HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Atlantic Provinces


Reply

 
Thread Tools Display Modes
     
     
  #601  
Old Posted Sep 3, 2010, 12:37 PM
pei guy pei guy is offline
Registered User
 
Join Date: Nov 2009
Location: Montague, PE
Posts: 269
Quote:
Originally Posted by braymondg View Post
I hate IRAC!
Who doesn't!
Reply With Quote
     
     
  #602  
Old Posted Sep 8, 2010, 3:34 AM
Dmajackson's Avatar
Dmajackson Dmajackson is offline
Moderator
 
Join Date: Feb 2008
Location: B3K Halifax, NS
Posts: 9,979
Hey so I'm trying to update my list. I know the Fitzroy is still underway in Charr'town but what is currently the tallest underway in Summerside?
Reply With Quote
     
     
  #603  
Old Posted Sep 8, 2010, 9:01 PM
pei guy pei guy is offline
Registered User
 
Join Date: Nov 2009
Location: Montague, PE
Posts: 269

The tallest underway in Ch'town is actually the Holman's Grand Hotel at 10 stories / 127.6 feet. As for Summerside I'm not sure... it would be an apartment / condo of some sort. If you check back later, we'll try to find out.

Reply With Quote
     
     
  #604  
Old Posted Sep 8, 2010, 9:12 PM
pei guy pei guy is offline
Registered User
 
Join Date: Nov 2009
Location: Montague, PE
Posts: 269
Roundabout prompts temporary detour
Published on September 8th, 2010
Eric McCarthy

Traffic was being diverted around the O’Leary Corner intersection on Tuesday as construction of a roundabout to replace the intersection shifts into high gear.

A Department of Transportation spokesman said traffic would be diverted around the construction site when flaggers are present and flow through the construction site when work is not being carried out.

The project, now in its second week, is expected to take six to eight weeks to complete, weather dependent.

--------------------------------------------------------------------------

The Montague roundabout started on the same day that school started, which was smart considering 99% of students have to use that intersection to get to school.
Anyway, I'm looking forward to these newer, more rural roundabouts. I hope they make them nice!
Reply With Quote
     
     
  #605  
Old Posted Sep 8, 2010, 9:17 PM
pei guy pei guy is offline
Registered User
 
Join Date: Nov 2009
Location: Montague, PE
Posts: 269
Fiery debate sparked by apartment construction near chemical plant
Published on September 8th, 2010
Dave Stewart

The president and CEO of BioVectra says allowing an apartment building to go up 83 feet away from a chemical plant is like building a prison for pedophiles next to an elementary school.

Ron Keefe gave passionate testimony this morning at the Island Regulatory and Appeals Commission hearing into BioVectra’s appeal of an apartment building currently under construction next to the chemical plant.

Under cross examination from Matt Bradley, counsel for Paramount Construction, the developer responsible for the 18-unit apartment building, Keefe blasted the City of Charlottetown for not doing research into whether it was safe to build so close to the plant.

“When they go to the wakes of people dying (if there is an accident), people are going to say ‘are you kidding me, why would you allow them to build 80 feet from a chemical plant’,’’ Keefe said. “We tried to tell them (it was too close) and they wouldn’t listen.’’

Keefe said it won’t come back to haunt BioVectra, a chemical plant that has been there since 1970 (formerly known as Diagnostic Chemicals Ltd.), it will fall on the city.

Keefe said the plant operates on the strictest of safety standards but nothing is 100 per cent certain — there are no guarantees.

Keefe said there are also plans to build more apartment buildings, one 50 feet away from the plant.

The City of Charlottetown approved the project because the land is zoned for apartment buildings. The city felt the development met all the guidelines, according to testimony given this morning, including national fire safety guidelines and that it had no choice, and no evidence that there was any risk, but to issue a building permit.

Bradley also revealed in the hearing this morning that Scott Linkletter, who owned the adjacent property in question, approached BioVectra about purchasing the property.

Keefe said Linkletter did approach the chemical manufacturing company.

“If you are so concerned about safety why not acquire the property and control what it's used for?’’ Bradley asked Keefe.

The president and CEO of BioVectra said the company could have and perhaps should have bought the property itself.

“We have no use for the property,’’ Keefe said, “and I’m not sure what our financial circumstances were at the time (the property was offered to us).’’

