SBC9 flickr - looks like the podium brick is up to the third floor
Reply With Quote
     
     
  #182  
Old Posted Mar 7, 2010, 12:14 PM
eemy's Avatar
eemy eemy is offline
Closed account
 
Join Date: Aug 2006
Posts: 4,425
I have to say that the building itself looks far better than its rendering.
Reply With Quote
     
     
  #183  
Old Posted Mar 7, 2010, 11:11 PM
Davis137's Avatar
Davis137 Davis137 is offline
Registered User
 
Join Date: Aug 2008
Posts: 2,365
This is going to look decent when it's finshed...
Reply With Quote
     
     
  #184  
Old Posted Mar 8, 2010, 1:57 AM
harls's Avatar
harls harls is offline
Mooderator
 
Join Date: Jan 2002
Location: Aylmer, Québec
Posts: 21,450
Shot today from Hull by me.

Reply With Quote
     
     
  #185  
Old Posted Mar 11, 2010, 11:39 AM
harls's Avatar
harls harls is offline
Mooderator
 
Join Date: Jan 2002
Location: Aylmer, Québec
Posts: 21,450
More photos by francely in the Canada section:

Quote:
Originally Posted by francely57 View Post

that construction near the War Museum, seen from Alexandra bridge








reflection in the War Museum

Reply With Quote
     
     
  #186  
Old Posted Mar 11, 2010, 1:09 PM
Davis137's Avatar
Davis137 Davis137 is offline
Registered User
 
Join Date: Aug 2008
Posts: 2,365
That 2nd tower is going up really fast now...will only be a matter of weeks when they top it off I think.

Great Pano's of the Northern Ottawa Skyline and Tunneys!
Reply With Quote
     
     
  #187  
Old Posted Mar 12, 2010, 12:59 AM
K-133's Avatar
K-133 K-133 is offline
Registered User
 
Join Date: Mar 2010
Posts: 169
When the first tower stood there all alone, the project looked dismal. Now that the second tower is rising, you can really feel it coming together. Once the whole project is completed, I think this is really going to feel like it fits in.

Though the next ten years may be somewhat difficult to endure.

Harls, that picture from the Hull side really capture it!
Reply With Quote
     
     
  #188  
Old Posted Mar 12, 2010, 1:24 AM
jcollins jcollins is offline
Registered User
 
Join Date: Mar 2008
Location: Kitchener
Posts: 1,148
What else is planned for the surrounding areas other than these two towers?
Reply With Quote
     
     
  #189  
Old Posted Mar 12, 2010, 1:41 AM
K-133's Avatar
K-133 K-133 is offline
Registered User
 
Join Date: Mar 2010
Posts: 169
There are three more 'phases' planned.

Two shorter buildings with, I believe townhomes, condos and some retail space. Basically, if you're at the corner of Fleet and Lett looking towards Chinatown, that will all be filled in with the above. If standing in the same place you turn 180 degrees to look at Hull, that area is planned to have a Firefighters monument. It is currently still owned by the NCC.
Reply With Quote
     
     
  #190  
Old Posted Mar 12, 2010, 2:29 AM
waterloowarrior's Avatar
waterloowarrior waterloowarrior is offline
National Capital Region
 
Join Date: Nov 2005
Location: Eastern Ontario
Posts: 9,255
Here`s the model from Claridge`s bid



The next Claridge phase is currently trying to get rezoning
http://app01.ottawa.ca/postingplans/appDetails.jsf?lang=en&appId=__7TBVSZ. I think it`s the building above Claridge's Phase 1 and Two in the model image (aerial view)

I believe the next part of the overall LeBreton Flats development (i.e. other than Claridge's section) will be the NCC selling blocks U and T, which are on the south side of the ORP, just west of Claridge's Phase 1 & 2 (on the aerial view they are the blank area to the right of the existing development).

