Old Posted Jun 14, 2010, 3:08 AM
SD_Phil's Avatar
SD_Phil SD_Phil is offline
Heavy User
 
Join Date: Apr 2005
Location: CA
Posts: 2,704
I'll join the celebration! As much as I like the height on the FT this has always been my favorite design in the new WTC complex. Looking forward to watching it rise over the next couple of years.
Reply With Quote
     
     
  #802  
Old Posted Jun 14, 2010, 3:14 AM
nycdagreatest's Avatar
nycdagreatest nycdagreatest is offline
Danny proud New Yorker
 
Join Date: Feb 2010
Location: astoria,ny
Posts: 327
wait, isn't it only being built to street level?
Reply With Quote
     
     
  #803  
Old Posted Jun 14, 2010, 3:33 AM
uaarkson's Avatar
uaarkson uaarkson is offline
Registered User
 
Join Date: Nov 2008
Location: Back in Flint
Posts: 2,103
For now. There's a decent chance that could change by the time it actually reaches street level.

The very act of starting a plan for the rest of the site ignited tons of new tenant interest for the WTC.
Reply With Quote
     
     
  #804  
Old Posted Jun 14, 2010, 1:39 PM
NYguy's Avatar
NYguy NYguy is offline
New Yorker for life
 
Join Date: Jul 2001
Location: Borough of Jersey
Posts: 57,230
http://www.observer.com/2010/slideshow/127978/sixteen-acres-construction

At the World Trade Center, Stalemate Gives Way to Construction

Quote:
Sixteen Acres of Construction
Stalemates--political infighting and battling between private and public actors--have long been part of the narrative, helping to explain the slow progress (the first tower is slated to open more than 12 years after 9/11).

But as of March, when a tentative financial realignment and subsidy package was struck between private developer Larry Silverstein and an array of governmental actors, conflict has subsided--at least for the time being.

So given the relative tranquility--and with Mr. Silverstein doing foundation work on one of his three sites and building up the steel on another--we went down on Friday to check out progress at the site.

This shot is at the north end, looking south. Cranes are clearly everywhere, but there are actually at least four other giant cranes at the site that don't make it into the shot.

-- Eliot Brown

(Photos by Brian Letwin)



the top of the photo (which looks north) is the site for the now indefinitely-postponed 2 World Trade Center, where Mr. Silverstein is doing early foundation work.
Slowly but surely the other towers are joining the construction show at the WTC site.
Reply With Quote
     
     
  #805  
Old Posted Jun 14, 2010, 2:18 PM
OneWorldTradeCenter's Avatar
OneWorldTradeCenter OneWorldTradeCenter is offline
Editor
 
Join Date: Aug 2009
Location: Renningen, Germany
Posts: 1,201
Good to hear those news. My bet was that they start with Tower 3 at first.
Reply With Quote
     
     
  #806  
Old Posted Jun 14, 2010, 2:43 PM
OneWorldTradeCenter's Avatar
OneWorldTradeCenter OneWorldTradeCenter is offline
Editor
 
Join Date: Aug 2009
Location: Renningen, Germany
Posts: 1,201
From earthcam:

Reply With Quote
     
     
  #807  
Old Posted Jun 15, 2010, 10:56 AM
westmc9th's Avatar
westmc9th westmc9th is offline
Registered User
 
Join Date: Apr 2009
Location: Charlotte
Posts: 130
By Joe Woolhead, wtc.com, 6-6-10. Prep or U/C....??

Reply With Quote
     
     
  #808  
Old Posted Jun 15, 2010, 1:11 PM
OneWorldTradeCenter's Avatar
OneWorldTradeCenter OneWorldTradeCenter is offline
Editor
 
Join Date: Aug 2009
Location: Renningen, Germany
Posts: 1,201
Looks like piling work to me.
Reply With Quote
     
     
  #809  
Old Posted Jun 15, 2010, 7:20 PM
NYguy's Avatar
NYguy NYguy is offline
New Yorker for life
 
Join Date: Jul 2001
Location: Borough of Jersey
Posts: 57,230
From wtc.com (larger version)

Reply With Quote
     
     
  #810  
Old Posted Jun 15, 2010, 8:35 PM
uaarkson's Avatar
uaarkson uaarkson is offline
Registered User
 
Join Date: Nov 2008
Location: Back in Flint
Posts: 2,103
Looks like piling to me.
Reply With Quote
     
     
  #811  
Old Posted Jun 15, 2010, 9:49 PM
upNaway upNaway is offline
Registered User
 
Join Date: Apr 2010
Posts: 71
Its gd to see some clear photos of this part of the site since the RBG Cam is still down
Reply With Quote
     
     
  #812  
Old Posted Jun 16, 2010, 1:45 PM
OneWorldTradeCenter's Avatar
OneWorldTradeCenter OneWorldTradeCenter is offline
Editor
 
