HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure


Closed Thread

 
Thread Tools Display Modes
     
     
  #7141  
Old Posted Sep 21, 2010, 6:23 PM
nname nname is offline
Registered User
 
Join Date: Aug 2005
Posts: 5,099
Quote:
40% ballasted track replacement, [including new rail, ties & ballast] plus sub-grade & drainage upgrading, to permit higher speeds.
And.. in the report, it says that cost about 65k per km, or $65 per meter... for all the ties, rails, ballasts, labours, etc... I really have a hard time believe in this. Can you buy one meter of rail for $65 here? Or rather, can you even buy one meter of steel plate/rod for $65 here?
     
     
  #7142  
Old Posted Sep 21, 2010, 6:55 PM
Zassk Zassk is offline
Registered User
 
Join Date: Sep 2009
Posts: 2,303


I really question the choice of this route. Yes, there is an existing track already present, but the report already admits that there is little ridership between Langley and Abbotsford. So why anyone would advocate extending a rail line past Langley is beyond me. On the other hand, Abbotsford is only 7 km away from the terminus of the existing WCE. Why not spend however many million to build WCE capacity from Mission to Abbotsford instead? Even if it cost $500 million, you would come out far ahead of this interurban proposal.

WCE would get Abbotsford people directly to downtown Vancouver. And if they need a transfer to SkyTrain, WCE would provide a shorter and faster route to SkyTrain than the proposed interurban route to Scott Road. If we spend the kind of money quoted in this interurban propsal, surely we can use that to renegotiate the WCE capacity from its current 10 trips/day, and extend it to Abbotsford.

Fundamentally, the "study" does nothing to justify the existence of this route. It provides no ridership estimates or justifications for each leg of the route, and no study into whether alternate alignments would produce superior service or ridership. And that leads to my last criticism - there is no justification offered for the inclusion of Chilliwack in the proposal. Extending the service to Chilliwack nearly doubles its length, and whom will it serve? Are residents of Chilliwack really demanding slow but frequent service into Metro Vancouver? How many Chilliwack residents will ride 90 mins to/from Surrey, or 125 minutes to/from Vancouver, or 150 minutes to/from Richmond? I would like to see the business case for that.
     
     
  #7143  
Old Posted Sep 21, 2010, 7:03 PM
SFUVancouver's Avatar
SFUVancouver SFUVancouver is offline
Registered User
 
Join Date: Dec 2006
Location: Hamilton
Posts: 6,714
Section 19.1 Exclusions and Contingencies contains a pretty important exclusion when it comes to the viability of a transit line: operating costs.

"$5 million per kilometre for LRT" will become a familiar line from Malcom Johnston/zweisystem in the months ahead. That is what the report quotes as the cost of upgrading the existing single track SRY railway to single track DMU tram-train service. ($6.2 million for an electrified line) That includes modifying and upgrading 19 bridges and 89 at-grade crossings.

I am genuinely confused about how the line would get from Scott Road to "Vancouver Central" train station. Appendix J vaguely describes the line as going first into Richmond (at a cost of $11.7 million dollars per km) and then on to "Vancouver Central", at grade the whole way, at a cost of $13.7 million dollars per km. I simply cannot imagine how an at-grade LRT system could be built from Richmond to "Vancouver Central" station for less than $14 million dollars. Would it get its own bridge over the north arm of the Fraser? Would it run in a city street? Would it terminate at Pacific Central Station?

Anyway, the report covers the background information well and in this regard it compares pretty well with other transportation studies I have read, however it entirely excludes an explanation of how the costs that are factored into its cost estimates were arrived at and there are no ridership projections at all, nor discussion of land uses around the stations or their viability for TOD. It talks about the technical ability to upgrade the line but does not argue whether it should be done. Moreover, it lacks any sort of information on life cycle costs and, thus, they cannot be compared to alternatives. In other words, this is not a study about the viability of the tram train line; it is a study of how to build the tram train line.
__________________
VANCOUVER | Beautiful, Multicultural | Canada's Pacific Metropolis
     
     
  #7144  
Old Posted Sep 21, 2010, 7:12 PM
CLC CLC is offline
Registered User
 
Join Date: Apr 2008
Posts: 877
Stephen Rees, a committee member of RailfortheValley, somehow criticized the report too
http://stephenrees.wordpress.com/
     
     
  #7145  
Old Posted Sep 21, 2010, 8:07 PM
BCPhil BCPhil is offline
Registered User
 
Join Date: Jun 2009
Location: Surrey
Posts: 2,578
Quote:
Originally Posted by Zassk View Post


I really question the choice of this route. Yes, there is an existing track already present, but the report already admits that there is little ridership between Langley and Abbotsford. So why anyone would advocate extending a rail line past Langley is beyond me. On the other hand, Abbotsford is only 7 km away from the terminus of the existing WCE. Why not spend however many million to build WCE capacity from Mission to Abbotsford instead? Even if it cost $500 million, you would come out far ahead of this interurban proposal.

