Old Posted Oct 18, 2010, 7:03 PM
cabotp cabotp is offline
Registered User
 
Join Date: Mar 2009
Location: Vancouver, BC
Posts: 2,813
Quote:
Originally Posted by aberdeen5698 View Post
The problem is that the entire train considered as a unit is less reliable than individual cars or car pairs, and to compensate for the poorer reliability you need to have a higher percentage of spares. So the net effect is a higher capital investment required for the fleet.

The big question is whether the percentage increase in capacity is as large as the percentage increase in fleet cost.

Another downside is that if you size the trains for peak loads then it may be uneconomical to run them at decent frequencies off-peak.
I do agree which is why translink as decided to do the 2-2 setups instead of 1 long train with the C-Car in the middle. As I said above with the 2-2 setup they can always disconnect one set from another set. Both sets are not taken out of service if one of the sets is having mechanical problems.
     
     
  #7442  
Old Posted Oct 18, 2010, 7:09 PM
Overground's Avatar
Overground Overground is offline
Registered User
 
Join Date: Apr 2005
Location: Vancouver
Posts: 904
Ya LU has always had armrests for longitudinal seating on tube stock and subsurface stock as long as I've remembered. Those Piccadilly 1973 stock were refurbed about 10 years ago btw.

If you want to see some nice trains and seating check out LU's newest S Stock used on the four subsurface lines. http://en.wikipedia.org/wiki/London_Underground_S_Stock
     
     
  #7443  
Old Posted Oct 18, 2010, 7:14 PM
mr.x's Avatar
mr.x mr.x is offline
Registered User
 
Join Date: Dec 2003
Location: Stockholm
Posts: 12,805
Quote:
Originally Posted by twoNeurons View Post
The Tube is crowded because all the tunnels are quite small diameter and circular. This means that near the doors, the train body has to be curved. If you're average height, the door can trap your hair or hat.

It means that it was cheaper to build ( smaller diameter tunnels ) but it also means that trains have much less clearance:

So...in that picture where's the emergency/maintenance walkway in the tunnel?
     
     
  #7444  
Old Posted Oct 18, 2010, 7:19 PM
WarrenC12's Avatar
WarrenC12 WarrenC12 is online now
Registered User
 
Join Date: May 2007
Location: East OV!
Posts: 24,616
Quote:
Originally Posted by mr.x View Post
So...in that picture where's the emergency/maintenance walkway in the tunnel?
Nice joke.

Go to Europe and you'll see a lot of why zwei's transit fantasies aren't reality here. The tube is cool and all, but extremely claustrophobic, nothing near accessible, and probably break every fire and safety code we have here.
     
     
  #7445  
Old Posted Oct 18, 2010, 7:21 PM
Zassk Zassk is offline
Registered User
 
Join Date: Sep 2009
Posts: 2,303
Quote:
Originally Posted by Overground View Post
Ya LU has always had armrests for longitudinal seating on tube stock and subsurface stock as long as I've remembered. Those Piccadilly 1973 stock were refurbed about 10 years ago btw.

If you want to see some nice trains and seating check out LU's newest S Stock used on the four subsurface lines. http://en.wikipedia.org/wiki/London_Underground_S_Stock
Interesting link. So an 8-car train can hold 306 sitting and 1226 standing passengers. That is about 38 seats/car and 153 standing/car. That's similar to the new MK II cars.
     
     
  #7446  
Old Posted Oct 18, 2010, 7:38 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,663
Quote:
Originally Posted by WarrenC12 View Post
Nice joke.

Go to Europe and you'll see a lot of why zwei's transit fantasies aren't reality here. The tube is cool and all, but extremely claustrophobic, nothing near accessible, and probably break every fire and safety code we have here.
There is a door on the end (that's only, what, a couple hundred feet through a crowded train) - probably also why Toronto's new subway cars have an emergency door at the nose of the articulated train.

Also, I guess the arm rests are to prevent people from sliding side-to-side into each other when the train stops and starts.
     
     
  #7447  
Old Posted Oct 18, 2010, 7:45 PM
twoNeurons twoNeurons is offline
loafing in lotusland
 
Join Date: Aug 2002
Location: Lotusland
Posts: 6,114
The original MkI had 'em too... albeit AFAIK they've never been used.
     
     
  #7448  
Old Posted Oct 18, 2010, 11:01 PM
xd_1771's Avatar
xd_1771 xd_1771 is offline
(daka_x)
 
Join Date: Aug 2010
Location: Metro Vancouver, Canada
Posts: 1,740
All the buses today have been saying "Amber alert: Tune to radio" where the route number would normally show; at least, in Surrey.
Anyone know why this is?
I've heard it was a child abduction but I doubt that this seriously could have gotten so much attention to get put on buses and get all the realtors including my own mom paged. I was thinking more of a weather thing, it does look mightily cloudy outside.
     
