  #6521  
Old Posted Jun 18, 2010, 1:30 AM
WarrenC12's Avatar
WarrenC12 WarrenC12 is offline
Registered User
 
Join Date: May 2007
Location: East OV!
Posts: 24,736
Funny, the Olympic period wasn't enough of a "test"?
     
     
  #6522  
Old Posted Jun 18, 2010, 6:41 AM
twoNeurons twoNeurons is offline
loafing in lotusland
 
Join Date: Aug 2002
Location: Lotusland
Posts: 6,126
Maybe they're testing to see how much of a difference the increased frequency actually makes?
     
     
  #6523  
Old Posted Jun 18, 2010, 8:21 AM
teriyaki teriyaki is online now
Registered User
 
Join Date: Nov 2008
Posts: 606
Quote:
Originally Posted by twoNeurons View Post
Maybe they're testing to see how much of a difference the increased frequency actually makes?
+1. Hopefully the results will spur them to move the planned frequency increase up.
     
     
  #6524  
Old Posted Jun 18, 2010, 9:30 AM
Alex Mackinnon's Avatar
Alex Mackinnon Alex Mackinnon is offline
Can I has a tunnel?
 
Join Date: May 2008
Location: East Van
Posts: 2,219
Quote:
Originally Posted by cabotp View Post
A calliper in theory could last for quite a long time. Although if debris gets inside they can start to seize up or leak. The pads are going to be changed regularly. The rotors can last a long time if the brakes do not over heat. Heat kills rotors. Considering most of the braking is done by the Linear induction motors and the calliper braking is only for a the last bit. I don't see how they could over heat all that much.

But a calliper shouldn't just fall off. The only way for that to happen is if the bolts were loose or they snapped off. There might have also been a crack in the mounting. But anything like that should have been easy to spot on the previous service. I'd be interested to know whether the pads had been recently changed and someone didn't torque down the calliper bolts enough.
Or it could have been over torqued, or it could have not had lock tite applied and vibrated out. There's a lot of possibilities. I take it you've done some form of maintenance engineering as well?
     
     
  #6525  
Old Posted Jun 18, 2010, 1:47 PM
cc85 cc85 is offline
Registered User
 
Join Date: Apr 2006
Location: Island City
Posts: 451
it only means one thing - that they are preparing to move up the introduction of reduced headways
     
     
  #6526  
Old Posted Jun 18, 2010, 3:14 PM
twoNeurons twoNeurons is offline
loafing in lotusland
 
Join Date: Aug 2002
Location: Lotusland
Posts: 6,126
Maybe they'll figure out that the introduction of lower headways don't significantly affect anything, and determine that it's not worth the penalty.

Or maybe they'll publish their findings but state that since Translink doesn't have any money we can't do anything about it... unless there's some additional funding.
     
     
  #6527  
Old Posted Jun 18, 2010, 4:30 PM
Zassk Zassk is offline
Registered User
 
Join Date: Sep 2009
Posts: 2,303
There was yet another article about the Canada Line and capacity in the Thursday edition of one of the Richmond papers, and yet again Stephen Rees was quoted as stating that the only possible reason for crowding issues was the P3 agreement. I can't find the article online yet - perhaps it will be up in a few days.
     
     
  #6528  
Old Posted Jun 18, 2010, 4:57 PM
The_Henry_Man The_Henry_Man is offline
HA
 
Join Date: Mar 2006
Location: St. Cloud, MN/Richmond, BC
Posts: 873
This is good news!! But what's most important is to extend that "peak hour service" to later in the evening.
     
     
  #6529  
Old Posted Jun 18, 2010, 6:25 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,814
Quote:
Originally Posted by twoNeurons View Post
Maybe they'll figure out that the introduction of lower headways don't significantly affect anything, and determine that it's not worth the penalty.

Or maybe they'll publish their findings but state that since Translink doesn't have any money we can't do anything about it... unless there's some additional funding.
From one of the articles, it sounds like TransLink pays for a specified number of "runs" each day. The article also seemed to imply that TransLink could shuffle the distribution of those runs to cluster them differently during the day. So maybe they are seeing whether increased frequency is worth shuffling the timing of runs.
     
     
  #6530  
Old Posted Jun 18, 2010, 8:25 PM
cabotp cabotp is offline
Registered User
 
Join Date: Mar 2009
Location: Vancouver, BC
Posts: 2,813
Quote:
Originally Posted by Alex Mackinnon View Post
Or it could have been over torqued, or it could have not had lock tite applied and vibrated out. There's a lot of possibilities. I take it you've done some form of maintenance engineering as well?
I'm apprenticing to be a Commercial Transport Mechanic. I've been in the industry for 5 years. So I've done quite a few disc brake jobs. Yet I've never heard of a calliper falling off. I've seen callipers that are loose though.

You are correct that something might have been over torqued. Causing the bolt to be in the stages of being snapped and the vibration just added to and finished it off. Lock tite at least in when it comes to trucks is never used. So I don't see them using it on trains.
     
