HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > United States > Mountain West


Reply

 
Thread Tools Display Modes
     
     
  #1781  
Old Posted Apr 29, 2010, 3:46 PM
UTPlanner's Avatar
UTPlanner UTPlanner is offline
Registered User
 
Join Date: Dec 2007
Posts: 941
I was living in in Provo when they covered portions of a canal in and around the BYU campus. A portion ran right outside my apartment door. It was great to have the running water and the occassional duck, but older canals are very inefficient at transporting water. By piping a canal you have far less leakage and you're not losing water to evaporation. I can understand the logic in burying it though losing the creek like environment is disappointing.
Reply With Quote
     
     
  #1782  
Old Posted Apr 29, 2010, 4:16 PM
SLCforme SLCforme is offline
Registered User
 
Join Date: Feb 2007
Location: Salt Lake City
Posts: 403
The points you guys make about less leakage and evaporation are valid. And it's true that it was a human constructed canal not a natural creek. If they really make a nice trail with greenery then it could still be a nice trail to jog on, and maybe I'm just being nostalgic, but I'll still miss the canal.
__________________
"Orthodoxy means not thinking-not needing to think. Orthodoxy is unconsciousness."
George Orwell, "1984"
Reply With Quote
     
     
  #1783  
Old Posted Apr 30, 2010, 1:15 PM
delts145's Avatar
delts145 delts145 is offline
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 20,675
Pl. Grove leaders want to build 4-block city campus downtown


A panoramic view of downtown Pleasant Grove. A proposed downtown Pleasant Grove civic center will house new city and public service offices in a four block area. MARK JOHNSTON/Daily Herald

By Cathy Allred
The Daily Herald


PLEASANT GROVE -- Forget what you know Pleasant Grove's Main Street looks like, instead visualize a four-block municipal campus with a village-type setting done in early 1800s-style architecture, and you have the dream city leaders are working to make a reality.

"It's been germinating for years," said Pleasant Grove's Community Development Director Ken Young, adding that the revitalization of the downtown area has been discussed at several meetings.

The city of Pleasant Grove began advertising for proposals March 1 from firms interested in designing and constructing a civic center that would ideally include a city hall, a fire station, a library, a police station, a justice court, arts center, a 2-acre park, amphitheater and underground parking. Thinking ahead, they want the plans made for a city of 60,000, which is Pleasant Grove's projected build out population.

Young said the idea of a downtown campus became more conceptualized with the help of the American Institute of Architects Regional/Urban Design Assistance Team in 2006, and even more so during the city's general plan update and the birth of the Downtown 2020 Action Plan. It was during the 2020 Action meetings that those participating decided on an old-style early 1800s village concept.

"Instead of spread out and modern looking, we want to go up and old looking, a turn of the 19th century appearance," Young said. "We do anticipate it being built in phases, but how many phases and how long, that is all in question."

He said the idea of clusters of facilities will help to create phases when parts of the plan can be built. The Downtown Advisory Board has been included in planning because the city also wants to create space for commercial entities.

"My concern about downtown is that something happens down there that brings people in, and the idea of the civic center fits it a little better than most," said Dale Warburton, Downtown Advisory Board chairman.

He said there is also a great need for buildings to house municipal services.

"Our fire department is really hurting size-wise, the library needs a definite expansion, and the police department needs new space," Warburton said.

There is an informational meeting planned for Tuesday at 11 a.m. in the Pleasant Grove Council Chambers, 70 S. 100 East, and the deadline for proposal submittals is March 17.

"Anyone can come, but we are anticipating it will be potential solicitors," Young said.

The project area is in the Downtown Pleasant Grove area, about 17 acres, of which the city owns 8 acres; and taking a broad brush to the proposed campus area, the plan reaches from 100 North to 200 South from 200 East to Main streets.

"How soon we can anticipate a civic center downtown is in question simply because of the finance element and how much it will cost," Young said. "What we are trying to do is get started with a plan ... and take it as we can finance it."

