Quote:
Originally Posted by lrt's friend
Weren't curb bus lanes in the proposal for this site?
|
It would certainly appear so from the drawings:
I would note that the bus lane depicted here is an
additional lane; currently there are only two through general traffic lanes. It looks like they'll be taking the right turn lane and making a bus lane out of it by extending it eastwards some unknown distance, and then adding a replacement right turn lane to the north against the property. That fact changes the economics a bit since it's not just a matter of "stealing" a general traffic lane - they're having to move curbs and sidewalks and all the rest.
Just what pedestrians trying to cross Baseline need: another lane (or two, depending on what happens on the other side) to cross without any additional refuge.
Quote:
|
This then poses another question. Is this a temporary measure until the Baseline Transitway is actually built? Obviously, you can't build a centre road Transitway for 1 block and then expect the buses to remerge into traffic and move over to the right lane. There would be no advantage to doing this.
|
Without knowing what the ultimate plan is for Baseline (median busway or curb bus lanes) I can't answer the temporary measure question, but it does seem at least somewhat odd to add a lane as a temporary measure... which makes me think that the bus lanes are the final plan for BRT in this corridor.
Median busways are a bit difficult to phase in; they either get done all in one shot or at least in increments between places where the buses all leave the busway (e.g. at Baseline Station).
Quote:
|
The comments about centre road Transitways starts making me think that this is also a temporary measure and that one day they have LRT in mind where a centre road allignment makes perfect sense. Why is it that Ottawa seems to have adopted this policy of always building Transitways first and then at great expense and disruption, convert them to LRT?
|
If my guess on the curb bus lanes being the final BRT configuration is correct, then a future LRT in the median - which isn't in the TMP, btw - would entail a complete reconstruction of the entire street in addition to the partial reconstruction for curb bus lanes. In all likelihood the median 'transitway' (technically not a correct term since a transitway is supposed to be grade-separated) would be a rails-in-concrete arrangement to allow both rail and buses (and emergency vehicles) to use it.