     
  #7449  
Old Posted Oct 18, 2010, 11:16 PM
Gordon Gordon is offline
Registered User
 
Join Date: Jul 2008
Posts: 1,065
The Amber ALert was for an abducted boy in Victoria.
     
     
  #7450  
Old Posted Oct 19, 2010, 12:41 AM
CLC CLC is offline
Registered User
 
Join Date: Apr 2008
Posts: 877
Letter to Chilliwack Progress: TramTrain a better investment
Quote:
Re: If they build it , will we ride? (Chilliwack Progress, Oct. 15). Mr. Blacklock raises some interesting points about the proposed Rail for the Valley TramTrain.

The scope of the study was technical, to see the feasibility of reinstating the previous interurban operation with modern TramTrain and the result was, the reinstating a TramTrain service was an affordable option.

Let us compare the Canada Line with the RftV basic Diesel LRT (TramTrain) option.

The Canada Line cost over $2.5 billion to date and has 90,000 boardings daily, which translates roughly to 40,000 to 45,000 actual people taking the new metro - but 35,000 or more were previous bus users now forced to transfer onto the Canada Line. Actual new ridership on the metro is less than 10,000 people.

The Rail for the Valley/Leewood Report cost for a basic Diesel/hybrid option, Scott Road to Chilliwack at $500 million or one fifth the cost of the Canada Line metro. If TransLink thinks that under 10,000 new passengers on a $2.5 billion metro is successful, as recently reported in local papers, then logic dictates that a TramTrain operation costing $500 million or one fifth the cost of the Canada Line would need under new 2,000 passengers a day to be deemed equally as successful!


All passengers on the TramTrain would be new!

As the RftV TramTrain would service several city centres and universities and colleges along its route, initial ridership is anticipated to be triple or quadruple, the 2,000 new passengers a day figure.

As for bus rapid transit or BRT, the question is, where has it worked? To be truly rapid, BRT must have expensive exclusive rights-of-ways to operate, thus driving up the costs considerably.

Ottawa is a good example. After building BRT instead of LRT in the mid-80’s, which cost more than originally planned for light rail, ridership on the BRT and regular bus lines fell 15.7% from 1986 to 1999!

Today, Ottawa operate a TramTrain line and instead of investing in further BRT, the city is now building with modern light rail!

Malcolm Johnston

Light Rail Committee

Rail for the Valley
My brain is too tired to judge if the red highlighted part is logical.
     
     
  #7451  
Old Posted Oct 19, 2010, 12:53 AM
jlousa's Avatar
jlousa jlousa is offline
Ferris Wheel Hater
 
Join Date: Jun 2006
Posts: 8,371
This is what a $54 Property tax would get us, Translink has not written it off quite yet, contrary to what the mayors want. The below list says alot about what Translinks views as acceptable for Surrey, meaning that an extension of the M-Line along Broadway doesn't need to be as far off as recently imagined.

Quote:
The Evergreen SkyTrain Line (between Lougheed Town Centre and Coquitlam Town Centre.

Phase 1 of the North Fraser Perimeter Road (connecting United Boulevard in Coquitlam to Brunette Avenue in New Westminster)

Increasing the capacity and updating the Main Street, Metrotown, Surrey Central, and New Westminster SkyTrain stations to accommodate more passengers and make it easier to use the stations.

Introducing new bus rapid transit services South of the Fraser:
on King George Boulevard, connecting Surrey Central to White Rock
On 104th, connecting Guildford to Surrey Central
On Highway 1, connecting Lougheed Town Centre to Surrey Central and Walnut Grove.

Increasing bus service around the region to improve reliability and reduce crowding and serve new demand from population growth and the expanded student U-Pass program.

Introducing a local bus service connecting White Rock Centre to Langley City Centre.

Upgrading the Lonsdale Quay bus exchange to improve safety and the passenger environment.

Restore funding to the Major Road Network from $10 million to $20 million per year.

Restore funding to the cycling program from $3 million to $6 million per year
     
     
  #7452  
Old Posted Oct 19, 2010, 2:19 AM
Mac Write Mac Write is offline
Registered User
 
Join Date: Dec 2008
Posts: 1,423
That's it for $54? How about Skytrain expansion in Surrey and Vancouver, new buses, new Seabuses, more Mark II Skytrain cars, more Roden cars?
     
     
  #7453  
Old Posted Oct 19, 2010, 3:34 AM
SpongeG's Avatar
SpongeG SpongeG is offline
Registered User
 
Join Date: Jun 2006
Location: Coquitlam
Posts: 40,048
Quote:
Originally Posted by officedweller View Post
There is a door on the end (that's only, what, a couple hundred feet through a crowded train) - probably also why Toronto's new subway cars have an emergency door at the nose of the articulated train.

Also, I guess the arm rests are to prevent people from sliding side-to-side into each other when the train stops and starts.
yah gawd it can stop suddenly! me and my luggage were having fun the one trip - you definately have to hold on

some of the newer lines are much more spacious - i kind like the piccadily line though its always an adventure - you see all walks of life using the tube and they all stand or sit whatever they can
__________________
belowitall
     
     
  #7454  
Old Posted Oct 19, 2010, 3:46 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,663
What I don't understand is the velour seat cushions...
     
