Quote:
Originally Posted by Sir.Humphrey.Appleby
50 m stations vs 180 m stations is a big difference in terms of cost. Plus, a fair portion of the tunnel was cut and covered not bored, all the underground stations were dug out, not mined.
|
The initial project called for a deep bored tunnel. The winning bidder mentioned didn't want to, so they proposed shorter stations and wider vehicles with a shallow tunnel. They respected the 15kphpd number.
This is another reason why I never understood all the bloated planning in Ottawa. They could have said, we need capacity for 30kphpd in 2050. We need that many stations, show me your plan. Planners have no interest in finding the cheaper route, builders yes.
From the Delcan Rail System Study document:
Quote:
Note 1: In order to meet the 2031 core capacity requirement, the vehicles associated with the LRT system will require
operation with less distance between them. This requires a more modern Automatic Train Control (ATC) system such as
the Communications Based Train Control (CBTC) system.
|
Basically, you will pay to have an operator that does actually nothing in the train, much like in Montreal where the system has also ATC.