Join Date: Aug 2009
Location: Renningen, Germany
Posts: 1,201
No doubt, they started foundation work like lowermanhattan.info said. It's under-construction now.
Reply With Quote
     
     
  #813  
Old Posted Jun 18, 2010, 9:19 PM
NYguy's Avatar
NYguy NYguy is offline
New Yorker for life
 
Join Date: Jul 2001
Location: Borough of Jersey
Posts: 57,230
Reply With Quote
     
     
  #814  
Old Posted Jun 18, 2010, 9:40 PM
Bucktown718's Avatar
Bucktown718 Bucktown718 is offline
Registered User
 
Join Date: Sep 2009
Location: Brooklyn, New York
Posts: 296
Glad to see something is finally happening down there.
Reply With Quote
     
     
  #815  
Old Posted Jun 19, 2010, 7:35 PM
NYguy's Avatar
NYguy NYguy is offline
New Yorker for life
 
Join Date: Jul 2001
Location: Borough of Jersey
Posts: 57,230
Quote:
Originally Posted by Bucktown718 View Post
Glad to see something is finally happening down there.
It is amazing to see, considering how long the site sat vacant. Even more so when you consider the tower we are watching the beginnings of.
Reply With Quote
     
     
  #816  
Old Posted Jun 21, 2010, 10:54 PM
NYguy's Avatar
NYguy NYguy is offline
New Yorker for life
 
Join Date: Jul 2001
Location: Borough of Jersey
Posts: 57,230
Reply With Quote
     
     
  #817  
Old Posted Jun 22, 2010, 4:16 AM
JayPro JayPro is offline
Registered User
 
Join Date: Apr 2008
Location: South Huntington, Long Island, New York
Posts: 1,047
I'm not ashamed to say that I almost bawled for joy in front of other people when I first saw this design.
How tragic would it have been if this piece of the cake, the one IMO that ties everything together into one cohesive unit in more than one respect, had its fate left entirely in the hands of the Port Authority?
The only thing I wish they could do if technology could allow for it is to build the skyscraper on a kind of base that could allow for the entire structure to rotate 360° at 1 to 4 revs/hour so we all could see the lit diamonds.
Why should Jersey always have the grand view?
Reply With Quote
     
     
  #818  
Old Posted Jun 22, 2010, 3:25 PM
SkyscrapersOfNewYork's Avatar
SkyscrapersOfNewYork SkyscrapersOfNewYork is offline
Moderator
 
Join Date: Sep 2009
Location: New York City
Posts: 2,523
Quote:
Originally Posted by JayPro View Post
I'm not ashamed to say that I almost bawled for joy in front of other people when I first saw this design.
How tragic would it have been if this piece of the cake, the one IMO that ties everything together into one cohesive unit in more than one respect, had its fate left entirely in the hands of the Port Authority?
The only thing I wish they could do if technology could allow for it is to build the skyscraper on a kind of base that could allow for the entire structure to rotate 360° at 1 to 4 revs/hour so we all could see the lit diamonds.
Why should Jersey always have the grand view?
that would be.......AWESOME!!!!
Reply With Quote
     
     
  #819  
Old Posted Jun 22, 2010, 4:09 PM
BStyles BStyles is offline
Registered User
 
Join Date: Jul 2009
Posts: 557
One to four revolutions per hour? This is an office tower, not a ballerina. Besides, tenant occupancy would cause an offset of weight which would crumble the tower from the inside out. Remember, the concrete core is secured to the bedrock. and the steel is welded both to bedrock and the core steel. That would be impossible any way you put it.
Reply With Quote
     
     
  #820  
Old Posted Jun 22, 2010, 7:09 PM
JayPro JayPro is offline
Registered User
 
Join Date: Apr 2008
Location: South Huntington, Long Island, New York
Posts: 1,047
Quote:
Originally Posted by BStyles View Post
One to four revolutions per hour? This is an office tower, not a ballerina. Besides, tenant occupancy would cause an offset of weight which would crumble the tower from the inside out. Remember, the concrete core is secured to the bedrock. and the steel is welded both to bedrock and the core steel. That would be impossible any way you put it.
...which is precisely why I said "if technology could allow for it."

Hypothetically, my dear Watson.

Seriously, though:
Can it be done above bedrock level?

For instance, build the base and tower to maybe about ten floors up. Then, using the same technological principles that allow for revolving rooftop restaurants, put in the mechanism, which I would think might have to be integrated into the structure's core in order for it to work.
Make the revs slow, like 90° clockwise per day...or at a rate unnoticeable to tenants/occupants, yet sufficient so that no one from any vantage point into the city would have to wait too long to see the diamonds.

Again, this is all what if. I know well nigh squat about architecture and construction.

Last edited by JayPro; Jun 22, 2010 at 7:22 PM.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Global Projects & Construction > Supertall Construction
Forum Jump



Forum Jump


All times are GMT. The time now is 10:40 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.