Old Posted Mar 12, 2010, 8:32 PM
CalibratedZeus CalibratedZeus is offline
 
Join Date: Sep 2009
Posts: 130
Well, with the wind I don't see them doing much more work today, or the next two days for that matter considering the forecast. Come on mother nature help us out here and cooperate!
     
     
  #7942  
Old Posted Mar 12, 2010, 11:29 PM
NYguy's Avatar
NYguy NYguy is offline
 
Join Date: Jul 2001
Posts: 57,277
Yeah, it was windy, cold, and damp out today. But that was nice compared to what's forecast for the weekend.

MARCH 12, 2010

1.


2.


3.


4.


5.


6.


7.


8.


9.


10.


11.


12.





• Video Link
     
     
  #7943  
Old Posted Mar 13, 2010, 12:06 AM
Bucktown718's Avatar
Bucktown718 Bucktown718 is offline
 
Join Date: Sep 2009
Posts: 296
^^^ Amazing can't wait till first floor will be done, wonder how will it look like.
One quick question i heard that they don't work on the tower on Saturday's and Sunday's is that true?
     
     
  #7944  
Old Posted Mar 13, 2010, 1:29 AM
Plokoon11 Plokoon11 is offline
 
Join Date: Jun 2007
Posts: 1,698
It looks like there doing two floors!
     
     
  #7945  
Old Posted Mar 13, 2010, 5:33 AM
2-TOWERS's Avatar
2-TOWERS 2-TOWERS is offline
 
Join Date: Dec 2003
Posts: 637
Well They Say A Floor A Week So It Seems Like They Are Doing 2 Floors At A Time So My Guess Is It Will Be 2 Weeks For The Double Floor.... Still Will Go Fast......i Will Be In The City In December So I Should See A Major Impact In The Skyline......
     
     
  #7946  
Old Posted Mar 13, 2010, 5:38 AM
kenratboy kenratboy is offline
 
Join Date: Nov 2003
Posts: 1,099
To paraphrase Sarah Palin:

'Build baby build!'

     
     
  #7947  
Old Posted Mar 13, 2010, 2:06 PM
OneWorldTradeCenter's Avatar
OneWorldTradeCenter OneWorldTradeCenter is offline
 
Join Date: Aug 2009
Posts: 1,201
Will they now install a new tower crane?
     
     
  #7948  
Old Posted Mar 13, 2010, 5:29 PM
Zensteeldude Zensteeldude is offline
 
Join Date: Jul 2009
Posts: 692
We should know the answer to that question in a month or so.

Great pics NYGuy.

I see that the "wind frame" design of the office floors allowed them to put up the next section of corner node on the SW . (The mechanical floors are a braced wind frame)

The perimeter steel resists almost all of the wind load and about half of the gravity load (the core takes the rest).

Last edited by Zensteeldude; Mar 13, 2010 at 5:52 PM.
     
     
  #7949  
Old Posted Mar 13, 2010, 8:23 PM
Domamania's Avatar
Domamania Domamania is offline
 
Join Date: Dec 2009
Posts: 240
one quick question why is the steel from the office floors are not red like the base floors of the tower?
     
     
  #7950  
Old Posted Mar 13, 2010, 8:33 PM
Zensteeldude Zensteeldude is offline
 
Join Date: Jul 2009
Posts: 692
The red paint is intumescent fire proofing, the unpainted steel well get spray on fire proofing ( basically a layer of cement sprayed onto the steel).

A BLANKET OF INSULATION
Intumescent coatings start turning to insulating foam at a temperature of 300°F - less than a hundred
degrees higher than boiling water. The heat sensitive ingredients in the smooth coating react and froth
up into a foam containing millions of tiny hollow cells. The expansion incredibly rapid. What was once
a smooth, decorative surface turns into a thick protective layer of insulation.



http://www.fireretardantsinc.com/fire_retardants101.html

http://www.youtube.com/watch?v=FaVblCHQjVY

The core steel is unpainted because it well be encased in concrete.