WCE would get Abbotsford people directly to downtown Vancouver. And if they need a transfer to SkyTrain, WCE would provide a shorter and faster route to SkyTrain than the proposed interurban route to Scott Road. If we spend the kind of money quoted in this interurban propsal, surely we can use that to renegotiate the WCE capacity from its current 10 trips/day, and extend it to Abbotsford.

Fundamentally, the "study" does nothing to justify the existence of this route. It provides no ridership estimates or justifications for each leg of the route, and no study into whether alternate alignments would produce superior service or ridership. And that leads to my last criticism - there is no justification offered for the inclusion of Chilliwack in the proposal. Extending the service to Chilliwack nearly doubles its length, and whom will it serve? Are residents of Chilliwack really demanding slow but frequent service into Metro Vancouver? How many Chilliwack residents will ride 90 mins to/from Surrey, or 125 minutes to/from Vancouver, or 150 minutes to/from Richmond? I would like to see the business case for that.
100% agree.

Not only would it be cheaper, but it would be faster for travelers too, thus more able to attract new riders. Coupled with the Evergreen Line, it would give riders in Abbostford a much more direct route to anywhere on the Burrard peninsula than going through Langley and Surrey. And if you were to invest $500 million in capital expenditures along the ROW between Mission and Downtown, you could probably add enough track and signals to run more trains longer in the day. Not only that, but if downtown (or the Burrard peninsula in general) is the destination that can attract the most riders, then leasing track from CN along the south bank, would be even faster/cheaper for riders from Chilliwack. The CN track is even more direct than the freeway. And according to my books, CN owes the BC Tax payer a favor or two.

However, the Rail for the Valley proposal might work if there is a business case for TOD. There are a few virtually uninhabited areas along the line that aren't in the ALR (or at least offer no value to the ALR). If you could get Langley township to put their weight into rezoning and subdividing properties around proposed stations in the middle of nowhere, it could work as transit based Suburbs for a Surrey Downtown. But I think that's not possible until the next boom, when job growth in Surrey starts to explode again, and finding housing in Surrey is more difficult (as right now it's fairly easy to find a reasonably priced house, moving out beyond 232 doesn't save you that much over buying in Surrey Proper in the current marketplace).

But, as it is now, I think you would end up spending 5 or 6 times as much in capital costs per boarding as you would on building the Broadway Skytrain line. It might be cheaper overall, but Broadway Skytrain will be better bang for the buck.

I think using the BCER ROW is a good idea for a near term and affordable solution to get people from Langley City and Cloverdale to Scott Road (where they complete their Journey into Vancouver). But I think the detour through Langley, Newton and Nordel is horrible for people from Abbostford going to downtown, and not even worth it for Abbostford to Surrey Center (Rapid bus on Hwy 1 would be twice as fast at a fraction the cost).
     
     
  #7146  
Old Posted Sep 21, 2010, 8:38 PM
Whalleyboy's Avatar
Whalleyboy Whalleyboy is offline
Registered User
 
Join Date: Jul 2008
Location: Surrey
Posts: 2,014
another crappy part of the route is it location through out surrey. It completely skips central
     
     
  #7147  
Old Posted Sep 21, 2010, 8:50 PM
twoNeurons twoNeurons is offline
loafing in lotusland
 
Join Date: Aug 2002
Location: Lotusland
Posts: 6,116
Quote:
Originally Posted by Whalleyboy View Post
another crappy part of the route is it location through out surrey. It completely skips central
True, but after a 1 hour trip, what's another 5 minutes by SkyTrain(Scott Road to Surrey Central)?
     