Keefe then went on to say that he didn’t see the relevance of the question.

“The fact is I never would have dreamt someone would build an apartment building there.’’

The hearing continues this afternoon.

Reply With Quote
     
     
  #606  
Old Posted Sep 11, 2010, 11:16 AM
pei guy pei guy is offline
Registered User
 
Join Date: Nov 2009
Location: Montague, PE
Posts: 269
Housing starts higher in Summerside
Published on September 10th, 2010
Staff ~ The Journal Pioneer

SUMMERSIDE – Residential construction in Summerside increased last month compared to August 2009. However, according to figures released Thursday by Canada Mortgage and Housing Corporation (CMHC), overall home construction in urban centres of the province decreased last month, but so far this year urban starts are up over last year.

Preliminary data indicates a total of 74 units were started in August 2010 compared to 94 units for the same period last year in urban centres throughout P.E.I.

"Similar to July, the number of housing starts in Charlottetown was down, while Summerside experienced an increase," said Ralph Freeze, market analyst with CMHC in Prince Edward Island. "Both single-detached starts and multiple unit construction were lower in the capital region of Charlottetown. Summerside reported slightly more starts for both single and multiple unit construction in August.

“On a year-to-date basis, urban starts are 4.3 per cent ahead of last year's pace. The gap between this year and last year is narrowing as the year progresses," said Freeze.

In urban centres across Canada, total housing starts recorded in August were up 12 per cent to 14,253 units compared to last year's total of 12,734. Single-detached starts were up 10 per cent, while multiple starts were up 14 per cent to 8,130 units this year. In the Atlantic region, 847 new units were started in August 2010 compared to 907 units during the same period in 2009.

Reply With Quote
     
     
  #607  
Old Posted Sep 11, 2010, 11:21 AM
pei guy pei guy is offline
Registered User
 
Join Date: Nov 2009
Location: Montague, PE
Posts: 269
Atlantic Junior B hockey championship to be played in Montague in 2011
Thu, 09/09/2010

The 2011 Don Johnson Cup Junior B Hockey Championship will be played at the Cavendish Farms Wellness Centre in Montague and hosted by the Down East Auto and Marine Maniacs. The announcement is slated for Monday at the Wellness Centre.
The Don Johnson Cup is the top Junior B championship event for the Atlantic Provinces, with the top team from each of the four provincial Junior B leagues, as well as the host team, taking part.
Island Junior Hockey League champions the Kensington Vipers were among the five teams who participated in the 2010 event in St Margaret’s, Nova Scotia. The Cumberland County Blues won the final game.

Reply With Quote
     
     
  #608  
Old Posted Sep 14, 2010, 8:57 PM
pei guy pei guy is offline
Registered User
 
Join Date: Nov 2009
Location: Montague, PE
Posts: 269
Street closures, delays occurring around Charlottetown this week
Published on September 14th, 2010

Grafton Street in downtown Charlottetown will be closed from Wednesday to Friday.

The closure, from University Avenue to Queen Street, is so crews can take down and move the crane being used for the hotel construction above the Confederation Court Mall.

The street will be reopened late Friday.

As well, the city will be paving Mt. Edward Road from Belvedere Avenue to Palmer Road on Wednesday, weather permitting.

Today, two areas of the city are experiencing traffic delays.

Westview Drive, between North River Road and Atlantic Road is closed today for water and sewer work. And Belvedere Avenue, from the Farmers' Market to Mt. Edward Road is closed for paving.

All street closures in Charlottetown are posted to the city's website. Click here.
Reply With Quote
     
     
  #609  
Old Posted Sep 15, 2010, 10:21 PM
pei guy pei guy is offline
Registered User
 
Join Date: Nov 2009
Location: Montague, PE
Posts: 269
Montague high school opens
Published on September 15th, 2010
Steve Sharratt

MONTAGUE – A mighty oak was planted and a mighty song was sung as the official opening of the new $20-million Montague Regional High School was held here this morning.

“It’s just a remarkable addition to the whole community and region,’’ said Mayor Richard Collins as he toured the building with throngs of officials and lucky students who will eventually become the first graduates of the institution.

A state-of-the-art building, principal Seana Evans-Renaud praised the details paid to the new facility that features everything from a recording studio for the music program to the best equipment for the trades programs.

