HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure


View Poll Results: Based on options for Broadway Corridor Study, what is your preferred choice?
BRT: Commercial to UBC 25 6.16%
LRT A: Commercial to UBC OR Commercial via VCC to UBC 31 7.64%
LRT B: Main St. to UBC AND Commercial to UBC 18 4.43%
RRT: Commercial to UBC OR VCC to UBC 283 69.70%
COMBO: RRT to Arbutus/LRT to Main St via Arbutus 39 9.61%
BUS: Enhanced Bus Service for all buses to UBC 10 2.46%
Voters: 406. You may not vote on this poll

Closed Thread

 
Thread Tools Display Modes
     
     
  #2761  
Old Posted Mar 24, 2010, 5:47 PM
CLC CLC is offline
Registered User
 
Join Date: Apr 2008
Posts: 877
^ I would want a East-West bus route that is busy both ways all day, says, on 41th ave or some BCIT-UBC route, to experiment with Streetcar first before a North-South route. The N-S transit pattern is too one-directional (going north) from 5am through noon, may not be the best utilization of resources.
     
     
  #2762  
Old Posted Mar 24, 2010, 7:01 PM
BCPhil BCPhil is offline
Registered User
 
Join Date: Jun 2009
Location: Surrey
Posts: 2,578
^ East-West routes, like the 41 and 49, are busy mostly because of the current state of the 99B Line. They basically act as relief for the over crowded 99B Line.

Once Skytrain is extended all the way to UBC, it will be hands down the fastest way to get there. Many people who take local buses all the way to UBC will instead head North to the UBC line on Expo or Canada Line or north-south buses. It was my experience that the 49 left Metrotown full because many people on it are sacrificing their time on the 49 to UBC so they can get a seat, instead of standing on an overcrowded B line.

With the UBC Line, the 20 won't get less busy, in fact it will probably draw new riders to it as it connects at Broadway-Commercial. By investing money on a high capacity streetcar for the #20 it won't be a lost investment if the UBC extension gobbles up a majority of East-West riders.
     
     
  #2763  
Old Posted Mar 24, 2010, 7:06 PM
WarrenC12's Avatar
WarrenC12 WarrenC12 is online now
Registered User
 
Join Date: May 2007
Location: East OV!
Posts: 24,690
I agree with BC Phil on the 99B situation and E-W traffic.

Prime areas for LRT would be replacements for the #20, and E-W from Waterfront Centre down Hastings as far as possible.

King George is another priority, ideally as far as White Rock.
     
     
  #2764  
Old Posted Mar 24, 2010, 7:22 PM
Zassk Zassk is offline
Registered User
 
Join Date: Sep 2009
Posts: 2,303
^ Any Hastings LRT line that is built should also extend west as far as Denman... and ideally turn down Denman to Davie too. It is a shame we don't have some kind of rapid transit to the west end, and we should sieze any opportunities for it.

Hey, since we're discussing candidates for LRT, what about Willingdon?
     
     
  #2765  
Old Posted Mar 24, 2010, 7:50 PM
cabotp cabotp is offline
Registered User
 
Join Date: Mar 2009
Location: Vancouver, BC
Posts: 2,813
Quote:
Originally Posted by BCPhil View Post
^ East-West routes, like the 41 and 49, are busy mostly because of the current state of the 99B Line. They basically act as relief for the over crowded 99B Line.

Once Skytrain is extended all the way to UBC, it will be hands down the fastest way to get there. Many people who take local buses all the way to UBC will instead head North to the UBC line on Expo or Canada Line or north-south buses. It was my experience that the 49 left Metrotown full because many people on it are sacrificing their time on the 49 to UBC so they can get a seat, instead of standing on an overcrowded B line.
This is the biggest reason why I feel the UBC extension has to go all the way to UBC. And not just to Arbutus.

Hopefully after the UBC extension is built. The only people who would use the 41,43,49 routes are those that either live along those routes or have a destination along those routes.
     
     
  #2766  
Old Posted Mar 24, 2010, 8:11 PM
twoNeurons twoNeurons is offline
loafing in lotusland
 
Join Date: Aug 2002
Location: Lotusland
Posts: 6,119
I think they'd still use the train.
The B-Line takes ~20 minutes through a relatively low traffic area from Arbutus to UBC.
The #41,49 takes ~55 minutes.

Even with the additional 15 minutes by train, your time saved is greater than 10 minutes. I just don't see the immediate need for a train all the way to UBC at this time. We'd have much better bang for buck with a train + bus system.

The only negative I can see is that LRT proponents would argue that LRT would've gone all the way for the same price. Whether that's true or not is anyone's guess.