     
  #7148  
Old Posted Sep 21, 2010, 11:26 PM
jsbertram jsbertram is offline
Registered User
 
Join Date: Sep 2009
Posts: 3,245
Not sure if this is an accurate TV listing, but I see in the TVGuide that there is a program "Community Rail in the Valley" on Shaw Vancouver (Cable 4) being broadcast Tue 21st @ 8:30 pm, and repeated on Sat 25th @ 8:30pm and Sun 26th @ 3:30 pm.

Maybe we'll see Zwei on the program?
     
     
  #7149  
Old Posted Sep 21, 2010, 11:47 PM
Robert in Calgary Robert in Calgary is offline
Registered User
 
Join Date: Jul 2010
Posts: 86
Extend Skytrain to Newton.

Upgrade the tracks between Newton/Cloverdale/Langley, about 16km and run a frequent service on that portion. Or add another 7km to get to the Trans-Canada and TWU.

plus WCE to Abbotsford.

They seem fixated on just using the corridor as opposed to designing a good service for todays world.
     
     
  #7150  
Old Posted Sep 21, 2010, 11:50 PM
Whalleyboy's Avatar
Whalleyboy Whalleyboy is offline
Registered User
 
Join Date: Jul 2008
Location: Surrey
Posts: 2,014
Quote:
Originally Posted by Robert in Calgary View Post
Extend Skytrain to Newton.

Upgrade the tracks between Newton/Cloverdale/Langley, about 16km and run a frequent service on that portion. Or add another 7km to get to the Trans-Canada and TWU.


plus WCE to Abbotsford.

They seem fixated on just using the corridor as opposed to designing a good service for todays world.
this is what i want to see happen
     
     
  #7151  
Old Posted Sep 21, 2010, 11:53 PM
CLC CLC is offline
Registered User
 
Join Date: Apr 2008
Posts: 877
Quote:
Originally Posted by jsbertram View Post
Not sure if this is an accurate TV listing, but I see in the TVGuide that there is a program "Community Rail in the Valley" on Shaw Vancouver (Cable 4) being broadcast Tue 21st @ 8:30 pm, and repeated on Sat 25th @ 8:30pm and Sun 26th @ 3:30 pm.

Maybe we'll see Zwei on the program?
This is a new group of people
Quoted from Province:
Quote:

the South of Fraser Community Task Force was promoting its new 30-minute video Monday.

This is the group founded earlier this year by Township of Langley Mayor Rick Green. It also calls for Fraser Valley community rail service.

In fact, in addition to municipal government representatives from Delta, Surrey, the City of Langley, the township, the City of White Rock and Abbotsford, this group has advocacy group representation from Rail for the Valley, the Fraser Valley Heritage Rail Society, South Fraser On Trax and the Valley Transportation Advisory Committee.

Other task-force members include the valley's three universities, which would be well-served by the Inter Urban line: Kwantlen Polytechnic, Trinity Western and the University of the Fraser Valley.

The video, Community Rail in the Valley, was produced by Shaw Cablesystems, which is now showing it regularly on its local outlet. It calls for an initial demonstration line that could run from Scott Road to Abbotsford.

"We're already getting a very good response from the initial broadcasts," says Green, who chairs the task force. "Putting light rail on the Inter Urban just makes so much sense, because it would run through all the valley's population bases."

Read more: http://www.theprovince.com/life/Valley+light+rail+twin+groups+claim/3556678/story.html
     
     
  #7152  
Old Posted Sep 22, 2010, 12:00 AM
usog usog is offline
Registered User
 
Join Date: Dec 2008
Posts: 580
Okay as a surrey-boy who's lived there for the majority of my life, I cannot see their proposal getting a decent amount of usage. Ignoring their figures that have been heavily spun, I don't see their service levels/routing gathering any decent level of ridership for a long time. It outright skips Fleetwood and Guilford, two of the major areas in Surrey, and the routing itself doesn't exactly fit with the current population/transit trends. They probably selected the surrey portion based on existing track, track which is already full of freight traffic.

Anyways point is, if it won't take off in Surrey and they're banking on it being a success based off of Langley/Abbotsford traffic, they're probably in for a nice rude surprise called reality.

IMO they should just buy a few DMU's off of JR, and regauge them for Canada. I bet they would be able to get a decent price on older ones to start with, and the cars themselves are quite nice. I can't find their unit costs on google but here's the wiki article for one of the main series' used: http://en.wikipedia.org/wiki/KiHa_100_series

Edit: I assume that whoever they hired to write this report based it exclusively on information from North America/Europe, completely ignoring rail in Asia. At least that's what I got from a quick skim of the report. Kind of weird don't you think? Considering they want to run single/double car DMUs, would be informative for them to look at how JR handles their low-volume/less-developed lines imo, considering they've been doing it for decades and decades now.
     
