks can now make their way to Richmond / Vancouver via the SFPR and Hwy 91. The key is ensuring that this route is built PROPERLY with full interchanges. Brunette and East Columbia would need some upgrades, but the key benefit (to appease New West) is it would effectively remove a large amount of traffic pressure on Downtown New West.
     
     
  #2013  
Old Posted Nov 25, 2010, 6:03 PM
go_leafs_go02 go_leafs_go02 is offline
 
Join Date: Dec 2007
Posts: 2,406
does the MOT have the ability to come in and just — roads up and claim them as provincial highways?

You could then extend Highway 7A or whatever along United, along Brunette, down Front street and connect it to the 91A at Queensborough Bridge.

Take over the roads, and you can do whatever you want with widening. Sheesh New Westminster makes me gag. They're such a stumbling block towards anything other than themselves.
     
     
  #2014  
Old Posted Nov 25, 2010, 6:17 PM
Stingray2004's Avatar
Stingray2004 Stingray2004 is offline
 
Join Date: Jan 2004
Posts: 3,145
With New West it's all political. Increasing regional THRU traffic traverses New West in both N/S and E/W directions and it's been a sore point for many years.

The UBE is just another example. Either option A is chosen, which will not interrupt a residential neighbourhood, or New West council will nix the extension.

Again, a new SFPR/Pattullo Bridge/freeway standard McBride/Stormont Connector would address both those regional traffic flows in terms of time savings - killing two birds with one stone.
     
     
  #2015  
Old Posted Nov 25, 2010, 7:39 PM
whiteshadow whiteshadow is offline
 
Join Date: Nov 2009
Posts: 73
Quote:
Originally Posted by go_leafs_go02 View Post
does the MOT have the ability to come in and just — roads up and claim them as provincial highways?

You could then extend Highway 7A or whatever along United, along Brunette, down Front street and connect it to the 91A at Queensborough Bridge.

Take over the roads, and you can do whatever you want with widening. Sheesh New Westminster makes me gag. They're such a stumbling block towards anything other than themselves.
MoT (and the Prov Gov't) seems to be scared of the cities and possible political fallout; they definitely "could" take over roads and just get them built (like they do in Alberta, Ontario and US) but here politiicians and road builders just seem to look for the easy way out.

This problem of building the NFPR shouldn't be that big a deal (compared to the SFPR), the roadway is already there and it just needs some upgrading in key spots.
     
     
  #2016  
Old Posted Nov 25, 2010, 8:12 PM
golog golog is offline
 
Join Date: Oct 2010
Posts: 356
It's a touchy subject

Imagine if the MoT stepped in and said no more new homes or business parks were to be constructed in Surrey. Sure those developments would add exponential strain to the transportation system, ultimately creating a big cash demand or a passive bill in the form of congestion -- but why should Surrey's zoning be a provincial concern? Should the Federal government intercede in the landscaping of community parks?

Both extremes are unacceptable, but how do you set up a system that provides optimal cooperation. That's the single problem we always keep returning to

I can understand why New West would rather not have a highway along its stretch of waterfront. At the same time, the land is also very important to regional transportation. There's a solution in having the highway below grade, with local roads/sidewalks/parks above it so New West isn't disconnected from the waterfront -- but how long until that is an affordable option? When would a rail network for local freight make more sense (due to needing less area to move more cargo)?

Until there is a solution that works for everyone, we just have to adapt in our transportation patterns. Until freight between midnight and 6AM ticks up, the strain really can't be too bad.
     
     
  #2017  
Old Posted Nov 26, 2010, 1:10 AM
xd_1771's Avatar
xd_1771 xd_1771 is offline
 
Join Date: Aug 2010
Posts: 1,745
Quote:
Originally Posted by BCPhil View Post
They are both loops, one in your opinion is fine, the other a "ruiner". The problem isn't with the loops, it's with the volume of traffic. At the PB, you have 1 lane exiting into 1 lane on Royal. At QB, you have about 5 or 6 lanes worth of traffic from different directions squeezing onto a 2 lane bridge. Loops or not, traffic is going to be bad at the QB just because of how many people want to use it at peak hours. It's fine the rest of the day, and better than it ever was before.
There is no merge after the single lane exit onto Royal. Therefore the situation is different. You do not have 5 or 6 lanes worth of traffic squeezing onto a two-lane bridge at Queensborough, that is an overstatement.

