HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Calgary > Transportation & Infrastructure


Closed Thread

 
Thread Tools Display Modes
     
     
  #741  
Old Posted Jun 17, 2010, 11:14 AM
MalcolmTucker MalcolmTucker is offline
Registered User
 
Join Date: May 2007
Posts: 11,596
Quote:
Originally Posted by rail car designer View Post
the new interior has 56 seats, all along the car sidewalls. there is an incredible amount of space for standing passengers, with plenty of grab bars and handholds for them (no armpit smelling necessary!).

the car, externally, looks a lot like the newer Edmonton cars with Calgary specific graphics.
Welcome to the forum !
     
     
  #742  
Old Posted Jun 17, 2010, 5:40 PM
Riise's Avatar
Riise Riise is offline
City Maker
 
Join Date: Feb 2006
Location: Calgary | London
Posts: 3,195
With the Smart Card system, I hope they allow customers to purchase monthly passes not set to calendar months. For example, from the 14th of Month A to the 14th of Month B. Those passes along with 7-day travelcards have helped me save quite a bit of sterling.
__________________
“Such suburban models are being rationalized as ‘what people want,’ when in fact they are simply what is most expedient to produce. The truth is that what people want is a decent place to live, not just a suburban version of a decent place to live.”
- Roberta Brandes Gratz
     
     
  #743  
Old Posted Jun 17, 2010, 6:31 PM
MalcolmTucker MalcolmTucker is offline
Registered User
 
Join Date: May 2007
Posts: 11,596
Quote:
Originally Posted by Riise View Post
With the Smart Card system, I hope they allow customers to purchase monthly passes not set to calendar months. For example, from the 14th of Month A to the 14th of Month B. Those passes along with 7-day travelcards have helped me save quite a bit of sterling.
Write a letter and ask for it - I'd bet it would be easy enough to implement during the development stages, but rather easy to forget to include as an option and then hard to fix later.
     
     
  #744  
Old Posted Jun 17, 2010, 7:54 PM
You Need A Thneed's Avatar
You Need A Thneed You Need A Thneed is offline
Construction Enthusiast
 
Join Date: Feb 2007
Location: Castleridge, NE Calgary
Posts: 5,892
Contsruction fencing was being dropped off at Whitehorn Station today - work should be starting soon.
     
     
  #745  
Old Posted Jun 18, 2010, 1:48 PM
freeweed's Avatar
freeweed freeweed is offline
Home of Hyperchange
 
Join Date: Sep 2006
Location: Dynamic City, Alberta
Posts: 17,568
Finally got to hear the new "voice" on the C-Train. I can understand why they say she speaks more clearly, but yikes. How bland, bland, bland. I'm going to miss the old gal.
     
     
  #746  
Old Posted Jun 22, 2010, 3:01 PM
TransitSupporter TransitSupporter is offline
Registered User
 
Join Date: Jan 2008
Location: Calgary
Posts: 52
Quote:
Originally Posted by freeweed View Post
Finally got to hear the new "voice" on the C-Train. I can understand why they say she speaks more clearly, but yikes. How bland, bland, bland. I'm going to miss the old gal.
They interviewed her on CBC radio 1010 a couple of weeks ago. She lives in Lake Tahoe.
     
     
  #747  
Old Posted Jun 22, 2010, 4:05 PM
You Need A Thneed's Avatar
You Need A Thneed You Need A Thneed is offline
Construction Enthusiast
 
Join Date: Feb 2007
Location: Castleridge, NE Calgary
Posts: 5,892
It looks like work may have started on the tunnel under 64th Ave north of McKnight Westwinds station - a how was on site, digging.

At Whitehorn station, the construction area south of the platform has been fenced off, actual construction work should start shortly.
     
     
  #748  
Old Posted Jun 22, 2010, 6:29 PM
shogged's Avatar
shogged shogged is offline
someone
 
Join Date: Oct 2007
Location: Calgary
Posts: 453
looks like the c-train was just shut down along all of 7th ave. I messaged a friend a few trains up and he was saying something about a kid getting hit by the train. very sad story if it's true
     
     
  #749  
Old Posted Jun 22, 2010, 7:08 PM
mersar's Avatar
mersar mersar is offline
Registered User
 
Join Date: May 2006
Location: Calgary, AB
Posts: 10,083
So Calgary and area are getting $800M of Green Trip funding. 15 more LRV's, 100 more articulated buses is the initial part of Calgary's share, plus the planned commuter bus network for the surrounding towns and cities.
__________________

Live or work in the Beltline? Check out the Official Beltline web site here
     
     
  #750  
Old Posted Jun 22, 2010, 7:08 PM
LFRENCH's Avatar
LFRENCH LFRENCH is offline
Registered User
 
Join Date: Sep 2005
Location: Calgary
Posts: 1,121
Quote:
Originally Posted by shogged View Post
looks like the c-train was just shut down along all of 7th ave. I messaged a friend a few trains up and he was saying something about a kid getting hit by the train. very sad story if it's true
it is, a toddler was hit and killed. sounds like the the toddler and the grandfather was running to catch the train and the child fell underneath the train
     
     
  #751  
Old Posted Jun 22, 2010, 7:09 PM
SubwayRev's Avatar
SubwayRev SubwayRev is offline
Registered User
 
Join Date: Aug 2007
Location: Calgary
Posts: 445
Quote:
Originally Posted by mersar View Post
So Calgary and area are getting $800M of Green Trip funding. 15 more LRV's, 100 more articulated buses is the initial part of Calgary's share, plus the planned commuter bus network for the surrounding towns and cities.
Here's the article in the Herald:

Link
     
     
  #752  
Old Posted Jun 22, 2010, 7:32 PM
freeweed's Avatar
freeweed freeweed is offline
Home of Hyperchange
 
Join Date: Sep 2006
Location: Dynamic City, Alberta
Posts: 17,568
Quote:
Originally Posted by LFRENCH View Post
it is, a toddler was hit and killed. sounds like the the toddler and the grandfather was running to catch the train and the child fell underneath the train
And this, kids, is why you don't run into traffic.

