HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Calgary > Transportation & Infrastructure


Closed Thread

 
Thread Tools Display Modes
     
     
  #1061  
Old Posted Aug 16, 2010, 3:27 PM
fusili's Avatar
fusili fusili is offline
Retrofit Urbanist
 
Join Date: Sep 2007
Posts: 6,692
Quote:
Originally Posted by SubwayRev View Post
Thanks dude. I read too much stuff and always forget where I read it. Interesting read for sure.
     
     
  #1062  
Old Posted Aug 16, 2010, 5:40 PM
You Need A Thneed's Avatar
You Need A Thneed You Need A Thneed is offline
Construction Enthusiast
 
Join Date: Feb 2007
Location: Castleridge, NE Calgary
Posts: 5,892
NE LRT Extention Update:

Video Link
     
     
  #1063  
Old Posted Aug 16, 2010, 5:46 PM
kw5150's Avatar
kw5150 kw5150 is offline
Here and There
 
Join Date: Nov 2009
Location: Calgary
Posts: 5,807
Love the new hybrid buses. Some compettion is always a good thing
__________________
Renfrew, Calgary, Alberta.
     
     
  #1064  
Old Posted Aug 16, 2010, 5:46 PM
srperrycgy's Avatar
srperrycgy srperrycgy is offline
I'm the bear on the right
 
Join Date: Jun 2004
Location: Calgary (Killarney)
Posts: 1,670
They're not Hybrids.
__________________
Stevinder.
* * * * * *
     
     
  #1065  
Old Posted Aug 16, 2010, 5:54 PM
You Need A Thneed's Avatar
You Need A Thneed You Need A Thneed is offline
Construction Enthusiast
 
Join Date: Feb 2007
Location: Castleridge, NE Calgary
Posts: 5,892
Quote:
Originally Posted by srperrycgy View Post
They're not Hybrids.
Didn't the City buy a few hybrid busses from a couple of different manufacturers to try them out? If so, have they arrived?

I know this order of Novas isn't hybrid.
     
     
  #1066  
Old Posted Aug 16, 2010, 7:57 PM
mersar's Avatar
mersar mersar is offline
Registered User
 
Join Date: May 2006
Location: Calgary, AB
Posts: 10,083
Quote:
Originally Posted by You Need A Thneed View Post
Didn't the City buy a few hybrid busses from a couple of different manufacturers to try them out? If so, have they arrived?

I know this order of Novas isn't hybrid.
The hybrid order was scrapped from what I recall. Makes sense, pretty much everywhere else has had nothing but trouble from their hybrids (ETS bought 6 of them and 2 of them haven't been in service in a year or more, and actually disappeared from ETS's yard earlier this year. The other 4 break down daily and the most common sighting is them being towed back to the garage)
__________________

Live or work in the Beltline? Check out the Official Beltline web site here
     
     
  #1067  
Old Posted Aug 16, 2010, 9:13 PM
You Need A Thneed's Avatar
You Need A Thneed You Need A Thneed is offline
Construction Enthusiast
 
Join Date: Feb 2007
Location: Castleridge, NE Calgary
Posts: 5,892
Quote:
Originally Posted by mersar View Post
The hybrid order was scrapped from what I recall. Makes sense, pretty much everywhere else has had nothing but trouble from their hybrids (ETS bought 6 of them and 2 of them haven't been in service in a year or more, and actually disappeared from ETS's yard earlier this year. The other 4 break down daily and the most common sighting is them being towed back to the garage)
It's probably good to not be an early adopter for some things like this.

Weren't the hybrid buses almost double the price as well?
     
     
  #1068  
Old Posted Aug 16, 2010, 9:46 PM
Riise's Avatar
Riise Riise is offline
City Maker
 
Join Date: Feb 2006
Location: Calgary | London
Posts: 3,195
Quote:
Originally Posted by h0twired View Post
On appearances alone it looks like a rather low budget bus.

New Flyer's new Excelsiors hit Winnipeg streets a few weeks ago.
I'm not a big fan of the appearance of the Novas. On the other hand, the Excelsiors look nice!
__________________
“Such suburban models are being rationalized as ‘what people want,’ when in fact they are simply what is most expedient to produce. The truth is that what people want is a decent place to live, not just a suburban version of a decent place to live.”
- Roberta Brandes Gratz
     
     
  #1069  
Old Posted Aug 16, 2010, 10:03 PM
You Need A Thneed's Avatar
You Need A Thneed You Need A Thneed is offline
Construction Enthusiast
 
Join Date: Feb 2007
Location: Castleridge, NE Calgary
Posts: 5,892
I was wondering...

If that really is a pic of Calgary's new Nova Buses, why doesn't it have Nova's updated headlight style?

Nova Bus
     
     
  #1070  
Old Posted Aug 16, 2010, 10:23 PM
mersar's Avatar
mersar mersar is offline
Registered User
 
Join Date: May 2006
Location: Calgary, AB
Posts: 10,083
Probably CT requested that style lights.

Peter has posted a pile of closeup shots now on his site at http://www.busdrawings.com/Transit/alberta/calgary/nova/8101-8140/index.htm, including interior photos.
__________________

Live or work in the Beltline? Check out the Official Beltline web site here
     
     
  #1071  
Old Posted Aug 17, 2010, 8:34 PM
You Need A Thneed's Avatar
You Need A Thneed You Need A Thneed is offline
Construction Enthusiast
 
Join Date: Feb 2007
Location: Castleridge, NE Calgary
Posts: 5,892
Fatal pedestrian accident on the NE line around lunchtime.

Calgary Herald Story.

