HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Calgary > Transportation & Infrastructure


Closed Thread

 
Thread Tools Display Modes
     
     
  #181  
Old Posted Mar 16, 2010, 12:11 AM
frinkprof's Avatar
frinkprof frinkprof is offline
Registered User
 
Join Date: Sep 2006
Location: The Gary
Posts: 4,865
Nevermind.

Last edited by frinkprof; May 22, 2010 at 1:34 PM.
     
     
  #182  
Old Posted Mar 16, 2010, 5:05 PM
yads yads is offline
Registered User
 
Join Date: Nov 2006
Posts: 109
Can anyone tell me how early to the westside rec and sirocco drive lots fill up in the mornings? They're free, so I'm guessing quite early.
     
     
  #183  
Old Posted Mar 16, 2010, 5:11 PM
You Need A Thneed's Avatar
You Need A Thneed You Need A Thneed is offline
Construction Enthusiast
 
Join Date: Feb 2007
Location: Castleridge, NE Calgary
Posts: 5,892
How long have all the SD160s had LED interior lighting? Weren't they fluorescent to start?

I rode to the hockey game and back, and every car that I saw had LED interior lighting - LED replacement tubes that fit into the fixtures intended for fluorescent bulbs.
     
     
  #184  
Old Posted Mar 16, 2010, 5:21 PM
frinkprof's Avatar
frinkprof frinkprof is offline
Registered User
 
Join Date: Sep 2006
Location: The Gary
Posts: 4,865
Nevermind.

Last edited by frinkprof; May 22, 2010 at 1:34 PM.
     
     
  #185  
Old Posted Mar 16, 2010, 5:42 PM
You Need A Thneed's Avatar
You Need A Thneed You Need A Thneed is offline
Construction Enthusiast
 
Join Date: Feb 2007
Location: Castleridge, NE Calgary
Posts: 5,892
Quote:
Originally Posted by frinkprof View Post
I think most of the SD160s had LED interior lighting my mid-2009. The installations started in late 2008.
Shows how much I ride the train.

The bulbs probably have just about paid for themselves by now then.
     
     
  #186  
Old Posted Mar 16, 2010, 6:49 PM
mooky mooky is offline
Registered User
 
Join Date: Sep 2008
Posts: 482
I was thinking, making City Hall a double platform station makes for a great transfer and hub point.... but doesn't by bringing the 3rd street station west, it also help create the same bottle neck they just removed over at 8th street west by moving it one block? That is to reduce head-ways into and out of the core at track switch points?

Maybe I'm wrong, please correct me if I am.
     
     
  #187  
Old Posted Mar 16, 2010, 7:47 PM
DarkKeyo DarkKeyo is offline
Transit/Cartography Geek
 
Join Date: May 2008
Location: Burnaby
Posts: 332
Quote:
Originally Posted by mooky View Post
I was thinking, making City Hall a double platform station makes for a great transfer and hub point.... but doesn't by bringing the 3rd street station west, it also help create the same bottle neck they just removed over at 8th street west by moving it one block? That is to reduce head-ways into and out of the core at track switch points?

Maybe I'm wrong, please correct me if I am.
I've also always thought that this would cancel out any time savings from moving 8th st...

I liked the original plan where they had double platforms at 3rd and 8th better than the current plan too. But, I like the new platforms enough that what we got is good enough.
     
     
  #188  
Old Posted Mar 16, 2010, 7:55 PM
mersar's Avatar
mersar mersar is offline
Registered User
 
Join Date: May 2006
Location: Calgary, AB
Posts: 10,083
Quote:
Originally Posted by mooky View Post
I was thinking, making City Hall a double platform station makes for a great transfer and hub point.... but doesn't by bringing the 3rd street station west, it also help create the same bottle neck they just removed over at 8th street west by moving it one block? That is to reduce head-ways into and out of the core at track switch points?