Quote:
Originally Posted by BCPhil View Post
This will be a big change once the SFPR opens. The improved flow between Marine and the Bridge will be useful when trucks use the SFPR then 91/91A to get into the Fraser Lands, instead of coming off the PMB and traveling through New Westminster. The SFPR is going to be a bigger game changer than the NFPR.
The layout does at least seem to favour traffic heading in that direction, so you have a point, but I don't think the interchange was designed with the fact that most traffic is still (currently) heading to Stewardson in mind.

Quote:
Originally Posted by BCPhil View Post
At that point it is a city street, what are safety barriers needed for? Again, trucks are not going to be coming off United and to go NB on Brunette. It's not going to be a major issue. Tucks can use King Edward or the east end of United and use the Cape Horn interchange. And trucks have dedicated exits at Cape Horn for getting onto United, so SB Brunette to EB United isn't going to be an issue either.
Even if it is a city street, there will be plenty of traffic along it with the upgrades - even if not enough traffic to choke the intersection. Some trucks may want to go across this intersection to a truck yard or may be traveling along Braid. There may still be a lot of regular traffic as well. I don't think it'd matter anymore anyways, as New West doesn't seem to approve of any loop ramps; I don't either.

Quote:
Originally Posted by BCPhil View Post
The Skytrain really isn't that high at that point. The top of the guideway is hardly higher than the trains in the BNSF yard. It almost looks short enough you could touch the bottom of the guideway standing under it.
The new bridge will be higher than the Skytrain though. Considering you're building this overpass near a small creek the overpass may need to be even higher than just a single level enough to allow trains through in the emergency case that it ever sinks.

Quote:
Originally Posted by BCPhil View Post
If you had a 2 lane exit, then you would need at least a 5 lane elevated structure to avoid merging issues at that point.
Hence as with my plan you simplify and only allow connections from United/Hwy 1 - Brunette SB and brunette NB - United/Hwy 1. All other connections can and should continue using the Braid connector. Sure you have to deal with a railway crossing, but with a new intersection with blue mountain before the bridge which even then will be much wider and with not as much traffic using that route, it won't be a huge problem.

Quote:
Originally Posted by BCPhil View Post
So what if someone is stuck behind a truck for a hundred or so meters, it's just a few seconds, then at the top you can change lanes and pass. Very few off ramps around here are 2 lanes. There aren't any lights leading up to where the overpass is going to be, so trucks will have a running start at the ramp.
The ramp will apparently be very long due to the smaller grade, it may not be a few seconds especially on wet or snow days when trucks could become completely stuck. You are going to be handling a large amount of truck volume on a major corridor onto one lane; other off-ramps around here are merely transfer points, and the ones that do handle a major route (example: Lougheed EB to United SB which leads to Mary Hill Bypass) are multi-laned. There's a lot of traffic in that section already despite that there are no lights there.

Quote:
Originally Posted by BCPhil View Post
But like you've been complaining about, trucks are slow. What makes you think they'll be any faster at merging coming off your proposed on ramp, which is closer to Cape Horn than Brunette, and be up to speed to pick change lanes to the proper exit at Cape Horn? Why make a slow moving truck get on to a fast moving freeway for 2km, only to have him slow down an exit when it gets off? You were just complaining about slow moving trucks cramping your —, now you want to throw them on a 10 lane freeway?

A truck can still get on the TCH at Brunette. There is no need to build a $300 million Viaduct onto the TCH from Brunette. The improvements at Brunette are going to make a difference (but I would have like to see the original proposal built, Thanks Coquitlam) and Blue Mountain won't be done until after the SFPR is done and probably not until after the new Pattullo and McBride connector. Traffic from 91 or Burnaby will just use the AFB, and get on the SFPR. After the SFPR is done, we'll see fewer trucks on Brunette. It will mostly be traffic bound for the industrial area at the foot of the PMB or for Marry Hill bypass. It's going to be pointless for trucks to travel through New West to use a toll bridge when there are better, free options.
There will not be any change of lanes at the proper exit for Cape Horn, because you will be heading onto the lane that already exits for MHB. My plan can be modified to allow for separate, more direct exits onto United - something which I haven't had much time to do lately. The Mary Hill Bypass will be part of the upgrade scope and will soon have interchanges too, so it will not be that much slower anymore after a truck gets off. There is a second lane that also exits to MHB that can be used by faster traffic to exit for MHB. The $300 million for a direct viaduct that is simple and features few but working connections will be much cheaper than building several viaducts with more ramps and connections that aren't even going to be as efficient.