The accident was at 36th Street and 26th Ave, right beside the Peter Lougheed Hospital. I saw the stopped train and flashing lights went Iwent out for lunch.
     
     
  #1072  
Old Posted Aug 17, 2010, 11:30 PM
mersar's Avatar
mersar mersar is offline
Registered User
 
Join Date: May 2006
Location: Calgary, AB
Posts: 10,083
Quote:
Originally Posted by You Need A Thneed View Post
Fatal pedestrian accident on the NE line around lunchtime.

Calgary Herald Story.

The accident was at 36th Street and 26th Ave, right beside the Peter Lougheed Hospital. I saw the stopped train and flashing lights went Iwent out for lunch.
CBC is saying police think its a suicide, though the Herald story was from after and its usually not mentioned if it was or not if it actually was.
__________________

Live or work in the Beltline? Check out the Official Beltline web site here
     
     
  #1073  
Old Posted Aug 17, 2010, 11:34 PM
Ramsayfarian's Avatar
Ramsayfarian Ramsayfarian is offline
Registered User
 
Join Date: Dec 2007
Posts: 5,271
Quote:
Originally Posted by mersar View Post
CBC is saying police think its a suicide, though the Herald story was from after and its usually not mentioned if it was or not if it actually was.
This is why Calgary needs taller bridges.
     
     
  #1074  
Old Posted Aug 18, 2010, 3:07 PM
mersar's Avatar
mersar mersar is offline
Registered User
 
Join Date: May 2006
Location: Calgary, AB
Posts: 10,083
9 of the Nova's have been spotted in Calgary so far (7 at SG, the other 2 were spotted early this morning parked at a truck stop on Peigan Trail and will likely by at SG by now) according to reports on CPTDB
__________________

Live or work in the Beltline? Check out the Official Beltline web site here
     
     
  #1075  
Old Posted Aug 19, 2010, 2:48 PM
reflexzero reflexzero is offline
Futurist
 
Join Date: Nov 2007
Location: Formerly Saddleridge, NE Calgary
Posts: 112
Quote:
Originally Posted by You Need A Thneed View Post
NE LRT Extention Update:
Yeah they just put in the chain link fence sound wall next to my house. Nothing but the best!

I can already see that the 2 street level crossings mixed with the furious lane-changing and two more sets of traffic lights on the NW corner of Saddletowne Circle are going to be a major clusterbomb when completed.


So, the question is, will my property value increase or decrease when Saddletowne station is opened?
__________________
Calgary: Ambitious, but rubbish.
     
     
  #1076  
Old Posted Aug 19, 2010, 3:05 PM
MalcolmTucker MalcolmTucker is offline
Registered User
 
Join Date: May 2007
Posts: 11,607
Depends on noise exposure vs walking distance to the station. Also whether the noise is just trains, or if it includes bells.

Just me, but I would be ok buying a place with a good soundwall with train sounds, not so much with crossing bells.

I would bet a wash or an increase is likely, but hard to measure since the market is moving so much in any case.
     
     
  #1077  
Old Posted Aug 22, 2010, 6:21 PM
mersar's Avatar
mersar mersar is offline
Registered User
 
Join Date: May 2006
Location: Calgary, AB
Posts: 10,083
Noticed yesterday that they've started the rebar and form work for the new west bound side of city hall station. Nothing started on the east bound side yet though
__________________

Live or work in the Beltline? Check out the Official Beltline web site here
     
     
  #1078  
Old Posted Aug 24, 2010, 4:10 AM
mersar's Avatar
mersar mersar is offline
Registered User
 
Join Date: May 2006
Location: Calgary, AB
Posts: 10,083
Fall service revisions are out (http://www.calgarytransit.com/html/fall_service_revisions_2010.html)

Quite a few increased freqencies above and beyond going back to normal fall/winter/spring scheduling. Routes 6, 11, 12, 14, 32, 46, 78, 137 all get increases, route 427 is no longer and a number of revisions to the routes to correspond with the opening of the Douglas Glen and McKenzie Towne park and ride lots which open on the 30th.
__________________

Live or work in the Beltline? Check out the Official Beltline web site here
     
     
  #1079  
Old Posted Aug 24, 2010, 5:08 AM
srperrycgy's Avatar
srperrycgy srperrycgy is offline
I'm the bear on the right
 
Join Date: Jun 2004
Location: Calgary (Killarney)
Posts: 1,670
Quote:
Originally Posted by mersar View Post
Fall service revisions are out (http://www.calgarytransit.com/html/fall_service_revisions_2010.html)

Quite a few increased freqencies above and beyond going back to normal fall/winter/spring scheduling. Routes 6, 11, 12, 14, 32, 46, 78, 137 all get increases, route 427 is no longer and a number of revisions to the routes to correspond with the opening of the Douglas Glen and McKenzie Towne park and ride lots which open on the 30th.
Yep. The #6 goes back to 20min freq. during the day like before.
__________________
Stevinder.
* * * * * *
     
     
  #1080  
Old Posted Aug 24, 2010, 6:54 AM
mersar's Avatar
mersar mersar is offline
Registered User
 
Join Date: May 2006
Location: Calgary, AB
Posts: 10,083
Quote:
Originally Posted by srperrycgy View Post
Yep. The #6 goes back to 20min freq. during the day like before.
Yep, I'm liking that change the most of any. Helps that both the #3 and the #6 stop essentially beside my new place, so no shortage of ways of getting downtown and to the CTrain even more frequent.
__________________

Live or work in the Beltline? Check out the Official Beltline web site here
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Calgary > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 11:08 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.