Old Posted Aug 16, 2010, 6:47 PM
fusili's Avatar
fusili fusili is offline
Retrofit Urbanist
 
Join Date: Sep 2007
Posts: 6,692
If the storage tracks have been relocated to Highfield Industrial, does that mean CP will no longer be storing trains on the tracks between the Elbow River and 11th? If not, there is now a huge opportunity to create several at grade crossings from the Beltline into the DT. Pedestrian crossings preferably.
Reply With Quote
     
     
  #102  
Old Posted Aug 16, 2010, 7:09 PM
mersar's Avatar
mersar mersar is offline
Registered User
 
Join Date: May 2006
Location: Calgary, AB
Posts: 10,083
Quote:
Originally Posted by fusili View Post
If the storage tracks have been relocated to Highfield Industrial, does that mean CP will no longer be storing trains on the tracks between the Elbow River and 11th? If not, there is now a huge opportunity to create several at grade crossings from the Beltline into the DT. Pedestrian crossings preferably.
There will still be 3-4 tracks the entire length of downtown. At the peak a few years ago though in the East Village/East Beltline area there were 10+ tracks though, the difference between is what constitutes the new Highfield storage tracks essentially (there are 6 tracks running along Highfield Road south from the Ogden/Highfield/25th traffic circle)
__________________

Live or work in the Beltline? Check out the Official Beltline web site here
Reply With Quote
     
     
  #103  
Old Posted Aug 16, 2010, 7:51 PM
fusili's Avatar
fusili fusili is offline
Retrofit Urbanist
 
Join Date: Sep 2007
Posts: 6,692
Quote:
Originally Posted by mersar View Post
There will still be 3-4 tracks the entire length of downtown. At the peak a few years ago though in the East Village/East Beltline area there were 10+ tracks though, the difference between is what constitutes the new Highfield storage tracks essentially (there are 6 tracks running along Highfield Road south from the Ogden/Highfield/25th traffic circle)
Are those 3-4 tracks all thru tracks? I don't know the technical term, but I mean tracks that trains just pass through and don't store cars. If so, that means there won't be trains parked along the track length, and we could put some pedestrian crossings into the downtown. Just an idea.
Reply With Quote
     
     
  #104  
Old Posted Aug 16, 2010, 9:17 PM
mersar's Avatar
mersar mersar is offline
Registered User
 
Join Date: May 2006
Location: Calgary, AB
Posts: 10,083
Quote:
Originally Posted by fusili View Post
Are those 3-4 tracks all thru tracks? I don't know the technical term, but I mean tracks that trains just pass through and don't store cars. If so, that means there won't be trains parked along the track length, and we could put some pedestrian crossings into the downtown. Just an idea.
I believe only 2 of them are. Theres quite often trains stopped on the 2 south most tracks from what I've seen.

But pedestrian crossings are unlikely in my opinion even if they were just used for traversing the area. Let me play devils advocate for a minute here: The city would need to purchase property or at a minimum obtain an easement through the adjacent properties, many of which along 10th would lose parking and scream loudly as thats the only land they don't occupy with buildings. West of 5th theres a crossing every third block so you'd have to identify where to build them (mid block of the middle block?) taking into account the built form on both sides of the tracks. East of 5th Street theres a crossing at least every second block (and a proposed pedestrian crossing already on the books for 2nd Street SW) all the way to 4th Street SE, and most of this stretch there is no way but +15 style crossings from building to building over the tracks. And CP would insist on any other crossings being grade separated anyways (and there wouldn't be anything the city could do but accept this condition) for safety reasons.
__________________

Live or work in the Beltline? Check out the Official Beltline web site here
Reply With Quote
     
     
  #105  
Old Posted Aug 16, 2010, 10:18 PM
fusili's Avatar
fusili fusili is offline
Retrofit Urbanist
 
Join Date: Sep 2007
Posts: 6,692
Alright mersar, you win. Good points.
Reply With Quote
     
     
  #106  
Old Posted Aug 16, 2010, 10:55 PM
CtrlAltDel CtrlAltDel is offline
Registered User
 
Join Date: Mar 2004
Location: Calgary
Posts: 741
Looking forward to see what news this fall brings, and if there will be any big developments to be released.
Reply With Quote
     
     
  #107  
Old Posted Sep 2, 2010, 3:54 AM
defaultuser's Avatar
defaultuser defaultuser is offline
Registered User
 
Join Date: Mar 2008
Posts: 572
Quote:
SEAFOOD MARKET STUDIOS! Affordable + professionally managed temporary artists studios and creation space available in the East Village

Calling all Calgary-based emerging and professional artists, non-profit arts organizations, and artist collectives!



Need access to affordable, secure studio, rehearsal or creation space? Calgary Municipal Land Corporation (CMLC) and Calgary Arts Development have 10 studio spaces, common space, an office area (ideal for festival-oriented applicants) and a 10,000 sq. ft. warehouse space (ideal for rehearsal use) available for artists of all disciplines. Located within the vacant Seafood Market in the East Village (630 - 7th Ave. SE), studios and creation spaces are available for rent until March 15, 2011.

