  #101  
Old Posted Mar 10, 2010, 9:47 PM
Coldrsx's Avatar
Coldrsx Coldrsx is online now
Community Guy
 
Join Date: Dec 2003
Location: Edmonton, AB
Posts: 69,078
^if i recall they are more or less just replacing what was there but not upgrading the exterior envelope or raising the R value of the wall spandrel.
__________________
"The destructive effects of automobiles are much less a cause than a symptom of our incompetence at city building" - Jane Jacobs 1961ish

Wake me up when I can see skyscrapers
Reply With Quote
     
     
  #102  
Old Posted Mar 11, 2010, 1:57 AM
niwell's Avatar
niwell niwell is online now
sick transit, gloria
 
Join Date: Nov 2004
Location: Roncesvalles, Toronto
Posts: 11,628
Quote:
Originally Posted by Coldrsx View Post
it is unfortunate though that they are not addressing sustainability in this renewal very much.
The project is aiming for LEED certification, what level exactly is unclear. Probably silver, but still much better than the original building.

From the FAQ on the website: (http://www.redefiningfirst.com/Overview/FAQ.aspx#sustainability-1)

Quote:
Is this a green project? Will there be green or sustainable features?

Yes. We anticipate that the building will receive LEED©-EB:OM certification at the conclusion of the renovation project. In addition to energy conservation measures, infrastructure upgrades include security systems upgrades, elevator modernization, new high-efficiency HVAC chillers, digital controls, modernized lighting, high-efficiency toilets and faucets. A fundamental principle behind FCP's rejuvenation project has been sustainability and setting a new standard for eco-efficiency.
Reply With Quote
     
     
  #103  
Old Posted Mar 12, 2010, 12:42 PM
caltrane74's Avatar
caltrane74 caltrane74 is offline
gettin' rich!
 
Join Date: Aug 2002
Location: Toronto
Posts: 34,204
I didnt know they were aiming for allthat with this rebuild....

interesting....
Reply With Quote
     
     
  #104  
Old Posted Mar 14, 2010, 10:43 PM
caltrane74's Avatar
caltrane74 caltrane74 is offline
gettin' rich!
 
Join Date: Aug 2002
Location: Toronto
Posts: 34,204
doing this canyon update was good, I actually got some work in here..

Reply With Quote
     
     
  #105  
Old Posted Mar 15, 2010, 9:40 PM
caltrane74's Avatar
caltrane74 caltrane74 is offline
gettin' rich!
 
Join Date: Aug 2002
Location: Toronto
Posts: 34,204
more FCP by me

Reply With Quote
     
     
  #106  
Old Posted Mar 21, 2010, 12:16 AM
caltrane74's Avatar
caltrane74 caltrane74 is offline
gettin' rich!
 
Join Date: Aug 2002
Location: Toronto
Posts: 34,204
by me


Reply With Quote
     
     
  #107  
Old Posted Mar 21, 2010, 1:09 AM
1ajs's Avatar
1ajs 1ajs is offline
ʇɥƃıuʞ -*ʞpʇ*-
 
Join Date: Jul 2005
Location: lynn lake
Posts: 26,520
taking their sweeet time getting the scaftholding up eh? wonder if this thing will creat a shortage of the stuff
Reply With Quote
     
     
  #108  
Old Posted Mar 21, 2010, 1:46 AM
Traynor's Avatar
Traynor Traynor is offline
Back to Basics
 
Join Date: Oct 2009
Posts: 1,226
Quote:
Originally Posted by 1ajs View Post
taking their sweeet time getting the scaftholding up eh? wonder if this thing will creat a shortage of the stuff
It's NOT going to cover the whole building. Each of the eight platforms will be about three floors high and raised to the top of the building by cables from derricks on the roof. They will then be lowered as they progress through the replacement of all the panels.

As described by Joseph on UT who is working on the project.

Let's all watch the video again and see!

(Click on animation at the lower left)

http://www.redefiningfirst.com/Overview/Vision.aspx
Reply With Quote
     
     
  #109  
Old Posted Mar 21, 2010, 10:21 AM
caltrane74's Avatar
caltrane74 caltrane74 is offline
gettin' rich!
 
Join Date: Aug 2002
Location: Toronto
Posts: 34,204
Complex stuff didnt realize it was gonna be all hitech like that.. But still I would like'em to pick up the flicking pace already..
Reply With Quote
     
     
  #110  
Old Posted Mar 21, 2010, 3:54 PM
steve61's Avatar
steve61 steve61 is offline
Registered User
 
Join Date: May 2008
Posts: 87
possibly a stupid question, but is there any reason they didn't start at the top?
Reply With Quote
     
     
  #111  
Old Posted Mar 21, 2010, 4:36 PM
Traynor's Avatar
Traynor Traynor is offline
Back to Basics
 
Join Date: Oct 2009
Posts: 1,226
Quote:
Originally Posted by steve61 View Post
possibly a stupid question, but is there any reason they didn't start at the top?
In light of what I just wrote and displayed on the video... Yes that was a stupid question. LOL

The ARE going to be starting at the top. They are only constructing the three-floor platforms on the ground, then hoisting them into place at the top and spiraling their way down.

Reply With Quote
     
     
  #112  
Old Posted Mar 21, 2010, 4:46 PM
steve61's Avatar
steve61 steve61 is offline
Registered User
 
Join Date: May 2008
Posts: 87
Quote:
Originally Posted by Traynor View Post
In light of what I just wrote and displayed on the video... Yes that was a stupid question. LOL

The ARE going to be starting at the top. They are only constructing the three-floor platforms on the ground, then hoisting them into place at the top and spiraling their way down.


i wasn't referring to the scaffolding at the base. and i watched the video when it was originally posted.