     
  #6531  
Old Posted Jun 18, 2010, 11:49 PM
usog usog is offline
Registered User
 
Join Date: Dec 2008
Posts: 580
On another note, anyone notice how more and more people are breaking open/using the emergency exits at skytrain stations? Of course the one at metrotown station has been used for a long time, and I've noticed the same at New Westminster station, and now at Surrey Central. They really should get working on renovating the stations...
     
     
  #6532  
Old Posted Jun 19, 2010, 2:24 AM
Waders Waders is offline
Registered User
 
Join Date: May 2009
Posts: 1,361
Quote:
Originally Posted by usog View Post
On another note, anyone notice how more and more people are breaking open/using the emergency exits at skytrain stations? Of course the one at metrotown station has been used for a long time, and I've noticed the same at New Westminster station, and now at Surrey Central. They really should get working on renovating the stations...
The stair gate at Metotown station platform was removed months ago and the alarm was not working or disabled for years. So in practice it is just another exit. I use the emergency exit all the time as it is much faster than the elevator and the other stair.

As for the station renovation, I hope some of the Faregate/Smart Card station modification money will be spent on improving the passenger exit, otherise the faregate and ticket machine level will become a chokepoint.
     
     
  #6533  
Old Posted Jun 19, 2010, 3:10 AM
mr.x's Avatar
mr.x mr.x is offline
Registered User
 
Join Date: Dec 2003
Location: Stockholm
Posts: 12,805
I was in the Bay when it happened, there was a major but shortlived blackout in Downtown Vancouver today...both SkyTrain lines in Downtown were affected.

I saw a few people make a run for it out the doors with Bay merchandise when the lights went out. :p
     
     
  #6534  
Old Posted Jun 19, 2010, 3:20 AM
Waders Waders is offline
Registered User
 
Join Date: May 2009
Posts: 1,361
Around 6:30pm? No wonder the Metrotown skytrain station was so jam packed for awhile and no train arrived.
     
     
  #6535  
Old Posted Jun 19, 2010, 3:26 AM
mr.x's Avatar
mr.x mr.x is offline
Registered User
 
Join Date: Dec 2003
Location: Stockholm
Posts: 12,805
Quote:
Originally Posted by Waders View Post
Around 6:30pm? No wonder the Metrotown skytrain station was so jam packed for awhile and no train arrived.
I think it was around 6 pm, maybe a few minutes earlier.


There are only so many times when you get to wander around the Bay in pitch black.
     
     
  #6536  
Old Posted Jun 19, 2010, 3:36 AM
Waders Waders is offline
Registered User
 
Join Date: May 2009
Posts: 1,361
Right, around 6pm. I was surprised how quickly the Metrotown station platform filled up with passengers within a few minutes. Luckily 2 4-cars MKII trains eventually arrived.
     
     
  #6537  
Old Posted Jun 19, 2010, 3:39 AM
mr.x's Avatar
mr.x mr.x is offline
Registered User
 
Join Date: Dec 2003
Location: Stockholm
Posts: 12,805
Quote:
Originally Posted by Waders View Post
Right, around 6pm. I was surprised how quickly the Metrotown station platform filled up with passengers within a few minutes. Luckily 2 4-cars MKII trains eventually arrived.
I'm guessing lolll...i don't think i looked at the time.


edit: according to the Province, the blackout happened at aproximately 5.20 and continued until 5.45.
     
     
  #6538  
Old Posted Jun 19, 2010, 3:57 AM
Waders Waders is offline
Registered User
 
Join Date: May 2009
Posts: 1,361
Quote:
Originally Posted by mr.x View Post
I'm guessing lolll...i don't think i looked at the time.
edit: according to the Province, the blackout happened at aproximately 5.20 and continued until 5.45.
I didn't look at the time either.
According to CBC News, the blackouts started about 5:30 p.m and regular service resumed about 6:30 p.m.
It looks like Canada Line was not affected, which was a good thing considering its platform length is so short.
     
     
  #6539  
Old Posted Jun 19, 2010, 4:10 AM
aberdeen5698's Avatar
aberdeen5698 aberdeen5698 is offline
Registered User
 
Join Date: May 2010
Posts: 4,808
Quote:
Originally Posted by mr.x View Post
There are only so many times when you get to wander around the Bay in pitch black.
I'm really surprised that they're not required to have emergency lighting in a public area like that...
     
     
  #6540  
Old Posted Jun 19, 2010, 4:14 AM
mr.x's Avatar
mr.x mr.x is offline
Registered User
 
Join Date: Dec 2003
Location: Stockholm
Posts: 12,805
Quote:
Originally Posted by aberdeen5698 View Post
I'm really surprised that they're not required to have emergency lighting in a public area like that...
They do....I was in the basement in the back of the men's section...it took a few mins for the emergency lights to go on, but I know that usually they're suppose to come on within a few secs after the power goes out.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 6:52 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.