I'm looking forward to the results from the corridor study. When is it due again?
     
     
  #2767  
Old Posted Mar 24, 2010, 8:32 PM
Zassk Zassk is offline
Registered User
 
Join Date: Sep 2009
Posts: 2,303
41,49 take 55 minutes from Arbutus to UBC? Since when? They were nearly as fast as the 99B when I used to take these buses 10 years ago. What changed?

Anyway, I think it's insane to build any amount of rail on Broadway and to stop it short of UBC. IMO it would be like building C-line not-quite-to YVR. UBC isn't just some average college campus, it's a massive transit destination, and one of the fastest growing residential neighbourhoods as well. I believe one of the studies linked last week shows that it's a bigger transit destination than Central Broadway itself.

Truthfully, UBC should be counted as one of the town centres in the region, and probably would have been, had it been part of an incorporated municipality.
     
     
  #2768  
Old Posted Mar 25, 2010, 5:25 PM
whatnext whatnext is offline
Registered User
 
Join Date: Feb 2009
Location: Vancouver
Posts: 28,007
Quote:
Originally Posted by GeeCee View Post
Council favoring taking the streetcar to UBC rather than skytrain?

Streetcar technology could come to Broadway corridor


http://www.news1130.com/news/local/artic...chnology-could-come-to-broadway-corridor
Troubling, and it certainly sounds that Gregor the Green is leaning that way:

...Mr. Robertson said the best bet for the return of streetcars could be as part of a transit system running along Broadway, possibly built some time after the Evergreen Line is running in 2014. "It will take years to bring back," said Mr. Robertson, noting his bottom line on the issue is to wait for TransLink and the province to join the city in exploring solutions...
http://www.theglobeandmail.com/news/nati...bye-to-olympic-streetcar/article1507703/

Indeed, I found the wording on the City survey biased toward a streetcar system. Did anyone else feel that way?

Last edited by whatnext; Mar 25, 2010 at 6:03 PM. Reason: Forgot to add link to article
     
     
  #2769  
Old Posted Mar 25, 2010, 5:50 PM
WarrenC12's Avatar
WarrenC12 WarrenC12 is online now
Registered User
 
Join Date: May 2007
Location: East OV!
Posts: 24,690
Quote:
Originally Posted by whatnext View Post
Troubling, and it certainly sounds that Gregor the Green is leaning that way:

...Mr. Robertson said the best bet for the return of streetcars could be as part of a transit system running along Broadway, possibly built some time after the Evergreen Line is running in 2014. "It will take years to bring back," said Mr. Robertson, noting his bottom line on the issue is to wait for TransLink and the province to join the city in exploring solutions...

Indeed, I found the wording on the City survey biased toward a streetcar system. Did anyone else feel that way?
I don't know why they are departing from the original Granville Island to Stanley Park plan and thinking now this will be a replacement for the UBC line.
     
     
  #2770  
Old Posted Mar 25, 2010, 5:52 PM
twoNeurons twoNeurons is offline
loafing in lotusland
 
Join Date: Aug 2002
Location: Lotusland
Posts: 6,119
Quote:
Originally Posted by Zassk View Post
41,49 take 55 minutes from Arbutus to UBC? Since when? They were nearly as fast as the 99B when I used to take these buses 10 years ago. What changed?
From Joyce SkyTrain (not Arbutus) to UBC takes 55 minutes according to Translink's trip planner.

A SkyTrain + Bus from Arbutus would probably be about 40-45 minutes

Quote:
Anyway, I think it's insane to build any amount of rail on Broadway and to stop it short of UBC. IMO it would be like building C-line not-quite-to YVR.
But if it's the difference between getting it built and not getting it built...
     
     
  #2771  
Old Posted Mar 25, 2010, 6:40 PM
lezard lezard is offline
Closed account
 
Join Date: Jun 2008
Posts: 143
Quote:
Originally Posted by WarrenC12 View Post
I don't know why they are departing from the original Granville Island to Stanley Park plan and thinking now this will be a replacement for the UBC line.
A streetcar was always one of the options the Province and Translink have been considering since they started planning for the UBC Line.

We all would like to see an extension of the Millenium Line as the ideal UBC Line choice, but it remains only one of the options on the table.
     
     
  #2772  
Old Posted Mar 25, 2010, 7:33 PM
twoNeurons twoNeurons is offline
loafing in lotusland
 
Join Date: Aug 2002
Location: Lotusland
Posts: 6,119
I hope they have at least a minimum option of an M-Line SkyTrain connection to the Canada Line. Even if it stops short, it is a major handicap in really opening up transportation.
     