Last edited by waterloowarrior; Mar 12, 2010 at 2:46 AM.
Reply With Quote
     
     
  #191  
Old Posted Mar 12, 2010, 2:57 AM
K-133's Avatar
K-133 K-133 is offline
Registered User
 
Join Date: Mar 2010
Posts: 169
waterloowarrior

My understanding is that those sections will be used to erect a monument.
Reply With Quote
     
     
  #192  
Old Posted Mar 12, 2010, 3:10 AM
waterloowarrior's Avatar
waterloowarrior waterloowarrior is offline
National Capital Region
 
Join Date: Nov 2005
Location: Eastern Ontario
Posts: 9,255
Here's a couple more images for context




(source: southfacing flickr)

Here's where the Firefighters monument will be according to http://www.cfff.ca/en/memorial/

Last edited by waterloowarrior; Mar 12, 2010 at 3:38 AM.
Reply With Quote
     
     
  #193  
Old Posted Mar 12, 2010, 3:25 AM
K-133's Avatar
K-133 K-133 is offline
Registered User
 
Join Date: Mar 2010
Posts: 169
That makes much more sense then. Thanks waterloowarrior.


Any idea what's happening in that section between Booth and the transit path? There's been crews working those grounds all winter.

Last edited by K-133; Mar 12, 2010 at 3:44 AM.
Reply With Quote
     
     
  #194  
Old Posted Mar 12, 2010, 10:58 AM
ServiceGuy ServiceGuy is offline
Registered User
 
Join Date: Dec 2009
Posts: 335
Quote:
Originally Posted by K-133 View Post
Any idea what's happening in that section between Booth and the transit path? There's been crews working those grounds all winter.
That's infrastructure work... water mains, gates, or something like that.
Reply With Quote
     
     
  #195  
Old Posted Mar 12, 2010, 12:13 PM
jcollins jcollins is offline
Registered User
 
Join Date: Mar 2008
Location: Kitchener
Posts: 1,148
Thanks for all the info everyone!

Looks like it's going to be quite the project. I like the mix of townhomes and condos.

Does Claridge have the contract to do the entire thing?
Reply With Quote
     
     
  #196  
Old Posted Mar 12, 2010, 1:12 PM
Ottawan Ottawan is offline
Citizen-at-large
 
Join Date: Aug 2009
Location: Expat (in Toronto)
Posts: 738
Claridge has the contract for the area that they have built models for (the orange buildings in the renderings), they would have to compete to build anything west of Booth and/or south of the aquaduct.

I've personally always been most interested in those buildings along Booth - I can't wait for Claridge to get there.

My big disappointment with the project isn't the look (I always have maintained that while one lonely building looks bad, the area as a whole would look quite good), but the pace. In 2004, when Claridge won the bid, the whole development was supposed to be complete by 2015. I find it unlikely that even Claridge's portion will be complete by then.
Reply With Quote
     
     
  #197  
Old Posted Mar 12, 2010, 2:32 PM
K-133's Avatar
K-133 K-133 is offline
Registered User
 
Join Date: Mar 2010
Posts: 169
Ottawan - I share your frustration. Where you and I see the whole, many people see only a lonely building, surrounded by dirt. Though, I look at this as opportunity - without demand prices remain stagnant. Once this project really begins to come together, demand will rise more sharply - and so will the pace.

Unfortunately, until that demand comes, Claridge will not be motivated to move any faster. I give this project at least another 10 years.
Reply With Quote
     
     
  #198  
Old Posted Mar 12, 2010, 6:00 PM
Aylmer's Avatar
Aylmer Aylmer is offline
Still optimistic
 
Join Date: Nov 2007
Location: Montreal (C-D-N) / Ottawa (Aylmer)
Posts: 5,407
Well at least it's moving faster than the first tower... Claridge might be able to finish for 2013 at the earliest.

Reply With Quote
     
     
  #199  
Old Posted Mar 12, 2010, 6:11 PM
K-133's Avatar
K-133 K-133 is offline
Registered User
 
Join Date: Mar 2010
Posts: 169
Quote:
Originally Posted by Aylmer View Post
Well at least it's moving faster than the first tower... Claridge might be able to finish for 2013 at the earliest.

You're right, it is possible. They've sold 80% of tower 2 as well.

It also appears that the pace of the second tower is much faster now than tower 1.
Reply With Quote
     
     
  #200  
Old Posted Mar 12, 2010, 7:23 PM
ajldub ajldub is offline
Registered User
 
Join Date: Oct 2006
Posts: 433
We need to figure out a way to get a major sports hub that is home to the sens, 67s, CFL and soccer on the rest of this land. Preferably in two buildings. I can't think of anything that would go further in pulling this city together.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Downtown & Urban Ottawa
Forum Jump



Forum Jump


All times are GMT. The time now is 8:01 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.