So I finally got around to developing some visuals to describe my vision for the Calgary Regional Rail Network.
For the most part I tried to use existing rail ROW (mostly CPR). I've broken the system down into a bunch of different phases. First a little reference
Purple thin lines- LRT (fully expanded system)
Grey- HSR
Red- Bow Valley Line
Blue- North Line
Orange- Wheatland Line
Green- South Line
Yellow- Prarie Line (Possibly bus service only)
Cyan- Calgary Ring
Purple- Outer Connector
In Addition Dashed lines are underground sections, thin dashed are envisioned express collector bus routes.
Also I have used some station conditions:
HO- Hour Service Only for envisioned low useage stations
P- Peak used for stations with service only during rush hour
NP- Non-Peak Service to optimize network for rush hour traffic
Phase 1- Bow Valley (Red) Line & North (Blue) W/ Airport Connection
Local View
This inital phase of construction would involve constructing dedicated lines in the CPR ROW up the Bow Valley and Nose Hill Creek areas. Ideally these lines would be electrified. Design speed would be in the region of 120-140km/h. Frequency of trains would be every 20 minutes, unless otherwise indicated.
For the north line, termination would be at a newly constructed Calgary Central Rail Station on what is currently planned for the HSR terminal. The airport would have a station directly in the terminal (either underground or re-designing the parking structure to accomidate it). A branch line for express service during peak times would use the existing ROW. This line would then continue north to Balzac and Aridrie in this stage
For the Bow Valley Line, it would start at Calgary Central, having a station for U of C (with dedicated bus service), one at Tuscany then continuing onto Cochrane.
Phase 2- Wheatland (Orange) Line and South (Green) Line
This one is fairly self explanitory, The Wheatland line connects Strathmore and Chestermere, with stations in east Calgary, elliston (possible future 17th ave LRT connection), Forest Lawn, Foothills Industrial, and then throught he central calgary stations
South Line will take over for the envisioned SELRT as it is right now, providing faster service for those in the deep south east. It will continue to Dewinton and Okotoks.
The Bow Valley line will also be extended to the airport (reason why will become apparent in Phase 3). This will provide better frequency for airport travellers too.
Regional View Phase 1 & 2
Phase 3 Bow Valley Line- Banff Connection
The Bow Valley line will be extended to Canmore and Banff, which would provide airport to banff service in under 1.5 hours for tourists and calgarians alike. Ski buses would provide service from the Banff station up to the hills. Trains with bike racks in summer and ski racks in winter would be purchased/retrofitted.
Ultimate Vision
Local
So the ultimate vision includes a ring track which will follow in the ring road ROW, and provide a link to the intra city lines for those living in the majority of the far flung regions of the city.
Also as the westbrook area fills out (seen as a smaller down town), some if not all the lines would be extended to a multi mode transit hub there. This would be quite far down the road.
Also seen on there is the HSR, which will stop at the airport using the same tunnels as the Regionals, however shortly after the airport it will begin using its own ROW, with operating speeds at or above 250km/h
Regional
In the ultimate regional plan, lines will now extend as far as Lake Louise, Lethbridge, Medicine Hat, and Red Deer. Trips to these outer regions would be operated more as an inter city service (half hour to hourly departures).
Now to build it...