Maybe I'm wrong, please correct me if I am.
It won't really introduce a new bottleneck, the existing one will just remain. Due to the timings of the lights and the fact there is a road to cross (which there wasn't before the old 8th Street SW) there aren't too many trains that get stuck waiting for 2nd Street SE that I've noticed, usually you're waiting on the east side of 3rd Street then straight through to Olympic Plaza on a green at both 3rd and 2nd
__________________

Live or work in the Beltline? Check out the Official Beltline web site here
     
     
  #189  
Old Posted Mar 17, 2010, 4:03 PM
frinkprof's Avatar
frinkprof frinkprof is offline
Registered User
 
Join Date: Sep 2006
Location: The Gary
Posts: 4,865
Nevermind.

Last edited by frinkprof; May 22, 2010 at 1:34 PM.
     
     
  #190  
Old Posted Mar 17, 2010, 4:36 PM
freeweed's Avatar
freeweed freeweed is offline
Home of Hyperchange
 
Join Date: Sep 2006
Location: Dynamic City, Alberta
Posts: 17,568
Quote:
Originally Posted by frinkprof View Post
What I'm not sure of though, regarding the NW extension, is if this means that it will not be delayed or not be further delayed, since it was already pushed back to 2014. So will it now be bumped up, or remain at a 2014 completion date? Anyone know? I've already checked the XRT blog and project page which haven't been updated.
What I can't figure out is this:

In 2011, Crowchild @ Stoney opens. Fully. With no further work to be done. Which means the LRT bridges and rails are completely in place.

Why will it take 3 freaking years to lay down some track and build a station? Considering the major interchange is done, it should be FASTER than most stations, not slower.

I have to assume it's because of some financing model where only $X is budgeted per year. Why not just total it up and build the damn thing at once, instead of tying up traffic for 3 more years? Vegas can build multi-billion dollar resorts that are a hell of a lot more complex than an LRT station and some track in less than 3 years. I really have a hard time understanding why LRT work takes so long in this city.

Well, I don't, because I've watched the 7th Ave stations sit fallow for days and sometimes weeks at a stretch, so their one year build time really comes down to poor planning more than anything else.

It's just frustrating. Line your ducks up and GO. Don't inconvenience everyone longer than necessary.
     
     
  #191  
Old Posted Mar 17, 2010, 4:45 PM
frinkprof's Avatar
frinkprof frinkprof is offline
Registered User
 
Join Date: Sep 2006
Location: The Gary
Posts: 4,865
Nevermind.

Last edited by frinkprof; May 22, 2010 at 1:35 PM.
     
     
  #192  
Old Posted Mar 17, 2010, 4:45 PM
You Need A Thneed's Avatar
You Need A Thneed You Need A Thneed is offline
Construction Enthusiast
 
Join Date: Feb 2007
Location: Castleridge, NE Calgary
Posts: 5,892
Frink, I was wondering the same thing about the NW extension. Also, the same regarding the Metis/64th interchange, as the Herald article mentions that too. Perhaps that will go ahead now, instead of just being left as an intersection with a grade separation for the LRT.

Freeweed, the delay was money related. The city has said that it's delayed due to the money coming from the province slower. The interchange will be completed right away to reduce the major impact on traffic as soon as possible.
     
     
  #193  
Old Posted Mar 17, 2010, 6:41 PM
TETT2 TETT2 is offline
Registered User
 
Join Date: Mar 2007
Posts: 71
Quote:
Originally Posted by frinkprof View Post
The bolded part is basically the cause of this so far as I can understand. Speaking to XRT specifically, after the project was delayed (again, due to a change in the financing flow structure), the schedule for the LRT work was changed so that it wouldn't begin until 2012. So technically it wouldn't be taking 3 years to finish the track and way and station site work. Of course, that may all have changed again, or not. Not sure.

Ultimately, this really highlights the climate of uncertain funding we're in.
I still think the Tuscany/Rocky Ridge Station is a waste... Could have use the money elsewhere for things such as bus lanes and such.
     
