Has anyone ever had the CTrain operator who gives everyone the weather forecast and top headlines? I had him the other day, he started telling everyone the forecast as we pulled out of 7th street, continued talking almost all the way to Sunnyside. And wished everyone a good day as he pulled into each station past there.
Quote:
Originally Posted by ssiguy
What will tne the exact length of the CTrain and by 2012 & 2014?
Thanks.
|
46km now according to CT, roughly 48.9km after Saddleridge opens, around 58km after the WLRT opens and then 60.5km or so after Tuscany opens in 2014. I group them like that as I suspect that the NE extension and the WLRT will open at different points of 2012, I can't imagine CT wanting to have to commission and train for two different things at once and if they can keep Saddleridge on schedule it should be before the WLRT.