     
  #2773  
Old Posted Mar 25, 2010, 7:40 PM
CLC CLC is offline
Registered User
 
Join Date: Apr 2008
Posts: 877
Quote:
Originally Posted by whatnext View Post
Indeed, I found the wording on the City survey biased toward a streetcar system. Did anyone else feel that way?
No doubt about it. I saw it coming that it will steers towards "streetcar for Broadway rapid transit" movement. That's why I disliked free streetcar demonstration from day 1, which is running own ROW with only one crossing that could illustrate nothing about common drawbacks of streetcar (excepts there was a minor crash).
     
     
  #2774  
Old Posted Mar 25, 2010, 8:11 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,763
The M-Line should at least run the length of the Broadway office corridor - to Granville or Arbutus.
West of there is up for grabs.
     
     
  #2775  
Old Posted Mar 25, 2010, 8:32 PM
Alex Mackinnon's Avatar
Alex Mackinnon Alex Mackinnon is online now
Can I has a tunnel?
 
Join Date: May 2008
Location: East Van
Posts: 2,205
I think the easiest was of doing any type of MLine extension down broadway is to simply run 2 TBMs in the same direction and phase the construction as money becomes available. Once the first few stations open up we'd get a good idea of how much of the additional ridership is actually going to use train and should be a good force in helping drive demand for additional construction. Connecting up for Willow or Granville would be a good starting point for a first phase, getting the connection with the CLine going and opening up central Broadway.
__________________
"It's ok, I'm an engineer!" -Famous last words
     
     
  #2776  
Old Posted Mar 25, 2010, 9:01 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,763
Phasing would be a great approach - especially if it can expedite the M-Line connection to the Canada Line.

Of interest:

http://www.thetransportpolitic.com/2010/...ap-solution-to-an-expensive-proposition/
     
     
  #2777  
Old Posted Mar 25, 2010, 9:36 PM
Canadian Mind's Avatar
Canadian Mind Canadian Mind is offline
Registered User
 
Join Date: Aug 2006
Posts: 3,907
Yea, but wouldn't the costs of having 2 TBMs severely offset the initial savings from phasing it? Would one large TBM not do a better job, or a TBM that bored from VCC-Clark to Canada Line, was hauled along the tunnel back, then bores the other tunnel? Least that way by the time it is done boring phase 1, funding for phase 2 might be underway.
__________________
"you're eating chicken periods" - Vid
"I love eggs, especially the ones with runny yolks" - Me
"EWWWWWWWWWWWWWWWWWWWWWW, you're disgusting!" - Vid
     
     
  #2778  
Old Posted Mar 25, 2010, 10:02 PM
Alex Mackinnon's Avatar
Alex Mackinnon Alex Mackinnon is online now
Can I has a tunnel?
 
Join Date: May 2008
Location: East Van
Posts: 2,205
I think if you were to only have one main tunnel you would still have to dig a parallel service tunnel in case of emergency, but I'm not too sure of safety regs. I'm just a graduating engineering student, so if anyone actually know the regs it would be a nice thing find out.
__________________
"It's ok, I'm an engineer!" -Famous last words
     
     
  #2779  
Old Posted Mar 25, 2010, 11:00 PM
mrjauk mrjauk is offline
Registered User
 
Join Date: Oct 2008
Posts: 555
Quote:
Originally Posted by twoNeurons View Post
I hope they have at least a minimum option of an M-Line SkyTrain connection to the Canada Line. Even if it stops short, it is a major handicap in really opening up transportation.
I couldn't agree more. This would make the three lines all interconnected, which would increase ridership in a non-linear fashion.
     
     
  #2780  
Old Posted Mar 25, 2010, 11:41 PM
flight_from_kamakura's Avatar
flight_from_kamakura flight_from_kamakura is offline
testify
 
Join Date: Mar 2008
Location: san francisco and montreal
Posts: 1,319
Quote:
Originally Posted by whatnext View Post
I found the wording on the City survey biased toward a streetcar system. Did anyone else feel that way?
i didn't think so, personally, if anything i thought it sort of skewed pro alrt.

Quote:
Originally Posted by officedweller View Post
The M-Line should at least run the length of the Broadway office corridor - to Granville or Arbutus.
West of there is up for grabs.
i agree. a full m-line extension would be fantastic, but running it to arbutus would agree with the residents/merchants out there and save hundreds of millions of dollars. on the bright side, we could even imagine a hub of sorts developing as lrt to ubc and along the arbutus corridor are built out.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 10:56 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.