Quote:
Originally Posted by Buckey
I can live with that number also for a 3 night stay. I think it is a bit on the high side but sure hotel is $500 for three nights and $120 for a taxi - some meals included in convention costs but one way or another they are paying for 6 or 8 meals at 30 a pop $300 regardless - BOOOZEEE add $100. cost of convention - some are free but if so then exhibitors paying. $1,600 - No issue with that number as long as we really know how many from away and how many local but I do think they break that out and capture that before they calculate their spin off effects
|
Wow I go away for 2 nights to party and 4 pages of posts - wow. First of all guys; we're getting heated here and slamming each other. Now; all together...deep breath in....and out. There much better...
The $1,600 cost is actually pretty accurate. I've checked on taking the cheap hotel route and then an average hotel and then expensive. This is what my analysis came up with:
Assuming I were to fly from Calgary to Halifax for a conference March 6 to 9 (pretty typical conference timing with registration on Sunday, conference start Monday and ending Wednesday), the airfare would be:
Air Canada = $806.79 (tango fare with seat selection)
Westjet = $671.34 (standard fare)
I should note - I used the lowest fare I could find at the time I input Calgary to Halifax.
Now, looking at hotels - I tried to go for three ranges: Cheap (Day's inn in Dartmouth), Average (Radisson Hollis Street) and Expensive (Westin Halifax).
Taking the cheapest hotel room for each, 3 nights was:
Days Inn = $306.09
Radisson = $413.97
Westin = $665.09
So for me; I'd be kewl with either the Westin or Radisson (just my personal preference) and I like Air Canada over Westjet. So for me, without meals a conference trip would be $1220.76 or $1471.88 before meals. Each person's taste will be different and prices will change as seats are bought up (in case anyone wonders why the cheap seats go fast - usually the seat sale fares might only have 8 to 10 seats per flight option, thus once gone - price goes up). So there is potential for some people to spend less than the $1,600 if they book early and get good hotel/flight deals. Just as those who would not get approval until say a month before the conference - would probably spend more and last minute people even more than that.
I don't have a problem with the conference centre being underground. My only problem - no, not problem more like issue is that with all the outcry about the citadell being so important and the city having a "Halifax" feel - I don't know how this design accomplishes that idea. My concern with the process relating to input to design is that this is being done ass backwards. If the public is being asked the question of how the design could be changed (if at all) to make this a great development - it should've been done a while ago. Rank should've come out with the design (which they did) but then as the process moved forward - asked for input before the Province committed. I'm concerned that any major changes will impact the $.
I'm not going to debate the money issue - I don't understand it and I never will; I'm a planner not an economist. But; as I've said before - if the fort is such a major influence in the city then perhaps it should be used as a means to design the building to reflect or compliment the fort and any major adjacent heritage buildings. That can be done in a number of ways and I wonder if the elements in the elevations fenwick posted (on the Argyle side) will be concrete or some material similar to the fort?
As for Lydon Linch commenting on the design - my comment would be put your money where your mouth is. If you are so concerned with the design - come up with a new one that still would meet the cost committments made to the NS government and still achieve good design.
For me; if I was asked in a say question on a referendum (or somethign along that line) if I was in favour of this design (not whether it should be built because I'm firmly in the yes column for that) - I'd have to vote no. From what I can see; the design doesn't work very well on argyle and repeats a major issue with the existing WTCC - no commercial/retail space on Argyle street. If any street should be 'sacrificed' for the sake of the design, it should be Market - in the same block its just the backs of residential buildings or parking lots.
I'm also concerned that this project requires HRM to make a committment on purchasing the old WTCC - something which financially could influence their operations in the future. But, I don't understand the economics so I will only say I'm concerned.
I hope the project moves forward - I totally agree with everyone who have said this 'can't do' attitude needs to go away. My main concern is to get the best building and best deal and from reading the economic posts; I'm reasonably sure that it should be okay from that perspective. It's now just about a good design.