     
  #7455  
Old Posted Oct 19, 2010, 3:54 AM
SFUVancouver's Avatar
SFUVancouver SFUVancouver is offline
Registered User
 
Join Date: Dec 2006
Location: Hamilton
Posts: 6,694
The $56 quoted by Translink works out to the average household shouldering an additional 15 cents a day in exchange for a new SkyTrain line, B-Line services south of the Fraser, a whole whack more bus service for students, and capacity upgrades for the region's busiest SkyTrain stations, of which all but one are outside the City of Vancouver. That's an incredible bargain and I said so at the Translink Transportation Fair this weekend and via the online Translink Listens survey.

While at the Translink event I asked one of the more senior people what the plan was for naming the VCC-Clarke to Lougheed section of the SkyTrain network after the Evergreen Line opens. He said the working plan is to rebrand that entire section to Evergreen Line and restrict the Millennium Line brand to the Lougheed to Waterfront via Columbia route.
__________________
VANCOUVER | Beautiful, Multicultural | Canada's Pacific Metropolis
     
     
  #7456  
Old Posted Oct 19, 2010, 5:55 AM
hollywoodnorth's Avatar
hollywoodnorth hollywoodnorth is offline
Registered User
 
Join Date: Oct 2001
Location: Downtown Vancouver
Posts: 6,394
http://www.canada.com/chilliwacktimes/news/story.html?id=426a7f6c-6d9b-4723-ac44-616102fa46e3

is the above link a story that features a photo of Malcolm Johnston??

I realllly want to know what this nutter looks like
__________________
Quote of the Decade on SSP: "what happens would it be?" - argon007

"orange vested guy" - towerguy3
     
     
  #7457  
Old Posted Oct 19, 2010, 5:59 AM
Metro-One's Avatar
Metro-One Metro-One is offline
Registered User
 
Join Date: Sep 2008
Location: Japan
Posts: 17,952
We already know what he looks like......



hehe
__________________
Bridging the Gap
Check out my Flickr: https://www.flickr.com/photos/30634635@N03/with/29495547810/ and Youtube channel https://www.youtube.com/channel/UCV0_0h9qKlhxXFxuAey_q6Q
     
     
  #7458  
Old Posted Oct 19, 2010, 8:31 AM
cabotp cabotp is offline
Registered User
 
Join Date: Mar 2009
Location: Vancouver, BC
Posts: 2,813
Quote:
Originally Posted by CLC View Post
Letter to Chilliwack Progress: TramTrain a better investment


My brain is too tired to judge if the red highlighted part is logical.

The numbers are made up. Malcolm is trying to say since is nice tram train would only cost 1/5th the cost of the Canada Line. And since he comes up with the idea that the Canada Line as only 10,000 new riders and it is a success. That his new line to Chilliwack should only need 2,000 riders and be considered a success.

Of course he is twisting things around. The success of the Canada line isn't how many new people it has attracted. It is the fact that it has already broken the 2013 100,000 for being break even.
     
     
  #7459  
Old Posted Oct 19, 2010, 8:45 AM
eduardo88 eduardo88 is offline
BANNED
 
Join Date: May 2006
Location: Berlin + Madrid
Posts: 1,024
Quote:
Originally Posted by SFUVancouver View Post
The $56 quoted by Translink works out to the average household shouldering an additional 15 cents a day in exchange for a new SkyTrain line, B-Line services south of the Fraser, a whole whack more bus service for students, and capacity upgrades for the region's busiest SkyTrain stations, of which all but one are outside the City of Vancouver. That's an incredible bargain and I said so at the Translink Transportation Fair this weekend and via the online Translink Listens survey.

While at the Translink event I asked one of the more senior people what the plan was for naming the VCC-Clarke to Lougheed section of the SkyTrain network after the Evergreen Line opens. He said the working plan is to rebrand that entire section to Evergreen Line and restrict the Millennium Line brand to the Lougheed to Waterfront via Columbia route.
So a Millennium Line train running westbound past Lougheed would automatically become an Evergreen Line train? Or would they just terminate at Lougheed?
     
     
  #7460  
Old Posted Oct 19, 2010, 11:00 AM
nname nname is offline
Registered User
 
Join Date: Aug 2005
Posts: 5,081
Quote:
Originally Posted by cabotp View Post
The numbers are made up. Malcolm is trying to say since is nice tram train would only cost 1/5th the cost of the Canada Line. And since he comes up with the idea that the Canada Line as only 10,000 new riders and it is a success. That his new line to Chilliwack should only need 2,000 riders and be considered a success.
hmm... according to his logic, I can buy a community shuttle bus for 1/20000th of the cost and run it to Chilliwack. If it gets a rider every second day while running empty all other times, it would also be a success, right?
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 3:53 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.