A part of me is hoping criminal negligence / child endangerment charges get filed, but instead I imagine we'll see a 30km/h speed limit for the trains.
     
     
  #753  
Old Posted Jun 22, 2010, 8:19 PM
Stang Stang is offline
Registered User
 
Join Date: Aug 2008
Posts: 538
Yikes... were they running along the platform or were they on the street? Either way, a very tragic story.
     
     
  #754  
Old Posted Jun 22, 2010, 8:31 PM
freeweed's Avatar
freeweed freeweed is offline
Home of Hyperchange
 
Join Date: Sep 2006
Location: Dynamic City, Alberta
Posts: 17,568
Quote:
Originally Posted by Stang View Post
Yikes... were they running along the platform or were they on the street? Either way, a very tragic story.
Getting a lot of conflicting stories in the news on this. Some are saying the kid "ran away from his parents", so take that for what it's worth. I suspect the train was pulling into the station and the kid fell in front of it, from the platform.

I hate to say it, but we almost need an education campaign to teach people that you do not in fact need to run towards the train. Another one will come in a few minutes, settle down. Seeing people running from half a block away on a daily basis... gee, I wonder where kids learn to do this. Especially during rush hour when the frequency is < 5 mins.

Tragic that a child had to suffer for our own collective stupidity.
     
     
  #755  
Old Posted Jun 22, 2010, 8:54 PM
mooky mooky is offline
Registered User
 
Join Date: Sep 2008
Posts: 482
If I want to run for a train that's my own prerogative and I may have very good reasons, maybe I'm late for a meeting, or a hot date, or maybe I want to just catch the damn train and not stand in the cold on a balmy -30C day in the winter.

I feel sorry for the loss of life, but whoever was responsible for the kid is the only person to blame. I blame society for a lot of things, this is not one of them.
     
     
  #756  
Old Posted Jun 22, 2010, 9:00 PM
Wooster's Avatar
Wooster Wooster is offline
Round Head
 
Join Date: Nov 2003
Posts: 12,689
So this is the first $153 million of the $800 million that is being spent on the additional LRVs, articulated buses and Commuter buses? That leaves a healthy chunk for to try and get the SE LRT going, which the article indicates is in the long term proposal for this money.

Good news. Hopefully they can leverage this funding with the federal government into a 1/3-1/3-1/3 kind of arrangement for SELRT.
     
     
  #757  
Old Posted Jun 22, 2010, 9:38 PM
mooky mooky is offline
Registered User
 
Join Date: Sep 2008
Posts: 482
Maybe they can set it up and get a good winning bid from ... um, isn't it SNC-lavelin doing the westLRT, to start on the SE as they finish the west in 2012 ... that would leverage the fact that a lost of the same equipment would be used and could be quickly turned around to start on the new line?

If they do a good job on or under budget on the west line like they did in Vancouver I can't see anyone undercutting them too much and it would be good from there perspective of cost saving to just hop in the same city from one line to the next.
     
     
  #758  
Old Posted Jun 22, 2010, 9:51 PM
jeffwhit's Avatar
jeffwhit jeffwhit is offline
effete latte-lifter
 
Join Date: Jun 2004
Location: Aalborg, DK
Posts: 3,686
^^That is a great point. With all the equipment and expertise currently working on the west line, it would be very cost effective to turn it all over to SE line construction as soon as its available.
__________________
Arts!: Click to listen
     
     
  #759  
Old Posted Jun 23, 2010, 3:29 PM
Mazrim's Avatar
Mazrim Mazrim is offline
Registered User
 
Join Date: Aug 2009
Location: Calgary, Alberta
Posts: 1,407
That wouldn't happen because the City won't be sole sourcing a job of that magnitude. They would have to go through the whole P3 bidding process again.
     
     
  #760  
Old Posted Jun 23, 2010, 4:21 PM
Radley77's Avatar
Radley77 Radley77 is offline
The City That Moves
 
Join Date: Sep 2008
Location: Bridgeland, Calgary
Posts: 1,450
Not really public transit but thought I would post it here anyways:

More taxi stands to be installed downtown

Quote:
A space crunch for cabbies looking for fares downtown is expected to be alleviated later this summer when more stands are established, but the addition of six stalls is still not enough, say those in the industry.

Meetings between the city and the taxi and limousine advisory committee have been underway for about a year.

The committee has indicated 40 street spaces where it would like to see taxi stalls designated. But the city said it is looking to put back only a half-dozen stalls removed during the implementation of the ParkPlus system.

That would put the number of stalls at 61 in the core, said Troy McLeod, manager of traffic for the city of Calgary....

Read more: http://www.calgaryherald.com/More+taxi+stands+installed+downtown/3189923/story.html#ixzz0rh4jgc7W
I guess I have always been able to flag down a cab in a couple minutes, but it'd be nice to have a couple designated spots for cabs downtown.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Calgary > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 7:22 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.