People will move to Langley whether you build transit or not.
Why not build a
Fraser Valley Express to service central nodes in Langley and encourage higher density development.
Here's an example:
A suburb of Edinburgh (City pop. 500k, Metro Area 700k)), Scotland:
Livingston.
Trains run every 30 minutes during the day into Waverly station. Because Edinburgh is horribly expensive to park in, and because traffic is congested, if one goes into the city, one takes the train. Look at all that countryside between the city and the suburb. Note: Edinburgh is only JUST building an LRT.
It helps that the train is 30 minutes and makes 4 or 5 stops vs. the car being closer to 40 minutes.
We've been talking about a "Fraser Valley Express" for years on SSP. The rail corridor is there and is not heavily used. A station in
Willowbrook,
Cloverdale South,
Newton,
Scott Road, Sapperton*, Gilmore*, Commercial* and
Downtown.
*These stations are optional.
This could be started with DMUs and upgraded to full commuter rail later. This would also connect Newton to SkyTrain. Translink is sitting on some parcels of land in Newton they bought a few years ago.
The SkyTrain extension idea was floated out of the blue when Kevin Falcon was transportation minister. It wasn't on anyone's radar until then. Kevin Falcon lives in Cloverdale. A SkyTrain extension to 168th would do two things for Cloverdale:
- It would make SkyTrain just convenient enough for its residents ( a few minutes on the bus down Fraser Hwy )
- it would guarantee a few more decades of no rail transit out to the valley, as the SkyTrain [or CrimeTrain as many NIMBY 'feel'] is too expensive to be used to cross the countryside between 168th and 186th.
Langley, Cloverdale and beyond are best served with commuter rail at the moment.