     
  #194  
Old Posted Mar 17, 2010, 9:38 PM
lubicon's Avatar
lubicon lubicon is offline
Suburban dweller
 
Join Date: Jun 2003
Location: Calgary - our road planners are as bad as yours Edmonton
Posts: 5,047
Quote:
Originally Posted by TETT2 View Post
I still think the Tuscany/Rocky Ridge Station is a waste... Could have use the money elsewhere for things such as bus lanes and such.
I live in Tuscany and would have to prety much agree with you. The one good thing that this project did was force the province's hand into upgrading the Stoney / Crowchild interchange into it's ultimate configuration. Without the LRT extension to Tuscany/RRRO we would have had traffic lights on the Crowchild portion of this interchange for many more years.
__________________
Two things are infinite: the universe and human stupidity; and I'm not sure about the the universe.

Albert Einstein
     
     
  #195  
Old Posted Mar 18, 2010, 3:55 AM
SmokWawelski SmokWawelski is offline
Registered User
 
Join Date: May 2009
Posts: 154
If they can run an LRT line all the way down to the end of Calgary's south, so the Okotoks and surrounding area crowd can get to work faster why not run it to the end of NW Calgary. I live in Royal Oak, and I've been waiting for this LRT for years. It would be a 10 minute enjoyable walk from my house to the station Now let's get this thing built as soon as possible. No more delays.....
     
     
  #196  
Old Posted Mar 18, 2010, 5:06 AM
MasterG's Avatar
MasterG MasterG is offline
Registered User
 
Join Date: Jan 2009
Location: Calgary
Posts: 1,820
Quote:
Originally Posted by SmokWawelski View Post
If they can run an LRT line all the way down to the end of Calgary's south, so the Okotoks and surrounding area crowd can get to work faster why not run it to the end of NW Calgary. I live in Royal Oak, and I've been waiting for this LRT for years. It would be a 10 minute enjoyable walk from my house to the station Now let's get this thing built as soon as possible. No more delays.....
The people on the on the west side have been waiting for their WLRT for alot longer than rocky ridge has even existed Only 3 more years....
     
     
  #197  
Old Posted Mar 18, 2010, 5:07 AM
freeweed's Avatar
freeweed freeweed is offline
Home of Hyperchange
 
Join Date: Sep 2006
Location: Dynamic City, Alberta
Posts: 17,568
Quote:
Originally Posted by SmokWawelski View Post
If they can run an LRT line all the way down to the end of Calgary's south, so the Okotoks and surrounding area crowd can get to work faster why not run it to the end of NW Calgary. I live in Royal Oak, and I've been waiting for this LRT for years. It would be a 10 minute enjoyable walk from my house to the station Now let's get this thing built as soon as possible. No more delays.....
Bingo. Crowfoot is in the middle of freaking nowhere and everyone has to bus to it. OK, so some of the NIMBYs in Scenic Acres might walk to it (those that aren't lobbying for that ridiculous bus-only access to the PnR...), but beyond that it's a car-oriented LRT station. Bus at the very least.

Tuscany, Rocky Ridge, and Royal Oak will have thousands of people within walking distance of the station. And a lot of LRT riders too, with the multifamily concentration close to Crowchild. Hell, I'll be 30-45 mins walk away (about as far away as you can get) and I can easily see myself walking to and from it when the weather's nice.

So many LRT extensions lately have been to commercial/industrial developments (hi Westwinds!), it's about time we have a new station built that's actually CLOSE TO WHERE PEOPLE LIVE.
     
     
  #198  
Old Posted Mar 18, 2010, 2:31 PM
You Need A Thneed's Avatar
You Need A Thneed You Need A Thneed is offline
Construction Enthusiast
 
Join Date: Feb 2007
Location: Castleridge, NE Calgary
Posts: 5,892
There's a sign up advertising an open house - regarding an upgrade to Whitehorn Station. Will have to check out the date of the open house later today. So, it seems like there is something to those rumours from last year.