.
Reply With Quote
     
     
  #1784  
Old Posted May 4, 2010, 11:34 AM
delts145's Avatar
delts145 delts145 is offline
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 20,675
P.G. convention center not dead, not coming soon

http://heraldextra.com/news/local/north/...f119456-fc13-5b68-afea-7a44f44ae066.html

After three and a half years of promises, Pleasant Grove city staff are urging impatient elected officials not to give up faith that a convention center really will be built.

But it may take another three or four years, staff said.


It's not hard to see why elected officials might now be a tad weary of keeping the faith. The long-anticipated Embassy Suites Hotel in Pleasant Grove was announced in January 2007 with promises of more than 400 jobs, 520 hotel rooms and 100,000 square feet of conference space. Construction was to begin in June 2007, ready to open by October 2008...

.
Reply With Quote
     
     
  #1785  
Old Posted May 8, 2010, 2:14 AM
jtrent77 jtrent77 is offline
Registered User
 
Join Date: Aug 2008
Posts: 571
UDOT recently unveiled changes to the I-15 core project. Mainly the exit at Provo Center St. has been revamped again, and they are going to work it out so they don't have to do a lane closure as they work on the S-curve.

http://heraldextra.com/news/local/article_78c453a2-d5e4-57b2-a138-a6c5d3567a6a.html
Reply With Quote
     
     
  #1786  
Old Posted May 10, 2010, 7:56 PM
Future Mayor's Avatar
Future Mayor Future Mayor is offline
Vote for me in 2019!
 
Join Date: Jun 2007
Location: Salt Lake City, UT
Posts: 4,803
Quote:
Originally Posted by delts145 View Post
P.G. convention center not dead, not coming soon

http://heraldextra.com/news/local/north/...f119456-fc13-5b68-afea-7a44f44ae066.html

After three and a half years of promises, Pleasant Grove city staff are urging impatient elected officials not to give up faith that a convention center really will be built.

But it may take another three or four years, staff said.


It's not hard to see why elected officials might now be a tad weary of keeping the faith. The long-anticipated Embassy Suites Hotel in Pleasant Grove was announced in January 2007 with promises of more than 400 jobs, 520 hotel rooms and 100,000 square feet of conference space. Construction was to begin in June 2007, ready to open by October 2008...

.
This is what is difficult in the outlook of political years and planning years. Elected officials get impatient when something doesn't happen RIGHT NOW, during there term in office, while staff/planners see things in smaller steps and in terms of planning years, which often times are much further down the road than 4 years.
Reply With Quote
     
     
  #1787  
Old Posted May 11, 2010, 12:18 AM
TonyAnderson's Avatar
TonyAnderson TonyAnderson is offline
.
 
Join Date: Jun 2009
Location: Salt Lake City | Utah
Posts: 2,788
Does anyone here really think they're going to build a Convention Center there right after the County Convention Center is finished in Provo? That project is dead I think. Time to start looking at what else they can put there while the land is cleared.
__________________
Instagram | Twitter

www.UtahProjects.info
Reply With Quote
     
     
  #1788  
Old Posted May 11, 2010, 12:41 AM
i-215's Avatar
i-215 i-215 is offline
Exit 298
 
Join Date: Sep 2003
Location: Inland Empire (CA)
Posts: 3,488
Quote:
Originally Posted by UTPlanner View Post
I was living in in Provo when they covered portions of a canal in and around the BYU campus. A portion ran right outside my apartment door. It was great to have the running water and the occassional duck, but older canals are very inefficient at transporting water. By piping a canal you have far less leakage and you're not losing water to evaporation. I can understand the logic in burying it though losing the creek like environment is disappointing.
Dude! I was living there at the same time. Were you in Heritage during 2003/2004?
__________________
I've stopped caring. Good luck, America
Reply With Quote
     
     
  #1789  
Old Posted May 11, 2010, 3:03 PM
UTPlanner's Avatar
UTPlanner UTPlanner is offline
Registered User
 
Join Date: Dec 2007
Posts: 941
No, I lived in the super classy Stadium Terrace Apts. just north of the stadium on Canyon Road.
Reply With Quote
     
     
  #1790  
Old Posted May 12, 2010, 9:55 PM
poodledoodledude's Avatar
poodledoodledude poodledoodledude is offline
Registered User
 
Join Date: Apr 2007
Posts: 102
Quote:
Originally Posted by delts145 View Post
P.G. convention center not dead, not coming soon

http://heraldextra.com/news/local/north/...f119456-fc13-5b68-afea-7a44f44ae066.html

After three and a half years of promises, Pleasant Grove city staff are urging impatient elected officials not to give up faith that a convention center really will be built.

