  #2641  
Old Posted Mar 11, 2010, 4:25 PM
Zassk Zassk is offline
Registered User
 
Join Date: Sep 2009
Posts: 2,303
Quote:
Originally Posted by nname View Post
Actually, the diagram shows the 2021 ridership.. for Canada Line, they estimated that there will be 143,200 boardings a day. Their 2011 estimate for Canada Line is 117,600... I'd say its pretty accurate actually.
I don't get how the Richmond-Brighouse tail can be narrower than the Evergreen tail in 2021... that was the main problem that stuck out to me on the diagram. Ridership to Brighouse is at least 2/3 of the overall C-Line ridership, which implies it should be at least 75k in 2011 and 100k in 2021, which would be greater than Evergreen.

Anyway, that's just a side comment to the main discussion...
     
     
  #2642  
Old Posted Mar 11, 2010, 4:38 PM
WarrenC12's Avatar
WarrenC12 WarrenC12 is online now
Registered User
 
Join Date: May 2007
Location: East OV!
Posts: 24,629
Quote:
Originally Posted by Zassk View Post
I don't get how the Richmond-Brighouse tail can be narrower than the Evergreen tail in 2021... that was the main problem that stuck out to me on the diagram. Ridership to Brighouse is at least 2/3 of the overall C-Line ridership, which implies it should be at least 75k in 2011 and 100k in 2021, which would be greater than Evergreen.

Anyway, that's just a side comment to the main discussion...
No I think it's important to the discussion. I don't think Evergreen ridership will be nearly as high as predicted. Almost like the opposite of the Canada Line.
     
     
  #2643  
Old Posted Mar 11, 2010, 4:56 PM
twoNeurons twoNeurons is offline
loafing in lotusland
 
Join Date: Aug 2002
Location: Lotusland
Posts: 6,114
Regarding capacity, Remember that Canada Line trains are wider. They're probably equivalent to a 4-car MKI.

M-Line boarding numbers are also more balanced. There is more two-way traffic on the M-Line than the Expo line.

Ridership to Braid will drop dramatically once the EG-Line comes online. It serves as a bus hub now with many buses coming from Coquitlam and further East.
     
     
  #2644  
Old Posted Mar 11, 2010, 5:43 PM
DKaz DKaz is offline
Registered User
 
Join Date: Nov 2008
Location: Kelowna BC & Edmonton AB
Posts: 4,299
What do the numbers in the diagram represent? PPPHD in 2021?? You'd have to run 6-car MKIs and 4-car MKIIs every 60 seconds west of Broadway! There is no way the tail end of Waterfront Station can handle that kind of frequency, they need to build a loop of some sort!

Trains would depart from Waterfront every 60 seconds as follows:

EXPO LINE TO KING GEORGE
EXPO LINE TO COMMERCIAL-BROADWAY
EXPO LINE TO KING GEORGE
EXPO LINE TO METROTOWN
EXPO LINE TO KING GEORGE
MILLENNIUM LINE TO VCC-CLARK

Evergreen Line would run every 2/4 minutes from VCC-Clark to Douglas, for a combined two minute frequency from VCC-Clark to Lougheed Town Centre.

I know interlining three different lines may seem like a possible technical nightmare but I really don't think anyone is going to pony up the money to build an expensive third platform at Columbia.

Last edited by DKaz; Mar 11, 2010 at 6:08 PM.
     
     
  #2645  
Old Posted Mar 11, 2010, 8:05 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,705
Quote:
Originally Posted by DKaz View Post
What do the numbers in the diagram represent? PPPHD in 2021?? You'd have to run 6-car MKIs and 4-car MKIIs every 60 seconds west of Broadway! There is no way the tail end of Waterfront Station can handle that kind of frequency, they need to build a loop of some sort!

Trains would depart from Waterfront every 60 seconds as follows:

EXPO LINE TO KING GEORGE
EXPO LINE TO COMMERCIAL-BROADWAY
EXPO LINE TO KING GEORGE
EXPO LINE TO METROTOWN
EXPO LINE TO KING GEORGE
MILLENNIUM LINE TO VCC-CLARK

Evergreen Line would run every 2/4 minutes from VCC-Clark to Douglas, for a combined two minute frequency from VCC-Clark to Lougheed Town Centre.

I know interlining three different lines may seem like a possible technical nightmare but I really don't think anyone is going to pony up the money to build an expensive third platform at Columbia.
Remember that Waterfront Station (Expo/M Line) also has an X-crossover west of the platform. That may provide shorter headways.
     