“It’s a prime example of how government and the community can work together to find the best solution for everyone,” said Premier Robert Ghiz.

The new 108,000 square-foot facility provides for 635 students.

“This building is a tremendous new learning space for students in south eastern P.E.I.,” said Education and Early Childhood Development Minister Doug Currie.

During the grand opening events, politicians and the principal conducted a ribbon cutting and tree planting ceremony of an Island oak. Inside the auditorium, singer Brielle Ansems offered up her own mighty song about the new school written for the occasion.

The facility is considered to be one of the most advanced in the region. A model for trades with state-of-the-art career and technical education training facilities, including a modern culinary arts lab and welding and carpentry facilities. The new cafeteria/auditorium has lighting and sound systems that will allow for “theatre” productions in the cafeteria, large music rooms that allow for more practice area as well as a sound studio. It boasts a robotics lab, modern science and technology labs and has integrated a greater capacity to access and use technology throughout the school.

Reply With Quote
     
     
  #610  
Old Posted Sep 15, 2010, 10:29 PM
pei guy pei guy is offline
Registered User
 
Join Date: Nov 2009
Location: Montague, PE
Posts: 269
Province pays private parties $24,000 for land to build Montague roundabout
Wed, 09/15/2010
By Jonathan Charlton


The province has started construction of the Montague roundabout without actually owning all the land it’s being built on.
Hillcrest United Church, Town and Country Aquatics Plus Coop which owns the Atlantic Fitness East building, Montague Pentecostal Assembly and developer Ian Smith have entered into purchase sale agreements with the province for a total of just over a quarter of an acre for about $24,000, Department of Transportation and Infrastructure renewal spokesman Andrew Sprague said. This figure is included in the $1.1 million cost quoted by Minister of Transportation Ron MacKinley.
Each of these parties owns a corner at the intersection where the roundabout is being built.
The actual ownership of the land won’t transfer to the province until after a post-construction survey which will take about three months.This procedure is common in construction projects, he said.
"We’ll do the purchase sale agreement with the property owner based on the designs for the project. They’ll agree, then we’ll proceed with the project. Then we’ll do a survey after the construction of the project to get the actual mathematical square footage taken and if there’s any need for changes to the sale agreement. At that point that’s when they’re made."
Very rarely is more land taken than was planned and there haven’t been any disagreements between landowners and the province in the past between the time of the purchase agreements and the final sales.
There will be an additional cost of paving the Hillcrest United Church parking lot which the government has used for a number of years for commercial vehicle testing, which brings the total land acquisition cost to about $80,000.
The negotiation of the agreements started in the spring. Randy Angus, chair of TCAP Coop which owns the Atlantic Fitness East building, said their agreement was finalized last week. The province has agreed to pay $6,200 for a section of land plus $200 for each of the 15 trees that had to be cut down.
Mr Angus said the coop worked with the province to determine a fair market value for the land by looking at the value of similar properties.
The Montague Pentecostal Assembly church has agreed to about $5,000 for its land, former chair of the steering committee Tom Schultz said.
Elizabeth Boehner, secretary of the stewards for Hillcrest United Church, said while the process was time intensive the church was happy with its deal.
Mr Smith said he didn’t anticipate any problems finalizing the sale.
Reply With Quote
     
     
  #611  
Old Posted Sep 17, 2010, 10:53 PM
pei guy pei guy is offline
Registered User
 
Join Date: Nov 2009
Location: Montague, PE
Posts: 269
The old Cox & Palmer building (very ugly) has finally been demolished in downtown Montague! The area is currently being paved and I heard they will be putting a mural in on the side of Scotiabank.

Montague is crazy busy with development right now. There is the new parking area, new pavement and streetlights being installed in front of the new Cox & Palmer building, the roundabout is going strong, new high school open, and Canadian Tire just renewed their building permit, which was in the Guardian but not on their website. This is almost a guarantee that they will be building next year.

I'm very happy to see my hometown growing like this. Just thinking of the boost CT (and Mark's Work Wearhouse) would bring makes me grin! I figured this would be a good time for a little compilation of the projects in Montague area.

Current, Recent and Upcoming Projects:
-Montague Regional High School
-Scotiabank parking area
-Cox & Palmer / dental office
-Department of Fisheries, Aquaculture and Rural Development
-Wood Islands Rd / Valleyfield Rd roundabout
-Montague Consolidated park and playground
-Montague Intermediate music room / industrial arts wing
-Canadian Tire / Mark's Work Wearhouse
-many duplexes / apartments
-new subdivision

It's no Charlottetown, but this is quite an impressive list of projects for a town of 2,000!