But it may take another three or four years, staff said.


It's not hard to see why elected officials might now be a tad weary of keeping the faith. The long-anticipated Embassy Suites Hotel in Pleasant Grove was announced in January 2007 with promises of more than 400 jobs, 520 hotel rooms and 100,000 square feet of conference space. Construction was to begin in June 2007, ready to open by October 2008...

.
HA!!! did I NOT SAY This would happen?!
face it, hammond is a HORRIBLE developer! he's done this so many times to communities around the country! the guy is talk! this development they want to build is a pipe dream....hate to say it, but i was RIGHT!!

as soon as hammond said he would use his own money and wait for financing, i KNEW it was all talk!

i'm with tonyanderson on this one...why or WHY would they build it after the county is putting one in downtown provo?! crazy hammond....

poodledoodledude
Reply With Quote
     
     
  #1791  
Old Posted May 13, 2010, 6:08 AM
SLC Projects's Avatar
SLC Projects SLC Projects is offline
Bring out the cranes...
 
Join Date: Dec 2006
Location: Salt Lake City
Posts: 6,108
Quote:
Originally Posted by poodledoodledude View Post
HA!!! did I NOT SAY This would happen?!
face it, hammond is a HORRIBLE developer! he's done this so many times to communities around the country! the guy is talk! this development they want to build is a pipe dream....hate to say it, but i was RIGHT!!

as soon as hammond said he would use his own money and wait for financing, i KNEW it was all talk!

i'm with tonyanderson on this one...why or WHY would they build it after the county is putting one in downtown provo?! crazy hammond....

poodledoodledude


Come on, you don't really hate the developer. You just hate where this is being develop. If this so called "pipe dream" was going to get built somewhere in downtown Provo you all would be disappointed that this hasn't started yet.
I do like the county's plan better.
__________________
1. "Wells Fargo Building" 24-stories 422 FT 1998
2. "LDS Church Office Building" 28-stories 420 FT 1973
3. "111 South Main" 24-stories 387 FT 2016
4. "99 West" 30-stories 375 FT 2011
5. "Key Bank Tower" 27-stories 351 FT 1976
Reply With Quote
     
     
  #1792  
Old Posted May 13, 2010, 6:28 AM
TonyAnderson's Avatar
TonyAnderson TonyAnderson is offline
.
 
Join Date: Jun 2009
Location: Salt Lake City | Utah
Posts: 2,788
Quote:
Originally Posted by SLC Projects View Post

Come on, you don't really hate the developer. You just hate where this is being develop. If this so called "pipe dream" was going to get built somewhere in downtown Provo you all would be disappointed that this hasn't started yet.
I do like the county's plan better.
Fortunately, it basically is getting built in downtown Provo. I don't think the hotel will be as nice as they proposed here though.
__________________
Instagram | Twitter

www.UtahProjects.info
Reply With Quote
     
     
  #1793  
Old Posted May 14, 2010, 2:13 AM
poodledoodledude's Avatar
poodledoodledude poodledoodledude is offline
Registered User
 
Join Date: Apr 2007
Posts: 102
Quote:
Originally Posted by SLC Projects View Post

Come on, you don't really hate the developer. You just hate where this is being develop. If this so called "pipe dream" was going to get built somewhere in downtown Provo you all would be disappointed that this hasn't started yet.
I do like the county's plan better.
SLC- actually, nothing could be further from the truth for me. If he ever came to provo wanting to develop, I would run the other way. He's all talk.
Reply With Quote
     
