just noticed this bit from the courier article on the creekside expansion:
"So why reconfigure the park site?
Meehan's explanation is
the city wants to build a large plaza and pier on the waterfront near the Plaza of Nations, which would effectively cut through Concord's property and eliminate its ability to build three highrises on the land.
Knowing that, Concord hired architect Gregory Henriquez to consider a reconfiguration of the park that would allow for the three highrises lost under the city's plaza plan to be moved elsewhere.
Hence, Concord's desire to build three highrises that back up against the Georgia viaduct and reshape the park so it is longer and narrower, still with roughly the same square footage. "There's some issues with it, but overall we think it has a lot of merit," said Meehan, noting the reconfigured design could include a soccer field, a feature not considered in the current shape of the park.
Either way, the park is estimated to cost up to $20 million to build. When built, the park is expected to include a reconstructed seawall, cafe, picnic area, a water play feature, washrooms, storage for dragon boats and access to a non-motorized boat dock."
http://www2.canada.com/vancouvercourier/...40da-855b-e6ba5a96cdfb&p=3#ixzz0muL8gmgi
a pier! great. anyone know more about this?