Quote:
Originally Posted by amor de cosmos
|
I wish there was funds to do both as both are needed. Plus the Broadway line would instantly pay for itself with taking all the Bline traffic + a lot of UBC traffic from other bus routes such as the 41/49 and downtown routes. I could also see plenty of additional traffic along broadway for people that either currently drive or avoid broadway due to the need to ride a slow/packed bus.
I'm also not sure how if they can really fit that many more people on the skytrain between broadway and downtown seeing as its already so jammed. It's a pain in the butt already to transfer from the M-Line and was even worse when the pattulo bridge was out due to the fire.
Just think what it will be like 5 years from now after the Evergreen line goes in and with the expected population growth. Gilmore/Brentwood/Holdom alone has a significant # of towers in the construction phase and/or in late planning, not to mention those going up around Lougheed and all those that will be in progress/complete along the Evergreen line.
The only feasible way of offloading some of that downtown traffic is to extend the M-Line to the Canada Line. Either that or increasing bus service significantly to VCC-Clark. Otherwise the Broadway platform is going to be crowded to the point of chaos.