Reply With Quote
     
     
  #612  
Old Posted Sep 24, 2010, 1:01 AM
pei guy pei guy is offline
Registered User
 
Join Date: Nov 2009
Location: Montague, PE
Posts: 269
Homburg Financial Tower officially opens tonight
Published on September 23rd, 2010

The sound of bagpipes will flow through the streets of downtown Charlottetown as a kilted bagpiper, perched on the fourth-storey balcony of Homburg Financial Tower, greets guests to the building’s official opening tonight.

The Homburg Financial Tower, located at 98 Fitzroy St., is the latest addition to the business landscape of downtown Charlottetown and is also the new home of two companies, including the Prince Edward Island branch of the financial services firm Richardson GMP Limited.

Peter MacDougald of Richardson GMP said the company feels fortunate to be one of the first tenants of the Homburg Financial Tower.

“We at Richardson GMP are quite pleased with our new location in the Homburg Financial Tower,” he said.

“The building offers good access to parking and a comfortable atmosphere for our clients and employees, with wonderful views of Charlottetown particularly from the top floors. As in all our locations across Canada, we like to be at centre ice.”

By mid-October, the main

level will open its doors to

Moving Designz, a unique

store specializing in modern furniture and home and cottage

décor and accessories.

Susan Snow, owner and property stylist, decided to move her business from Summerside to Charlottetown in order to expand and reach a larger market. She said being located in the Homburg Financial Tower will be a positive move for the company, particularly in terms of the location in the city’s downtown.

“Opening a store in Charlottetown has always been part of Moving Designz’ long-term business growth plan,” she said.

“We are very pleased to be moving to the main floor of the building, especially with its direct connection to the Queen Street Parkade. We have been getting nothing but positive comments and encouragement from our customers and clients regarding our new location and our move here to the Homburg Financial Tower.”

To date, several other local and off-Island businesses have expressed interest in being part of the Homburg Financial Tower.

Michael Arnold, vice-chairman for Homburg Canada Reit, described it as an exciting time ahead.

“The opportunities here are great and we want to share in the future of Charlottetown.”

The open house begins at 5 p.m.

Reply With Quote
     
     
  #613  
Old Posted Sep 24, 2010, 1:09 AM
Dmajackson's Avatar
Dmajackson Dmajackson is offline
Moderator
 
Join Date: Feb 2008
Location: B3K Halifax, NS
Posts: 9,979
You know you're in the Maritimes when there's a bagpiper welcoming you to a 8-storey "tower" that is going to become the home of a cottage design shop ...
Reply With Quote
     
     
  #614  
Old Posted Sep 24, 2010, 12:16 PM
braymondg braymondg is offline
Registered User
 
Join Date: Jan 2009
Location: Charlottetown
Posts: 496
Construction begins on UPEI School of Nursing




Published on September 23rd, 2010
The Guardian


When Margaret Monro became UPEI’s dean of nursing in 1992, it signaled a change for P.E.I.’s education and health sectors.

Until that fall, the province was the only one in Canada not offering a program for a nursing degree.

Although the P.E.I. School of Nursing ran a two-year diploma program, as health care grew more demanding through the late 1980s it was obvious those entering the field would soon need a more indepth education.

“The diploma program schools really were designed to prepare nurses for in-hospital acute care but there wasn’t any experience in community or long-term care. It was decided that having two levels of education that look parallel but aren’t sent mixed messages,” said Monro.

When the Canadian Nursing Association said they’d eventually only accept degree-educated individuals, the decision was made and in 1994, two years after the UPEI School of Nursing opened its doors, the P.E.I. School of Nursing graduated its last class.

Big changes still continue in the link between health and education on P.E.I., with construction of the new UPEI School of Nursing building announced on Tuesday.

The new space will house the School of Nursing plus the new Department of Family and Nutritional Sciences.

It will also allow the university to offer a new master of nursing program and accelerated learning class, says UPEI president Wade MacLauchlan.

“Now we can give our students an even brighter future,” he said. “This will be an important platform to address our future health care needs and opportunities.”

