Quote:
Originally Posted by Zensteeldude
The reasion for it is most likely the same as that for using climbing tower cranes in the core. There is no tower to get in the way so there will be less "call-back" work. The track well most likely be removed below the climber as it advances up the side of the tower. That way they can install the curtian wall without having to wait till the entire crane is removed.
|
*Traynor scratches his head...*
I'm sure that explanation makes sense to you because you know what you are thinking, but try explaining it again as if I were an alien from another planet.
For example: Your use of the word "tower" when you say
"There is no tower to get in the way."
?????????

??????
Are you using the word tower to refer to a higher concrete core? The way other steel buildings are often built with the steel being bolted to the core long after it has climbed higher than the steel floors. Or do you mean a whole other tower, like 7WTC, for example. Clearly I don't understand.
Furthermore...I am not in the construction trade and do not know what "Call back work" refers to, or how having a "Tower in the way" would affect this... whatever it is.
Sorry to be such a pest but I'm not following the logic so far.