Last edited by Zensteeldude; Mar 13, 2010 at 8:45 PM.
     
     
  #7951  
Old Posted Mar 14, 2010, 12:31 AM
NYguy's Avatar
NYguy NYguy is offline
 
Join Date: Jul 2001
Posts: 57,277
Quote:
Originally Posted by Bucktown718 View Post
One quick question i heard that they don't work on the tower on Saturday's and Sunday's is that true?
I've seen them working weekends on some towers around town, (440 West 42nd is a recent example), but I haven't seen any weekend activity here.


Quote:
Originally Posted by Zensteeldude
I see that the "wind frame" design of the office floors allowed them to put up the next section of corner node on the SW .
I'm just waiting for that next section, the one we saw in your diagram. Then we will have arrived..
     
     
  #7952  
Old Posted Mar 14, 2010, 1:25 AM
malec's Avatar
malec malec is offline
 
Join Date: Jul 2005
Posts: 3,069
I was in NYC 2 weeks ago and visited this area. Of course it was very sad thinking about what happened here and you could definitely feel something uneasy about everyone walking past, etc.

Am very glad this is now being built and look forward to the day this area goes beyond being a construction site.

     
     
  #7953  
Old Posted Mar 14, 2010, 4:47 PM
MadGnome MadGnome is offline
 
Join Date: Dec 2009
Posts: 260
Would the change in fireproofing at this point be because of the steel going below a certain thickness? Or because it's office floors now instead of mechanical floors?
     
     
  #7954  
Old Posted Mar 14, 2010, 8:17 PM
hunser's Avatar
hunser hunser is offline
 
Join Date: Feb 2009
Posts: 4,016
tallest1776

[/QUOTE]
     
     
  #7955  
Old Posted Mar 14, 2010, 8:55 PM
uaarkson's Avatar
uaarkson uaarkson is offline
 
Join Date: Nov 2008
Posts: 2,103
I like how that guy basically just stole CULWULLA's work.
     
     
  #7956  
Old Posted Mar 14, 2010, 9:14 PM
hunser's Avatar
hunser hunser is offline
 
Join Date: Feb 2009
Posts: 4,016
Quote:
Originally Posted by uaarkson View Post
I like how that guy basically just stole CULWULLA's work.
indeed, he did. maybe culwulla needs better protection of the copyright for his diagrams.
     
     
  #7957  
Old Posted Mar 15, 2010, 12:12 AM
Muskavon Muskavon is offline
 
Join Date: Jan 2005
Posts: 451
Looking over NYguy's photos, you can start to see the true angle change/transition between the base and the office floors. Even with just a few of steel members up.
     
     
  #7958  
Old Posted Mar 15, 2010, 1:37 AM
MadGnome MadGnome is offline
 
Join Date: Dec 2009
Posts: 260
The scale of the cranes in that diagram must be way off. Even Red Jr. is tall enough to put the next corner piece up.
     
     
  #7959  
Old Posted Mar 15, 2010, 4:00 AM
Zensteeldude Zensteeldude is offline
 
Join Date: Jul 2009
Posts: 692
Quote:
Originally Posted by MadGnome View Post
Would the change in fireproofing at this point be because of the steel going below a certain thickness? Or because it's office floors now instead of mechanical floors?
It has to do with how much room there is for the insulation. Spray on fireproofing adds about 2 inches to the size of the beam/column. Intumescent paint adds about an 1/8th of an inch.
     
     
  #7960  
Old Posted Mar 15, 2010, 4:51 AM
kenratboy kenratboy is offline
 
Join Date: Nov 2003
Posts: 1,099
This is a very basic question - was this building designed with the metric or imperial system? Obviously we convert figures either way, but are the blue prints imperial or metric?
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
 

Go Back   SkyscraperPage Forum > Discussion Forums > Buildings & Architecture > Completed Project Threads Archive
Forum Jump



Forum Jump


All times are GMT. The time now is 9:34 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.