     
  #2646  
Old Posted Mar 11, 2010, 9:04 PM
nname nname is offline
Registered User
 
Join Date: Aug 2005
Posts: 5,088
Quote:
Originally Posted by Zassk View Post
I don't get how the Richmond-Brighouse tail can be narrower than the Evergreen tail in 2021... that was the main problem that stuck out to me on the diagram. Ridership to Brighouse is at least 2/3 of the overall C-Line ridership, which implies it should be at least 75k in 2011 and 100k in 2021, which would be greater than Evergreen.
People from southern suburbs get on the train at Bridgeport; people from eastern suburbs get on the train at Coquitlam station.. I guess this is the difference? If you compare the width of the line north of Coquitlam station with the Richmond ones, you'll see they're about the same width.

Quote:
Originally Posted by DKaz View Post
What do the numbers in the diagram represent?
Ridership between 5 and 9AM.
     
     
  #2647  
Old Posted Mar 11, 2010, 10:03 PM
DKaz DKaz is offline
Registered User
 
Join Date: Nov 2008
Location: Kelowna BC & Edmonton AB
Posts: 4,299
Quote:
Originally Posted by officedweller View Post
Remember that Waterfront Station (Expo/M Line) also has an X-crossover west of the platform. That may provide shorter headways.
When the east tail was out of service for track repairs, the backlog for inbound trains was unacceptable, usually four trains waiting to get into the one platform. It is possible they can shorten the outbound train's dwelling time to say 10-15 seconds to reduce this pressure.

Are you sure it's 5am to 9am in that diagram? I wouldn't be surprised if we're at 30,000 passengers past Commercial-Broadway 5am-9am right now!
     
     
  #2648  
Old Posted Mar 11, 2010, 10:28 PM
nname nname is offline
Registered User
 
Join Date: Aug 2005
Posts: 5,088
Quote:
Originally Posted by DKaz View Post
When the east tail was out of service for track repairs, the backlog for inbound trains was unacceptable, usually four trains waiting to get into the one platform. It is possible they can shorten the outbound train's dwelling time to say 10-15 seconds to reduce this pressure.

Are you sure it's 5am to 9am in that diagram? I wouldn't be surprised if we're at 30,000 passengers past Commercial-Broadway 5am-9am right now!
I don't know, you can try sum up the bars on this chart
     
     
  #2649  
Old Posted Mar 11, 2010, 10:48 PM
Mac Write Mac Write is offline
Registered User
 
Join Date: Dec 2008
Posts: 1,423
A simple solution would be to use North track for E and South for M. Would that help at all? But if they wanted to rotate trains through the east tail end though……
     
     
  #2650  
Old Posted Mar 11, 2010, 11:39 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,705
Were they only using one platform or two platforms (both sides of the centre platform)?
I'm not really sure which would be faster, using the tail track (i.e. no criss-crossing) or the X-crossing where there would be criss-crossing but shorter distances.
     
     
  #2651  
Old Posted Mar 11, 2010, 11:48 PM
Mac Write Mac Write is offline
Registered User
 
Join Date: Dec 2008
Posts: 1,423
South plantform unload, north platform loading. 3 trains can be in the station, South platform, North platform and tail track.
     
     
  #2652  
Old Posted Mar 12, 2010, 6:35 AM
arashi_1987 arashi_1987 is offline
Registered User
 
Join Date: Sep 2008
Posts: 71
Quote:
Originally Posted by nname View Post
I think there would more people travelling from Burquitlam to Production than from Braid to Production. So running Evergreen Line as shuttle would force even more transfers...

How would you cope with the difference in demand west and south of Lougheed station?
Answer: Densification!
Are there any plans to develop around Braid station or will it forever be an empty lot? And maybe when New West revitalizes more (e.g. that new mall with the theatre), more people will travel along that underused section between Lougheed and Columbia. It's not that underused anyway, just less used than the overcrowded sections.

The lougheed-columbia shuttle idea demonstrates efficient use of resources but will make the system function poorly. North and south side of Burnaby will be poorly linked (poor access to and from Metrotown/Surrey from Lougheed or Coquitlam).
     
     
  #2653  
Old Posted Mar 12, 2010, 7:04 AM
DKaz DKaz is offline
Registered User
 
Join Date: Nov 2008
Location: Kelowna BC & Edmonton AB
Posts: 4,299
Quote:
Originally Posted by nname View Post
I don't know, you can try sum up the bars on this chart
20,400 +/- 500.