I am not so confident with the SFPR considering the planned intersection at the 91 corridor, it may end up going back to pre-SFPR due to trucks not liking the traffic volumes/stoppage there.

Keep in mind these trucks may be heading for Pitt Meadows/Maple Ridge as well, both of which have plenty of industrial. It would be a more viable alternative for the tolled and unhealthy-for-local-business Golden Ears Bridge.

Quote:
Originally Posted by BCPhil View Post
But that's what it was originally built as. It's a pretty beefy road, with a major interchange already built at the East end connecting United to Lougheed (which Gateway is taking advantage of).

There are very few (none at the moment) residents in the area, and most of the traffic already is industrial/commercial. Why not keep that traffic on a road that was built for them. Having truck congestion on that road isn't harming any commuter, except the few that work in the area. And that's the point, the increased traffic on United isn't going to harm residential areas or commuters.

Trucks that want to avoid it can. They can travel through Brunette to Lougheed and use the Cape Horn to get to Marry Hill or Lougheed to Coquitlam Center, or the PMB.
The interchange is smack-dab east of a residential area and will be the (only?) major point for a lot of travelers... ahem, RESIDENTS... from New West. There will also be no Brunette Avenue connection to Lougheed in time at all, which will force pretty much all trucks going to that area to use that under-capacity overpass.

Quote:
Originally Posted by BCPhil View Post
P.S., you might want to read up on your driver's manual. You are supposed to leave a safe distance to the car in front of you. That means you need to leave enough room so if the person in front of you slams on their brakes to avoid hitting a kitty cat on the road, you have enough time to react and apply your brakes too. If you are following so close you don't have time to react to people turning right, you aren't going to do well on your driver's test. As for trucks, the speed limit isn't going to be 90, they won't be riding people's asses when there are lights around.
A lot of people here don't drive that way; BC drivers are often accustomed to going as far as they can. Often the right turns are fairly sharp and slow and even with a safe distance there is a fair amount of slow-down involved. With even a speed limit of 60 this can create a bottleneck. It seems worse when traffic is just speeding up after a red light; a lot of traffic that could be moving forward is not able to, stopped by a car turning right - which may also be stopped and blocking the lane because of a crossing pedestrian, a huge problem I face every day at SB 156th @ 100th on the way to school that has caused me to be late a few times even.

Quote:
Originally Posted by BCPhil View Post
The ramps from Brunette are getting a major improvement. Again, not as good as it should have been, but it will be a lot better. I don't see how traveling through the Braid intersection to the Brunette interchange is a issue for car traffic. And at the east end of United at the existing interchange, it looks like Lougheed is going to be divided into 4 sections (sort of similar to how it is now) to divide traffic flow into to/from PMB and to/from the west.
It is obviously no issue for car traffic because car traffic is a lot slower than trucks. Once again, there will soon be no more ramps at Brunette except for getting onto/from WB highway 1, a major traffic route usually only for local commuters.

There will apparently be no changes to the current Lougheed/United interchange northeast of Cape Horn, this was proposed initially but cancelled in a more recent revision; it may not have been necessary anyway. The only changes will be the lane structure just southwest closer to the Cape Horn to tie in with that interchange a bit better. Even then, most of the traffic will be heading for the Mary Hill Bypass (still a regular intersection - in fact if I'm not mistaken, it features an on-ramp involving two lanes coming from dual turns merging into the one and then onto MHB - a potentially very attractive bottleneck.

Quote:
Originally Posted by BCPhil View Post
I there will be any more merging or weaving than in your plan.
There will be less ramps in my plan and less problems; I would show you an updated plan which involves a slightly different ramp structure with the viaduct and a straight Blue Mountain, but I haven't been able to get it on paper just yet. It might be better than my initial image.

Quote:
Originally Posted by BCPhil View Post
It's great that you've studied 2 intersections so closely for 2 whole months. I've only driven all over the lower mainland in my car for years. I've lived in 7 different places in the region in the last 10 years. I've traveled in all kinds of different directions at all kinds of different times of day. I feel inadequate.