     
  #1794  
Old Posted May 14, 2010, 3:36 PM
delts145's Avatar
delts145 delts145 is offline
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 20,675
Although Poodledude, he has been responsible for a boat load of similar projects thoroughout the U.S. reaching a successful completion and ongoing operation. I think many developers are simply hype oriented. Hammon seems to be quite successful, albeit very conservative. The Pleasant Grove Center will most likely materialize, it's just a matter of how fast and when. This will probably be dictated by the continued growth of Northern and Central Utah Valley. Add another half million people to the Valley and a lot of projects will materialize, many of which we would have never imagined possible.
Reply With Quote
     
     
  #1795  
Old Posted May 22, 2010, 11:11 AM
delts145's Avatar
delts145 delts145 is offline
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 20,675
American Fork has vision for its downtown

http://www.deseretnews.com/article/700034248/American-Fork-has-vision-for-its-downtown.html

AMERICAN FORK––American Fork is looking to plan ahead. Way ahead, as in the year 2040.

After a broad study at the request of city officials, a series of proposals known as the American Fork Vision Plan was presented to the City Council on Thursday night. The plan allows the city's downtown to deal with future growth and traffic increases...


.
Reply With Quote
     
     
  #1796  
Old Posted May 22, 2010, 10:57 PM
SLC Projects's Avatar
SLC Projects SLC Projects is offline
Bring out the cranes...
 
Join Date: Dec 2006
Location: Salt Lake City
Posts: 6,108
Quote:
Originally Posted by poodledoodledude View Post
SLC- actually, nothing could be further from the truth for me. If he ever came to provo wanting to develop, I would run the other way. He's all talk.

He can't be all talk if there are almost 200 Embassy Suites Hotels across the US. I'm just saying if he not only wanted to built a hotel in provo, but ends up doing so with say a urban style 9-story Hotel in downtown, I think you would be for it. But I do get what you are saying. However a lot of developers are just talk, not just this one. I mean just look at all the highrise proposals up and down the Wasatch font that are still yet to happen. Other then the city creek center in downtown salt lake and 222 South Main we are still yet to see ANY other highrise project break ground. I think it's mostly the poor economy, not the developer. IMHO
__________________
1. "Wells Fargo Building" 24-stories 422 FT 1998
2. "LDS Church Office Building" 28-stories 420 FT 1973
3. "111 South Main" 24-stories 387 FT 2016
4. "99 West" 30-stories 375 FT 2011
5. "Key Bank Tower" 27-stories 351 FT 1976
Reply With Quote
     
     
  #1797  
Old Posted May 25, 2010, 11:03 PM
poodledoodledude's Avatar
poodledoodledude poodledoodledude is offline
Registered User
 
Join Date: Apr 2007
Posts: 102
SLC projects--

k, i got it. you made you point.
i got it LOUD and CLEAR.

thank you.
Reply With Quote
     
     
  #1798  
Old Posted Jun 5, 2010, 11:23 AM
delts145's Avatar
delts145 delts145 is offline
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 20,675
Under new name, credit-card processor opens Utah headquarters - Growth » Accelerated Payments sold off division and is moving to Pleasant Grove.


http://www.sltrib.com/business/ci_15228965

A California-based company that helps businesses process credit-card transactions has sold off its software division, renamed itself and is moving into new headquarters in Pleasant Grove.

.
Reply With Quote
     
     
  #1799  
Old Posted Jun 5, 2010, 11:31 AM
delts145's Avatar
delts145 delts145 is offline
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 20,675
Bittersweet demolition

Demolition on the old Orem High School started Tuesday and will continue through next week as they begin to tear down the main building...

http://heraldextra.com/news/local/article_8f0104db-a681-5cd6-a929-1ec08592999b.html


A demolition crew pulls the boiler out of the basement below where the old shop building once stood at Orem High School as demolition of the old campus continues Friday, June 3, 2010. MARK JOHNSTON/Daily Herald

.
Reply With Quote
     
     
  #1800  
Old Posted Jun 5, 2010, 5:42 PM
John Martin's Avatar
John Martin John Martin is offline
Registered User
 
Join Date: Jan 2009
Posts: 1,195
Are they rebuilding the school?
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > United States > Mountain West
Forum Jump



Forum Jump


All times are GMT. The time now is 2:25 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.