The Seafood Market is an excellent location for multi-disciplinary rehearsals, visual artists’ studios, a festival office, writers, photographers, graphic designers, film and video artists, and interdisciplinary artists. This space is not ideal for larger presentations or exhibitions.

Studios will be available for rent from September 15, 2010 to March 15, 2011, with potential for extension based on building availability. Rates vary based on the studio size and amenities (see attached rate schedule).
http://www.calgaryartsdevelopment.com/co...aged-temporary-artists-studios-and-creat
Reply With Quote
     
     
  #108  
Old Posted Sep 2, 2010, 4:15 AM
Ramsayfarian's Avatar
Ramsayfarian Ramsayfarian is offline
Registered User
 
Join Date: Dec 2007
Posts: 5,271
That's a smart idea. If you look at New York city, for the most part it's been the artists who have lead an area to gentrification. Maybe turning the crack-da-cal-da sac into some time of market place with artist spaces in the St. Louis would be another smart move.
Reply With Quote
     
     
  #109  
Old Posted Sep 2, 2010, 5:20 AM
DizzyEdge's Avatar
DizzyEdge DizzyEdge is offline
My Spoon Is Too Big
 
Join Date: Oct 2006
Location: Calgary
Posts: 9,162
Damn, if only there were spaces somewhere in between 280 and 10,000 sq ft, great idea though.
__________________
Concerned about protecting Calgary's built heritage?
www.CalgaryHeritage.org
News - Heritage Watch - Forums
Reply With Quote
     
     
  #110  
Old Posted Sep 2, 2010, 7:24 AM
MarkL MarkL is offline
Registered User
 
Join Date: Jul 2007
Posts: 392
This is a super temporary arrangement. That building was used until last year by the Calgary Drop-in Centre for storage, who was then booted out as the owners intended to develop it. I guess those plans are delayed enough that they are looking for some other temporary source of revenue while they sit on it. So don't get your hopes up about an artists' collective developing in that space.
Reply With Quote
     
     
  #111  
Old Posted Sep 2, 2010, 3:26 PM
Radley77's Avatar
Radley77 Radley77 is offline
The City That Moves
 
Join Date: Sep 2008
Location: Bridgeland, Calgary
Posts: 1,450
Quote:
Originally Posted by MarkL View Post
This is a super temporary arrangement. That building was used until last year by the Calgary Drop-in Centre for storage, who was then booted out as the owners intended to develop it. I guess those plans are delayed enough that they are looking for some other temporary source of revenue while they sit on it. So don't get your hopes up about an artists' collective developing in that space.
I tried to go to a theatrical production and Art Pawlowski was having a street preaching session at the same time and blocking off the entrance. Also, the artists that thought they had space and developed a show for that setting, then were cancelled at the last moment by the developer due to fire code issues. There still is accessibility issues as the road on the west side of the building as the road is still not complete last time I checked.

The whole situation seems very temporary; I am curious what the final plans for the building will be.
Reply With Quote
     
     
  #112  
Old Posted Sep 2, 2010, 3:34 PM
Wooster's Avatar
Wooster Wooster is offline
Round Head
 
Join Date: Nov 2003
Posts: 12,689
^ I'm quite sure the building is intended for demolition to accomodate a residential development. I recall an article about this some time back.
Reply With Quote
     
     
  #113  
Old Posted Sep 4, 2010, 11:48 PM
GoTall GoTall is offline
Registered User
 
Join Date: May 2007
Location: Calgary
Posts: 77
Quote:
Originally Posted by Wooster View Post
^ I'm quite sure the building is intended for demolition to accomodate a residential development. I recall an article about this some time back.
You are absolutely right. The building will be knocked down for redevelopment, you can tell that the building was not built to accommodate the floodplain just looking at the new 6th Street (paved yesterday) and front doors of the building.

Its just a good use of a building for temporary instead of putting it into a landfill and having a vacant lot for a two or three years.
Reply With Quote
     
     
  #114  
Old Posted Oct 3, 2010, 12:17 AM
jeffwhit's Avatar
jeffwhit jeffwhit is offline
effete latte-lifter
 
Join Date: Jun 2004
Location: Aalborg, DK
Posts: 3,686
Is anyone else going to be a part of the East Village focus groups this week? I will be at the 5-7pm session on Monday. I am not sure at all what the format will be, but if there's anything specific anyone would like raised or specific information you'd like me to seek out, just post it here.
__________________
Arts!: Click to listen
Reply With Quote
     
     
  #115  
Old Posted Oct 5, 2010, 6:04 PM
bunyip's Avatar
bunyip bunyip is offline
Friend or evil madman?
 
Join Date: Apr 2009
Location: Beltline
Posts: 24
Heard on the news last night there was a developer lined up for something in EV...anybody know anything about this?
Reply With Quote
     
     
  #116  
Old Posted Oct 5, 2010, 6:19 PM
Wooster's Avatar
Wooster Wooster is offline
Round Head
 
Join Date: Nov 2003
Posts: 12,689
Developers announce $300M, 600-unit residential project for East Village

By Mario Toneguzzi, Calgary Herald October 5, 2010 12:06 PM



CALGARY HERALD - The first land development deal for the East Village area was announced today, which includes 700,000 square feet of new residential and retail space.

