Has anyone ever had the CTrain operator who gives everyone the weather forecast and top headlines? I had him the other day, he started telling everyone the forecast as we pulled out of 7th street, continued talking almost all the way to Sunnyside. And wished everyone a good day as he pulled into each station past there.

Quote:
Originally Posted by ssiguy View Post
What will tne the exact length of the CTrain and by 2012 & 2014?
Thanks.
46km now according to CT, roughly 48.9km after Saddleridge opens, around 58km after the WLRT opens and then 60.5km or so after Tuscany opens in 2014. I group them like that as I suspect that the NE extension and the WLRT will open at different points of 2012, I can't imagine CT wanting to have to commission and train for two different things at once and if they can keep Saddleridge on schedule it should be before the WLRT.
__________________

Live or work in the Beltline? Check out the Official Beltline web site here
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Calgary > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 12:10 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.