Originally Posted by DubberDom
The problem is that DND will eventually displace 10,000 employees who currently have transitway access to a location without effective transit access.
If the Nortel buildings would have been sold to Microsoft and they would open up a new Ottawa lab with 10,000 jobs, it would not be that much of an issue. since these would be new jobs.
|
You're kind of assuming that the vacated office space downtown will go unused. So long as it is reoccupied at roughly the same job density, there'll be no net job loss in the core.
And are all the jobs that are being moved actually downtown?
At least with the feds buying that campus, some pressure can be put on them to help fund an LRT extension further west to Bayshore or even to the campus itself. That kind of political pressure could not be so easily applied if a private sector buyer like Microsoft had bought it.
Maybe it'll even prompt us to reconsider the assumed future route of light rail west to Kanata using the Queensway from Bayshore - perhaps a route like Carling might make more sense, along with another more southerly route. We should also look into a rail bypass of downtown Ottawa to better enable employees from Orleans to get to this location.
If we could roll back time we'd be better off if the Nortel campus had never been built where it is, nor that of JDS in Nepean. There are plenty of other mistakes like these two that litter our landscape as well. But they exist now and there's not a lot that can be done about it, so wishing they didn't exist or ignoring them isn't a viable option either. Of course it would also be best if no more such developments came into being.