     
  #7153  
Old Posted Sep 22, 2010, 12:14 AM
Whalleyboy's Avatar
Whalleyboy Whalleyboy is offline
Registered User
 
Join Date: Jul 2008
Location: Surrey
Posts: 2,014
dude it even skips central. Which is suppose to be Surreys main focal point

Last edited by Whalleyboy; Sep 22, 2010 at 12:33 AM.
     
     
  #7154  
Old Posted Sep 22, 2010, 12:26 AM
TransitJack TransitJack is offline
Registered User
 
Join Date: Jul 2009
Posts: 443
Tram Cars on a heavy freight railway: are such cars permitted on tracks that handle heavy freight cars and locomotives. Are there any regulations on the crash-worthiness of trams that operate with freight trains? Or is this a non-issue.
     
     
  #7155  
Old Posted Sep 22, 2010, 1:25 AM
Millennium2002 Millennium2002 is offline
Registered User
 
Join Date: Jun 2009
Posts: 1,742
There are restrictions on sharing tracks between trams and trains. The FRA of the US maintains crash-worthiness standards that are much higher than the European norm due to the long length and heavy tonnage of mainline trains. Canada follows similar requirements to ensure uniformity and enable easier connections. Few, if any, trams meet these requirements. This gives the tram supporters three options:

1. There must be complete grade-separation between the two services. (e.g. trams and trains cannot cross each other's lines or share the same line), which would at least double, triple, or even quadruple the cost of building the line.
2. Time sharing is put into effect. (e.g. freight trains can only run when trams are not using the line, which would be from roughly 12 AM to 6 AM for typical daily scheduled service.) This may impact the delivery of products and goods for consumers and businesses.
3. Custom railway-compliant DMUs or EMUs are purchased and built. This allows the old line to be reused but cause issues with reliability and frequency with long freight trains sharing tracks with short tram-trains.
     
     
  #7156  
Old Posted Sep 22, 2010, 1:30 AM
jlousa's Avatar
jlousa jlousa is offline
Ferris Wheel Hater
 
Join Date: Jun 2006
Posts: 8,371
I think the ideas bounced off here are much better then their proposal. Extend WCE across into Abby, it's doable and relatively cheap. Upgrade the other line from Surrey to Langley and maybe even Aldergrove. I just do not see the need for a line all the way out to Chilliwack today or in the immediate future. Building it would only encourage sprawl just like highway expansion will. Here we would be better off providing better service to existing population in a concentrated area instead of reduced service over a much larger area.
     
     
  #7157  
Old Posted Sep 22, 2010, 1:38 AM
usog usog is offline
Registered User
 
Join Date: Dec 2008
Posts: 580
I wonder how much it cost to make that report They even used google maps for images
     
     
  #7158  
Old Posted Sep 22, 2010, 5:52 PM
OhioGuy OhioGuy is offline
Registered User
 
Join Date: Jul 2004
Location: DC
Posts: 7,774
Global TV has a new video report on "Light Rail to the Valley"

http://www.globaltvbc.com/video/index.html?releasePID=4h9X9N4UjT1zbLxJabbIfGN54NQ9VE43

(if the link doesn't go directly to the video, just look in "News Hour Final" for the video titled, "Light Rail to the Valley")
     
     
  #7159  
Old Posted Sep 22, 2010, 6:12 PM
usog usog is offline
Registered User
 
Join Date: Dec 2008
Posts: 580
http://www.cbc.ca/canada/british-columbi...surrey-chilliwack-light-rail-report.html

Looks like it's getting picked up by quite a few places, what a pity. I wonder if that rail for the valley has some nice media connections for an otherwise non-story? Surely the all-powerful skytrain lobby can top that
     
     
  #7160  
Old Posted Sep 22, 2010, 6:48 PM
CLC CLC is offline
Registered User
 
Join Date: Apr 2008
Posts: 877
Quote:
Originally Posted by usog View Post
I wonder how much it cost to make that report They even used google maps for images
Probably free. David Cockle, the consultant who made the report, has his family living in Chilliwack, and he is friend of Zwei as well.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 4:24 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.