There is a difference between United and 104 ave. 104 ave is a major street through the heart of Surrey connecting 2 of the largest SoF town centers. It connects City Center to the TCH, and is used by trucks bound for the Fraser Docks and River Road.

United is through industrial land. It's not a road people NEED to use to get places. Commuter traffic is on the TCH. Who the — cares if United is a parking lot of trucks between King Edward and Marry Hill? There are other casinos nearby and Ikea is safe.

The important thing is to keep TCH and Lougheed as clear as possible for those who NEED it so that it's fast for commuters. Regular Travelers on Brunette don't need to get onto United, they stay on Brunette and can use the ramp to the TCH or go to Lougheed.

104 will be a lot better in a few years once SFPR opens. Which is sort of like what the NFPR will do, get trucks off roads used by local and commuting traffic.
2 intersections is an example; those two intersections are only ones I have studied more closely. I have been to many places in the lower mainland via very many different forms of transport and have lived/stayed in close to as many different places. The only difference is that I have been here for only 5 years. 104th Avenue was only cited as an example; there are many trucks using this road as there are on current Brunette & United and will be on future Brunette; these will be mostly removed with the new SFPR. With the Brunette route, the trucks will still be there. Therefore there is a difference, an an important one to note.

United is not a road people need to use to get places, hence I designed my plan to denote United as a local connector road to businesses. There are two routes already existing in that area that are both being upgraded that you can use to actually get places: Route 1 and Route 7. There are plenty of other businesses on United that could get seriously affected if United did end up a parking lot of trucks. Especially with IKEA nearby, those places could go out of business.

Quote:
Originally Posted by BCPhil View Post
Light controlled intersections are pretty few and far between on the Marry Hill Bypass (4 by my count), the major problem used to the the PRB, and the intersection at United (which won't be a problem after this). And between Highway 1 and McBride there are 5 lights on Brunette/Columbia. Improvements need to be made to that stretch, but the fault doesn't entirely lay on the lights.
Nevertheless these lights will be replaced by interchanges; The MHB is a very busy route, mostly for trucks. Interchanges would be important for safety on this route.

Quote:
Originally Posted by BCPhil View Post
There actually isn't a left turn at from Brunette to WB Braid, most people already do drive through Columbia to North road. Again, it's Columbia there, and New West wants to minimize traffic going through their city on E. Columbia; they've done as much traffic calming as possible and lowered the speed limit to 30. The only reason that intersection at Brunette and Columbia is still open is because of the Hospital. And it depends on which option they want to go with, but United to WB Braid should be a travel option once it's done.
Exactly, it is a redundant route. People will be able to use an upgraded Front Street rather than Columbia for commuting. United can be linked to WB Braid via an intersection or two in my plan; it's fairly simple.

Quote:
Originally Posted by BCPhil View Post
In the rough and tumble shadow of the Vancouver Golf Club isn't really Burquitlam. But if you are already on the East Side of North, heading East on Austin is a lot faster than turning left onto North and going through the North Road Plazas. Going South on North Rd was only an option after 8pm, and only faster than Lougheed to Brunette if you went 90km/h down North.
Except that going east on Austin isn't a very direct route to Highway 1 EB and the PMB. There is usually never traffic on that EB stretch of Route 1 between Brunette and the current Cape Horn, therefore it is faster anyway. I did not live far from North Road either, and somewhat more north of Austin as well.

Quote:
Originally Posted by BCPhil View Post
When it's not busy out, the most direct route is the fastest. Failing that, the route with the faster speed limit, and Lougheed was more direct and had a faster limit. If it's not busy out, there should be no problem turning right onto Brunette and turning left off Brunette on to the TCH. If its busy, heading to Gaglardi is the safest bet, it was longer but guaranteed to not be locked up.
Brunette is actually a fairly good bottleneck there, you could be waiting a long time turning on Brunette, not to mention with the amount of traffic you could block up the main lanes of Brunette; I know I did and so did the cars in front of me, every single time I tried that route.

Quote:
Originally Posted by BCPhil View Post
If people in New West are heading for points east of Surrey, they probably will use TCH, until the NFPR opens, then they can use Pattullo for free (for now) and access NFPR and avoid the PMB toll.

