Quote:
Originally Posted by CLC
One-transfer option is actually provided. Just enjoy the slow scenic ride on tram from Main street! (how long it will take, my guess is 50 minutes)
|
50min? No way. I and many others will continue to drive if that's the case. The current 99B takes around 45min from end to end. There is absolutely no improvement in travel times or reliability of the service.
I doubt any students would want a slow "scenic" ride, especially when it's midterm/finals time. They want a fast and efficient rapid transit link that can potentially just take 15-20 min from UBC to Commercial-Broadway on the M-Line, and a reliable system so that they won't be late for classes. And it's nothing "scenic" when it's fall/winter/spring, when it's raining at almost 80% of the time, and when it gets dark at 1630h.
LRT/streetcars in COV should and must be kept out of the scope of the UBC Line project. They're only suitable for commuting within COV. The only idea that I would accept is have the Olympic Line link up with Arbutus Skytrain station and then goes south on the Arbutus ROW towards kerrisdale and Marpole.