Quote:
Originally Posted by Sir.Humphrey.Appleby
It is a stimulus project no? If so, it has to be done 1 year from today. (or at least all the money has to be out the door)
|
Part of it is. It was a $90M/$90M/$90M split between the 3 levels of gov't that funded the whole CT 'package'. So in my mind its possible they used the federal part for stuff underway already (SE BRT, 7th ave upgrades, GPS system, etc) while the rest will be used for later parts (11th street station, 4 car expansions, traction power upgrades, etc)