But if they do want to use the TCH they can already get on it at Brunette. Your plan makes it quite a bit harder for travelers in New West to access Highway 1. They go from 1 intersection to needing to use 2, plus cross rail tracks. And those tracks are not moving an inch. Not until a new billion dollar rail river crossing is built somewhere. There is no room for the tracks to go over or under and have room to make grade at where they cross the creeks and join with the other tracks. And there are 4 tracks there, it would be a pretty major project to move them if you could. Moving the tracks to a tunnel or overpass would cost orders of magnitude more than the proposed overpass, then on top of that we have to build your idea. It's turning from a $200 million project into something beyond the scale of GEB.
That would mean funneling more traffic into Surrey and the overcrowded KGB and 104th which is a bad idea, but I guess it is inevitable for now. The new Pattullo should be completed at the same time as the majority of the NFPR upgrades including Front Street. At that single intersection they will be moving straight and there will be less complex phases at the traffic signals. Even then, most of them could be using Columbia and Brunette anyway which would be a somewhat faster route when the main NFPR opens (if it's not bottlenecked/clogged). The 4 tracks there aren't that busy; one of them is a local connection spur that leads to a few industrial buildings. The 5th track just to the east is a redundant connector. The Canada Line cost ~$2 billion and that includes station/trains/maintaining cost, and also for half of the line that isn't even in a tunnel. I doubt a few hundred metre simple cut-and-cover structure for 3 tracks would cost that much, and can be constructed in much the same way as the Canada Line with the small two-three lane temporary bridges since Braid doesn't have too many lanes there anyway. I'm pretty sure it would cost much less than a series of unnecessary but complex overpasses to the east, because in trade you would only need to construct simple overpasses and few ramps.

Quote:
Originally Posted by BCPhil View Post
Yeah, it does seem a bit high. I guess it's a bit longer with the elevated section probably going all the way from where United ends now to Brunette, plus the interchange is more complex. And being built on probably very over valued land doesn't help.
The route is being built near a creek, there may be various costs for environmental preservation as well as proper pre-loading of the overpass. The overpass will likely be long and designed to accommodate a Blue Mountain expansion.
Quote:
Originally Posted by Mininari View Post
Truck traffic originating in Coquitlam is still going to need to traverse New Westminster if its going to Richmond / Burnaby / Vancouver. I can't imagine that a truck driver would drive further, AND pay a toll to cross the Port Mann, and use the SFPR to avoid New West.

Now, what is feasible for routing is said truck traffic uses the NFPR to connect from Coquitlam to a new Patullo bridge, which has direct ramps to / from the NFPR, and to / from the SFPR. Trucks can now make their way to Richmond / Vancouver via the SFPR and Hwy 91. The key is ensuring that this route is built PROPERLY with full interchanges. Brunette and East Columbia would need some upgrades, but the key benefit (to appease New West) is it would effectively remove a large amount of traffic pressure on Downtown New West.
Though I'm not sure if the new Patullo will have enough lanes to handle such a transfer (in fact it might need extra lanes or even a separate bridge!) I like your idea of removing trucks from the 91A area and downtown New West; it'd appease New West and create a good route option. The westbound traffic there without trucks could stabilize to the point where I'll have a faster route to Richmond again It might be costly though, you'd need to perform some upgrades to the Nordel Way interchange (since you're going to be dealing with a short left turn lane onto the on-ramp accommodating a bunch of trucks that could clog up the main road for travelers into Surrey) in order to accommodate that kind of traffic load.
     
     
  #2018  
Old Posted Nov 26, 2010, 1:23 AM
BCPhil BCPhil is offline
 
Join Date: Jun 2009
Posts: 2,578
Quote:
Originally Posted by Mininari View Post
Truck traffic originating in Coquitlam is still going to need to traverse New Westminster if its going to Richmond / Burnaby / Vancouver. I can't imagine that a truck driver would drive further, AND pay a toll to cross the Port Mann, and use the SFPR to avoid New West.

Now, what is feasible for routing is said truck traffic uses the NFPR to connect from Coquitlam to a new Patullo bridge, which has direct ramps to / from the NFPR, and to / from the SFPR. Trucks can now make their way to Richmond / Vancouver via the SFPR and Hwy 91. The key is ensuring that this route is built PROPERLY with full interchanges. Brunette and East Columbia would need some upgrades, but the key benefit (to appease New West) is it would effectively remove a large amount of traffic pressure on Downtown New West.
Yeah, but trucks between Port Coquitlam and Richmond/Burnaby are a minority of the truck traffic on Brunette.

