Quote:
Originally Posted by paradigm4
I would suspect the low numbers are a result of just building it either trenched or tunnelled between 10th and 17th. The route doesn't need to be trenched in the forest section and I personally feel McBride as is doesn't need much change. Tunnelling the residential section is the most important aspect IMO.
|
Looking at my local map, the distance to tunnel under Newcombe St from 10th Ave to Wedgewood St (effectively 20th Ave) before continuing on a ground-level road to a new interchange with the Trans Canada Highway is the same distance if you were to build a tunnel starting at the the strip mall at the intersection of Sangster Pl & McBride and head compass north to 16th Ave and end the tunnel at the land between the Derby Centre and the Englewood Mews (north side of 16 Ave opposite the hockey rink at Cariboo Hill).
From the northern portals at 16th Ave, a surface road would connect to the Gaglardi & TCH interchange.
These NB and SB tunnels would have to be built using a TBM machine, since you can't Cut 'n' Cover through all those homes, towers and the school along this alignment, but the added expense of TBM tunnelling would be offset by not having to build a new interchange with the TCH (which would be necessary with the Stormont Connector)
Tunnelling technology has improved substantially in the half century that the Stormont Connector has been talked about, so why not use these new techniques to build a smarter connection between McBride and Gaglardi?