Quote:
Originally Posted by xAnderblaze
It would be pretty cool if that street car that they just brought back to Heritage park that travels to the parking lot went all the way to heritage station. Approx how much would that cost additionally?
|
$10 million a km plus utility relocation cost, land for and construction of a substation, and another piece or two of rolling stock. While it would be cool, ridership would likely be awful.
Now a collector modern street car (or low floor LRT with lets say 600m stop spacing) running from lets say this route might be worth it as a feeder to Heritage, but you would need to really plan good land use.
It would eventually connect the two southern LRT lines and more than a couple employment nodes. It would certainly set up the auto mall to gradually develop into a suburban office node over time. Full route runs ~9 km. Not sure whether it would be more beneficial to run Rocky View - Heritage or Heritage - Auto Mall as the first phase, with the last phase connecting to the SE LRT sometime after it is done. If you were really diligent about scope creep and cost control (ie: design the track beds for operational speeds of 60 kph and the lightest rolling stock that is viable rather than making it extra future proof) it could work.
Unless there is a trunk sewer or water main under heritage to the extent that it is hard to either be on the other side of the road or in the median to avoid it. Would also need to figure out if it is realistic to run tracks on the west shoulder of 14th St, there are signs marking it as a crude pipeline route, but the pipe could be providing only just much less than in the 80s considering the changes in the refining industry in Alberta.