Right now, if you are coming from Delta Port in Tsawassen, and going to Abbotsford (and beyond) it's even money going one of 2 ways. You can take 99 WB and then highway 10 through Langley. Depending on time of day, it is just as fast to take 99 NB, change to 91 EB, then take Queensborough/Stewardson/Front/Columbia/Brunette to the TCH and over the PMB. That route is especially faster if you are starting on Anacis Island (or going to) and don't want to cut through Surrey on 88 ave. Trucks still do travel through Surrey, it's up to driver's personal preference. But a lot of traffic uses the current NFPR route as a shortcut to bypass traveling through Langley/Surrey.

NFPR is going to be important for moving goods and people between the Tri Cities and Burnaby/Richmond, but the SFPR is going to have a huge impact on travel. Gateway is a major improvement over existing infrastructure, but the SFPR is a whole new ballgame. It opens up travel options that didn't exist before.

I would bet trucks on Brunette drops by 33 to 50% after the SFPR opens. Which is why I feel that providing a connection between Brunette and United is important for trucks, because once many of trucks are gone from the road, a majority of the remaining ones will be traveling to/from/through that area, and not interested in the PMB. It would be best to provide a more dedicated truck route and keep commercial traffic separate from commuter traffic as much as possible.
     
     
  #2019  
Old Posted Nov 26, 2010, 1:36 AM
xd_1771's Avatar
xd_1771 xd_1771 is offline
 
Join Date: Aug 2010
Posts: 1,745
Quote:
Originally Posted by BCPhil View Post
Yeah, but trucks between Port Coquitlam and Richmond/Burnaby are a minority of the truck traffic on Brunette.

Right now, if you are coming from Delta Port in Tsawassen, and going to Abbotsford (and beyond) it's even money going one of 2 ways. You can take 99 WB and then highway 10 through Langley. Depending on time of day, it is just as fast to take 99 NB, change to 91 EB, then take Queensborough/Stewardson/Front/Columbia/Brunette to the TCH and over the PMB. That route is especially faster if you are starting on Anacis Island (or going to) and don't want to cut through Surrey on 88 ave. Trucks still do travel through Surrey, it's up to driver's personal preference. But a lot of traffic uses the current NFPR route as a shortcut to bypass traveling through Langley/Surrey.

NFPR is going to be important for moving goods and people between the Tri Cities and Burnaby/Richmond, but the SFPR is going to have a huge impact on travel. Gateway is a major improvement over existing infrastructure, but the SFPR is a whole new ballgame. It opens up travel options that didn't exist before.

I would bet trucks on Brunette drops by 33 to 50% after the SFPR opens. Which is why I feel that providing a connection between Brunette and United is important for trucks, because once many of trucks are gone from the road, a majority of the remaining ones will be traveling to/from/through that area, and not interested in the PMB. It would be best to provide a more dedicated truck route and keep commercial traffic separate from commuter traffic as much as possible.
It does indeed seem so, though keep in mind that in Richmond we have a major airport, and in Port Coquitlam we have a major railyard; though the traffic on this route would seem smaller than the traffic continuing to Abbotsford I'd still consider it a major choice of route. I do agree that a separate truck route may be needed however I doubt United will be up to the task as a major route. I'm not even confident that it will end up so, with Highway 1 to the north and dedicated exits onto MHB or wherever a smart truck driver would just bypass the United route for a faster way via Route 1 if not trafficked; the only way to do that would be to go through a series of low-capacity, curving, confusing, more expensive ramps rather than a simple connection. Thus Translink could be wasting their money by putting their bets on United.
     
     
  #2020  
Old Posted Nov 26, 2010, 9:00 AM
invisibleairwaves's Avatar
invisibleairwaves invisibleairwaves is offline
 
Join Date: Jan 2010
Posts: 638
Quote:
Originally Posted by Phusion View Post
New Westminster makes me sick. All this talk about being "disconnected" from their water front. First of all, its the muddy fraser river. Not exactly a great waterfront to begin with. Secondly, they've been "disconnected" from it for ages. Why is it that when upgrading the road along the waterfront is mentioned, they start talking about this great "disconnect"??
Indeed. You want to talk disconnect from the waterfront? How about that big ugly half-empty parkade? When New West tears that down, they'll have some credibility when they talk about their waterfront. Until then, not so much.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 12:24 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.