Quote:
Originally Posted by BCPhil
The St Clair project is a valid comparison to LRT on Broadway. Both roads share common features and constraints. Both roads are of a similar fixed width, pass through built up business districts, and cross many other major roads. And both projects share similar design goals (segregated but on street operation). It's more valid to compare Broadway to St Claire than some tram project in Europe where it's built on mostly old rail ROW or large grassy medians on wide boulevards or countryside tramtrain.
|
No, it is not a valid comparison. This is exactly why the problem I am talking about. It's obvious you do not know much about the problems that occurred on St. Clair. Unfortunately, the media, and pro-auto groups succeeded in labeling the project an LRT project, when it really was a project to rebuild the road, and the existing streetcar tracks. Before the project, St. Clair Avenue was very wide for a downtown avenue. A ROW used to exist before it was taken out in the late '30s
Not one mention was made of the pro-auto lobby group that succeeded in stopping the project for a year because they wanted parking on the streets(a city decision, not TTC), very little was discussed about the involvement of multiple city agencies with no clear leadership on the project. A poor design process, that lead to construction during the winter. The only similarity that I can see where there will be a debate is road space allocation, but from what I understand there is enough space on Broadway for a ROW. That is where we had the debate on St. Clair, and really had little to do with the ROW. Sadly, the city caved into the demands of auto users on that one, and now there is still allowed on street-parking. The Streetcar zips by slow moving traffic.
None of this has anything to do with the choice of technology. These sort of cock-ups can occur on ANY project, and I know Mezzanie, and you know this. It's unfair to try to say LRT(or Skytrain) will suffer the same problems because one project was a total screw-up. If I was really a jerk, I would compare the skytrain to our Scarborough RT here in Toronto. The line has been a disaster from the start.
Quote:
|
While it's not a 100% guaranteed outcome, it is one of the most closely matched projects happening in the world to Broadway, and much more valid a comparison than comparing Broadway to the average statistics (or in Zwei's case, comparing it to the BEST case possible statistics).
|
The road project has been complete for a while now, and I highly doubt it's that closely watched, unless LRT opponents are using it as a means to sway opinion. The sad thing is, it's not even LRT. It's a streetcar in a simple ROW. The fact is, people are solely focusing on the ROW portion of the project while ignoring the hydro portion, the road rebuilding portion, and the beautification portion.
I do not want to debate the St. Clair project here, I do have to defend Zwei a little bit. He can be abrasive, but he obviously cares about transit, and from what I read, you cannot deny Skytrain technology is pretty damn expensive, and is not really going to help that part of the region. Why not look at other options. Why only look at Skytrain technology, especially when it seems Translink is having trouble getting funds for one line? I read that report, and it's a pretty good assessment of what can be done to bring transit at a reasonable price.