Two of Canada's premiere developers, Bosa Development Corporation, together with Embassy Development, will build the $300-million, mixed-used, multi-family residential development.


Read more: http://www.calgaryherald.com/business/residences+Village/3626800/story.html#comments#ixzz11VfIjEn8
Reply With Quote
     
     
  #117  
Old Posted Oct 5, 2010, 6:40 PM
Radley77's Avatar
Radley77 Radley77 is offline
The City That Moves
 
Join Date: Sep 2008
Location: Bridgeland, Calgary
Posts: 1,450
Great news about the EV developer. I am suprised that fit with the ARP and FAR of between 3.0 to 7.0 ( 3 towers, 600 units and 700,000 square feet ).
http://www.calgary.ca/docgallery/bu/planning/pdf/east_village_arp/east_village_arp.pdf

Jogged by the other day, and CMLC were busy installing what looked like 2 self-cleaning toilets by the Simmons building.

Last edited by Radley77; Oct 5, 2010 at 7:03 PM.
Reply With Quote
     
     
  #118  
Old Posted Oct 5, 2010, 7:38 PM
fusili's Avatar
fusili fusili is offline
Retrofit Urbanist
 
Join Date: Sep 2007
Posts: 6,692
Quote:
Originally Posted by Wooster View Post
Developers announce $300M, 600-unit residential project for East Village

Read more: http://www.calgaryherald.com/business/residences+Village/3626800/story.html#comments#ixzz11VfIjEn8
Glorious! 600 is nothing to sneeze at. Now let's get something similar in the exchange site in Beltline.
__________________
Not everything that can be counted counts, and not everything that counts can be counted.
Reply With Quote
     
     
  #119  
Old Posted Oct 5, 2010, 7:55 PM
Wooster's Avatar
Wooster Wooster is offline
Round Head
 
Join Date: Nov 2003
Posts: 12,689
Updated East Village Article with some more details:


$300M deal 'transformative moment for Calgary’s East Village': Developer


By Mario Toneguzzi, Calgary Herald


Read more: http://www.calgaryherald.com/business/30...veloper/3626800/story.html#ixzz11W3tnHv7
Reply With Quote
     
     
  #120  
Old Posted Oct 5, 2010, 9:54 PM
Radley77's Avatar
Radley77 Radley77 is offline
The City That Moves
 
Join Date: Sep 2008
Location: Bridgeland, Calgary
Posts: 1,450
Email News Release from CMLC:

Quote:
East village– October 5, 2010

Here Comes the Neighbourhood!

East Village celebrates first land development deal.

East Village is celebrating a huge leap forward today with the announcement of the first land development deal for the community in almost a decade, triggering approximately $300 million of mixed-use, multi-family, residential development in the community. CMLC is thrilled to announce that two of Canada's premiere developers, Bosa Development Corporation, together with Embassy Development will deliver approximately 700,000 square feet of new residential and retail product to the community. The project represents approximately 15% of the available developable land in East Village.

Just one year since the Master Plan for East Village was unveiled to the public; this milestone marks a pivotal point in the transformation of East Village and celebrates three years of preparatory work that made this land purchase possible.

Bosa Development Corporation and Embassy Development are headquartered in Vancouver, British Columbia and are backed by international project expertise and unparalleled creativity in mid-rise, mixed-use communities. Bosa's familiarity with the Calgary market is demonstrated in such celebrated projects as, the Barclay, the Marquis, Axxiss, and Liberte. Embassy marks its first foray into the Calgary marketplace with the East Village project.

The Bosa/Embassy project is anticipated to deliver approximately 600 new residential units over five (5) years, with pre-sales beginning in early 2012 and initial residential occupancies by late 2013. The Embassy brand is synonymous with young, hip, smart design and East Village will boast a population of young, well-educated working professionals who have a desire to be close to the action of downtown.

Today celebrates a long-awaited announcement for Calgarians and demonstrates private sector confidence and commitment to join CMLC in the rejuvenation of East Village. It is the result of an extensive marketing program across North America to identify suitable developer partners for the East Village project. Our goal was to bring multi-family residential developers to East Village that had demonstrated expertise with mixed-use, mid to high rise developments, brownfield experience, solid brand reputation, financial capability, design and vision and a willingness to commit to construction timeframes.

Join us in celebrating the first of many exciting announcements for East Village and the transformation of Calgary's newest, oldest, coolest, warmest community.

East Village is being developed by CMLC - passionate, experienced placemakers who inspire communities to build, grow and believe.

calgarymlc.ca

Calgary Municipal Land Corporation (CMLC)
618 Confluence Way SE
Calgary, Alberta T2G 0G1
T: 403.718.0300
F: 403.718.0500
W: calgarymlc.ca

I wonder if where they did the photo-op was the actual parcel that was sold... I had thought this parcel would have been one of the hardest to sell given it's proximity to the LRT (noise).
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Calgary > Projects & Construction Updates
Forum Jump



Forum Jump


All times are GMT. The time now is 4:37 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.