Quote:
Originally Posted by jsbertram
I don't see why UBC - Broadway/Commercial - Lougheed - Douglas College can't be one line (EverMillenium?), and Waterfront - Broadway/Commercial - Metrotown - Columbia - King George - Langley can't be the Expo line.
|
Well it can. Back then, I wished the Canada Line had a distinction between the airport and Richmond branches just to make it more consistent with the Expo/Millennium Line configuration. Now, interestingly, I wish the SkyTrain system branded like the Canada Line.
Expo Line: Waterfront to King George via Columbia
Millennium Line: Waterfront to Douglas College (Tricities Branch) and Waterfront to Columbia (New Westminster Branch)
Quote:
Originally Posted by jsbertram
Since Lougheed has a 2nd platform (currently unfinished), some of the Expo trains can be Waterfront - Broadway/Commercial - Metrotown - Columbia - Lougheed, with the Lougheed 2nd platform as the terminal station. Having a train sitting at the 2nd platform waiting to return to Columbia, Metrotown and Waterfront won't block the EverMillenium trains using the main platform at Lougheed.
|
I love how we always talk about what the Lougheed Stn platform configuration is. I'll explain what the plan was originally for this station.
Let "Platform 1" be the unused and unfinished platform
Let "Platform 2" be the current inbound/westbound platform to VCC-Clark
Let "Platform 3" be the current outbound/eastbound platform to Waterfront via Columbia
Because of the rather confusing cross-track configuration east of the station, trains from Columbia will cross over to the track for Platform 1. Trains from Douglas College will also go to Platform 1.
There is a little more flexibility with Platform 2 and 3, as both can be easily used for trains to Columbia and trains to Douglas College.
Officedweller has a few diagrams which makes it a lot more simpler. I'm too lazy to dig it out again.
I think it's worth investment to reconfigure Lougheed Stn though. Currently, the station uses a centre dual platform with an island platform on the side:
Platform 1 (not used)
--------------------------Track
--------------------------Track
Platform 2/3
--------------------------Track
IfI think they should rebuild Platform 1 and the unused track so that the station uses two centre dual platforms instead with the following train configuration:
--------------------------Track: Inbound/Westbound to VCC-Clark
Platform 1/2
--------------------------Track: Outbound/Eastbound to Columbia
Platform 2/3
--------------------------Track: Outbound/Eastbound to Douglas College
This layout makes a lot more sense for the shuttle configuration between Lougheed and Columbia. Transfers between trains really occur on the platform level. Let's say you are on a train going at Columbia. Trains from Columbia enter the centre track. If you want to go to VCC-Clark, simply transfer across the platform. Similarly, if you want Douglas College, you also transfer across the platform. This layout works for both directions!
The shuttle train can be timed to work with trains from both or either directions, so that when you make a transfer, the train will already be there waiting for you.