The expansion reflects the growth of one of UPEI’s fastest growing departments, said Dean of Nursing Kim Critchley.

When the School of Nursing started in 1992, about 18 students enlisted, she said.

Today, the school accepts about 60 new students every year.

“One reason is the good support from the provincial government’s sponsorship program but the big reason is guaranteed employment for two years after graduation. Until that came in place we used to lose half of our graduates to elsewhere but now most stay,” said Critchley.

The provincial government is funding two thirds of the construction, $7.2 million, while UPEI will raise the other third, $3.6 million, for a total ost of $10.8 million.

Expecting construction to be completed by fall 2011, UPEI is looking at options of what to do with the old nursing building, where Monro developed the program that graduated the province’s first degree-educated nurses.

Reply With Quote
     
     
  #615  
Old Posted Sep 25, 2010, 4:11 PM
pei guy pei guy is offline
Registered User
 
Join Date: Nov 2009
Location: Montague, PE
Posts: 269

That's great news for UPEI! It looks like a pretty nice building.
Quote:
Originally Posted by Dmajackson View Post
You know you're in the Maritimes when there's a bagpiper welcoming you to a 8-storey "tower" that is going to become the home of a cottage design shop ...
Reply With Quote
     
     
  #616  
Old Posted Sep 29, 2010, 12:25 PM
billy1 billy1 is offline
Registered User
 
Join Date: Feb 2004
Location: Charlottetown
Posts: 501
Anyone know what is being built by the Tim Hortons on St. Peters Rd by the old Scotiabank location? They have fencing up and it looks like they will be leveling the old Scotiabank building.
Reply With Quote
     
     
  #617  
Old Posted Sep 30, 2010, 11:12 PM
pei guy pei guy is offline
Registered User
 
Join Date: Nov 2009
Location: Montague, PE
Posts: 269


Not sure. Judging by the location, probably retail of some sort.
Reply With Quote
     
     
  #618  
Old Posted Oct 1, 2010, 7:21 PM
braymondg braymondg is offline
Registered User
 
Join Date: Jan 2009
Location: Charlottetown
Posts: 496
The Scotia Bank is being leveled to make way for a new Tim's and maybe a Wendys. DP Murphy Group bought the property.
Reply With Quote
     
     
  #619  
Old Posted Oct 8, 2010, 8:11 PM
pei guy pei guy is offline
Registered User
 
Join Date: Nov 2009
Location: Montague, PE
Posts: 269
Georgetown council calls for roundabout at Pooles Corner
By David MacDonald

Georgetown councillor Ronnie Gallant says it’s time the province constructed a roundabout in Pooles Corner to deal with what he says is a dangerous intersection.
Coun Gallant expressed his views during a recent council meeting, asking other councillors to support a motion to send a letter to Transportation Minister Ron MacKinley.
Coun Gallant said there have been several fatal accidents at that intersection in the past few years, and there are other safety concerns such as large trucks and vehicles speeding on the Route 4 portion of the intersection. The posted speed limit is 60 km/h.
"We’ve got to get something started. It’s a bad corner and everybody knows it," Coun Gallant said. "It would be simple to make it there. Of all places, (a roundabout) should be there; we have the room to do it."
Councillor Allan Gallant suggested an overpass with off ramps, but in any case, the traffic volume is definitely there for something to be done.
Mayor Lewis Lavandier said a roundabout would be a good idea if it’s feasible.
"This being the year of the roundabout, this would be the time to do it," he said.
Council voted 5-0 to send a letter to Mr MacKinley.
There have been a number of serious accidents at the intersection, including a 2008 accident that claimed the lives of two males who attended the Holland College Georgetown Centre. According to Montague RCMP, two accidents took place there since January 2010, with the most recent one a two-vehicle crash on September 21 when a 61-year-old male visiting from Japan was seriously injured.

Reply With Quote
     
     
  #620  
Old Posted Oct 9, 2010, 12:05 AM
josh_cat_eyes's Avatar
josh_cat_eyes josh_cat_eyes is offline
Registered User
 
Join Date: May 2009
Location: Moncton NB
Posts: 2,763
Tallest building in summerside is like 4 stories. It is an appartment building near the old prince county hospital. I have been away for a while and have not been able to get online often.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Atlantic Provinces
Forum Jump



Forum Jump


All times are GMT. The time now is 9:58 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.