EDIT: Here's the information

OPEN HOUSE
Whitehorn LRT Station upgrades
March 31, 2010
6:30 to 8:30 pm
Whitehorn Community Centre.
228 Whitehorn Road NE

Last edited by You Need A Thneed; Mar 18, 2010 at 4:58 PM.
     
     
  #199  
Old Posted Mar 19, 2010, 1:56 AM
Ferreth Ferreth is offline
IMHO
 
Join Date: Apr 2009
Location: Calgary
Posts: 882
I'm of the opinion that that City should not have committed to building LRT so far out in the first place. It's just encouraging the kind of sprawl that the city says it wants to limit. In the medium term, the NW line should have been capped at Crowfoot. South should have been capped at Fish Creek. NE is just to the point of justifying the McKnight - Westwinds.

The current expansions in the NW and NE should have been on the 20 year drawing board. 4 car platforms should be being completed NOW. SE LRT should be on the books in the 10 year time frame, however that "Quarry park" area should have been marketed as an initial terminus, with a lot of TOD development rather than high end industrial (I think?).

It's too late for any of this, however - along the same lines of thinking, a longer term plan would be to run a subway up Centre St., planning should be happening NOW to encourage density within 1 block of Centre. I'd be looking at an initial terminus around 32nd Avenue (line jogs to the east to follow Edmonton trail somewhere around 27th Ave) , with the city buying up some of the industrial in the area and moving the bus barns to create another TOD area. I also expect "TOD" to translate into high density living with LRT and basic necessities within walking distance.
__________________
---
My Flickr account
My Ratsofrass blog
     
     
  #200  
Old Posted Mar 19, 2010, 2:11 AM
mersar's Avatar
mersar mersar is offline
Registered User
 
Join Date: May 2006
Location: Calgary, AB
Posts: 10,083
Well just let me disagree with your opinion for a bit

The NW line doesn't really encourage any more sprawl, as there's really no where left to sprawl that wouldn't be developed anyways (there won't be another subdivision build anywhere west of Sarcee for many many years, Rocky Ridge/Royal Oak and Tuscany are all bounded by what will be an impenetrable (to developers) sea of acreages that already exist. Even the current stations in the NE aren't exactly encouraging more development, they're going into already developed areas. If they were to start pushing the line past Saddle Ridge then I would buy into the argument for that area. And in the south most of the area surrounding the south line was already well underway when the extension was built. While some of the new communities further south of the terminus do contribute some ridership, the LRT alone has little influence on their development (I've never seen anyone say they moved to Silverado due to the proximity of the LRT, for that matter the two people I know who live in Silverado drive to downtown daily)

And in terms of suggesting the other extensions should be on a 20 year drawing board, really we're at that point. The extension to Crowfoot according to the city's original plans should have been built in 1982. Not 2009. If it had gone through back in the 80's then it would be more akin to if they decided to start building past Saddle Ridge, but building the line past there to the middle of three established communities with a total population of nearly 5% of the city, isn't encouraging anything. Its reacting to something.

The SE LRT will likely have an initial terminus around Quarry Park from the various plans and discussions people have had at events with the city, mainly as thats the likely minimum distance from downtown as its the only real place they could build the maintenance facilities for the line. There will be a decent amount of TOD like development there, the current component thats been built is essentially offices and retail, the southern half of the project is where the residential components will be and I wouldn't be too surprised to see at least some of those in the next couple years now that the rest is there and open. In some ways QP has actually turned into what was originally envisioned for Crowfoot with a mass of both jobs and retail, and will surpass it when the residential starts.
__________________

Live or work in the Beltline? Check out the Official Beltline web site here

Last edited by mersar; Mar 19, 2010 at 2:22 AM.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Calgary > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 11:18 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.