I was talking about the marble panels already removed near, but not at, the top of the building (at the BMO sign level). Why did they begin there as opposed to the top?
Reply With Quote
     
     
  #113  
Old Posted Mar 21, 2010, 4:56 PM
Traynor's Avatar
Traynor Traynor is offline
Back to Basics
 
Join Date: Oct 2009
Posts: 1,226
OH... My apologies.

I was wondering this myself. Perhaps because that area was more finicky and they thought they would get a head start. So when the scaffold is in place at the top, they can just do the procedure in one smooth continuous motion.

I should ask Joseph over at UT. He'll have the real answer.

Reply With Quote
     
     
  #114  
Old Posted Mar 21, 2010, 4:58 PM
steve61's Avatar
steve61 steve61 is offline
Registered User
 
Join Date: May 2008
Posts: 87
Quote:
Originally Posted by Traynor View Post
OH... My apologies.

I was wondering this myself. Perhaps because that area was more finicky and they thought they would get a head start. So when the scaffold is in place at the top, they can just do the procedure in one smooth continuous motion.

I should ask Joseph over at UT. He'll have the real answer.

sounds good. it's been bugging my OCD since they began.
Reply With Quote
     
     
  #115  
Old Posted Mar 22, 2010, 1:20 AM
caltrane74's Avatar
caltrane74 caltrane74 is offline
gettin' rich!
 
Join Date: Aug 2002
Location: Toronto
Posts: 34,204
by me

Video Link
Reply With Quote
     
     
  #116  
Old Posted Mar 25, 2010, 11:37 PM
caltrane74's Avatar
caltrane74 caltrane74 is offline
gettin' rich!
 
Join Date: Aug 2002
Location: Toronto
Posts: 34,204
by me



Video Link

Last edited by caltrane74; Mar 26, 2010 at 12:05 AM.
Reply With Quote
     
     
  #117  
Old Posted Mar 27, 2010, 2:42 AM
caltrane74's Avatar
caltrane74 caltrane74 is offline
gettin' rich!
 
Join Date: Aug 2002
Location: Toronto
Posts: 34,204
full update tomorrow

Reply With Quote
     
     
  #118  
Old Posted Mar 30, 2010, 5:28 PM
caltrane74's Avatar
caltrane74 caltrane74 is offline
gettin' rich!
 
Join Date: Aug 2002
Location: Toronto
Posts: 34,204
Here's the latest construction update from Brookfield:


March 27 through April 3, 2010

The following is work scheduled to take place at First Canadian Place. Please note, crews will
not be working Friday April 2, 2010.

Tower Exterior – East Face
o Weather permitting, cross-bracing and permanent decks will be installed
on the four (4) pole scaffold on floors 11-20 by April 3, 2010.

Tower Exterior – West Face
o Weather permitting, the four (4) pole scaffolding will reach the floors 65
through to the roof-top by April 3, 2010.
o Work on the Suspended Elevated Platforms (SEP) will be on-going on
floors 3 through 7. Work is completed during the day and throughout
the evening.

Tower Exterior – North Face
o Work on the Suspended Elevated Platforms (SEP) will be on-going on
floors 3 through 9. Work in this area is expected to be complete April
16, 2010. Work is completed during the day and throughout the
evening.


Tower Exterior – South Face
o Work on the Suspended Elevated Platforms (SEP) will be on-going on
floors 3 through 7. Work is completed during the day and throughout
the evening.


Tower Exterior – King Street West, Street Level
o No work is anticipated in this area.


Tower Exterior – 73rd floor, Penthouse Rooftop
o Weather permitting, roof scaffolding and motor placement will occur
through April 3, 2010. Intermittent noise may be assoicated with this
work.

o Interior “Market Place” – Concourse Level
o Until April 3, 2010, the east-west main corridor in the Market Place will
be closed to pedestrian traffic. Access to the remaining food outlets and
the Exchange Tower is by means of the north-south corridor by
Timothy’s.
o NOW OPEN in the Market Place are: Timothy’s, Naturally Yours
(temporary location), HoShim Take-out and The Great Canadian Bagel
(NEW location).
o Closed for renovations are: Greenleaf’s, Furama, Soup It Up (new
location), Decadent Desserts (new location) and Rocky Mountain
Chocolate Factory. Most of these foods outlets will be open for business
by the end of May 2010.
o Longo’s is scheduled to open on the south side of the Market Place, in
Summer 2010.

NOTICE OF LANE REDUCTION(S)
o There will be a crane lift on Adelaide St.W., from 7:00 am until 1:00
p.m. on Saturday, March 27, 2010. This will necessitate a lane closure in
the immediate work area only. Access to the building via the doors by
PLUS ONE (Adelaide St.W., east-most building entrance) may be
temporarily impeded during the lift operation.
o Inspection crews will be working on a boom lift on each Adelaide St.W.,
Bay St. and King St W., from 7:00 p.m. until 2:00 a.m. on each Monday,
March 29 through Thursday April 1 and Saturday April 3, 2010. Lanes
will be restricted in the immediate area.
Reply With Quote
     
     
  #119  
Old Posted Apr 13, 2010, 11:25 PM
caltrane74's Avatar
caltrane74 caltrane74 is offline
gettin' rich!
 
Join Date: Aug 2002
Location: Toronto
Posts: 34,204
by me



Video Link
Reply With Quote
     
     
  #120  
Old Posted Apr 14, 2010, 2:04 AM
anton"n"TO anton"n"TO is offline
Registered User
 
Join Date: Mar 2010
Posts: 100
omg thats alot of friggin work there doing on fcp
i wonder how long it will take...
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Toronto
Forum Jump



Forum Jump


All times are GMT. The time now is 6:04 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.