Quote:
Originally Posted by officedweller View Post
Were they only using one platform or two platforms (both sides of the centre platform)?
I'm not really sure which would be faster, using the tail track (i.e. no criss-crossing) or the X-crossing where there would be criss-crossing but shorter distances.
Normally, inbound trains unload on the south platform, go to the tail track, then switch in to platform 1 to load up on the north platform.
     
     
  #2654  
Old Posted Mar 12, 2010, 8:21 AM
nname nname is offline
Registered User
 
Join Date: Aug 2005
Posts: 5,088
Quote:
Originally Posted by arashi_1987 View Post
Answer: Densification!
Are there any plans to develop around Braid station or will it forever be an empty lot? And maybe when New West revitalizes more (e.g. that new mall with the theatre), more people will travel along that underused section between Lougheed and Columbia. It's not that underused anyway, just less used than the overcrowded sections.

The lougheed-columbia shuttle idea demonstrates efficient use of resources but will make the system function poorly. North and south side of Burnaby will be poorly linked (poor access to and from Metrotown/Surrey from Lougheed or Coquitlam).
Well, but even if densification occurs, it would still be a less travelled route compared to Production-Burquitlam. Most people wouldn't mind if you run trains frequent enough on all the routes. If they can run the train every 3-5 minutes, then the maximum time you have to wait, even with 2 transfers, would still be less than 8 minutes.

And before anyone say that segment will be underused, here's the load data for SkyTrain.. Note that the busiest section on the 99 B-Line currently have a load of 23,000, so the shuttle would just get as much used as the 99 B-Line today

2006 Actual


2010 Simulated (from 2007)


2014 Simulated (from 2008)
     
     
  #2655  
Old Posted Mar 12, 2010, 9:28 AM
cabotp cabotp is offline
Registered User
 
Join Date: Mar 2009
Location: Vancouver, BC
Posts: 2,813
Quote:
Originally Posted by arashi_1987 View Post
Answer: Densification!
Are there any plans to develop around Braid station or will it forever be an empty lot? And maybe when New West revitalizes more (e.g. that new mall with the theatre), more people will travel along that underused section between Lougheed and Columbia. It's not that underused anyway, just less used than the overcrowded sections.

The lougheed-columbia shuttle idea demonstrates efficient use of resources but will make the system function poorly. North and south side of Burnaby will be poorly linked (poor access to and from Metrotown/Surrey from Lougheed or Coquitlam).
There is the new Office Tower, Condo Tower complex. That will be going up at Sapperton. Right beside the hospital. So you can expect a small boost at that station.
     
     
  #2656  
Old Posted Mar 12, 2010, 9:57 AM
nname nname is offline
Registered User
 
Join Date: Aug 2005
Posts: 5,088
If they turn the M-Line into a shuttle, they should really build the Woodland station to boost ridership...
     
     
  #2657  
Old Posted Mar 12, 2010, 6:56 PM
tybuilding tybuilding is offline
Registered User
 
Join Date: Sep 2009
Posts: 898
Quote:
Originally Posted by cabotp View Post
There is the new Office Tower, Condo Tower complex. That will be going up at Sapperton. Right beside the hospital. So you can expect a small boost at that station.
http://forum.skyscraperpage.com/showthread.php?t=174746 Here is the thread.
     
     
  #2658  
Old Posted Mar 12, 2010, 7:57 PM
jsbertram jsbertram is offline
Registered User
 
Join Date: Sep 2009
Posts: 3,245
Quote:
Originally Posted by nname View Post
If they turn the M-Line into a shuttle, they should really build the Woodland station to boost ridership...
I don't see why UBC - Broadway/Commercial - Lougheed - Douglas College can't be one line (EverMillenium?), and Waterfront - Broadway/Commercial - Metrotown - Columbia - King George - Langley can't be the Expo line.

Since Lougheed has a 2nd platform (currently unfinished), some of the Expo trains can be Waterfront - Broadway/Commercial - Metrotown - Columbia - Lougheed, with the Lougheed 2nd platform as the terminal station. Having a train sitting at the 2nd platform waiting to return to Columbia, Metrotown and Waterfront won't block the EverMillenium trains using the main platform at Lougheed.
     
     
  #2659  
Old Posted Mar 12, 2010, 10:31 PM
deasine deasine is offline
Vancouver Moderator
 
Join Date: Mar 2007
Posts: 5,747
Quote:
Originally Posted by jsbertram View Post
I don't see why UBC - Broadway/Commercial - Lougheed - Douglas College can't be one line (EverMillenium?), and Waterfront - Broadway/Commercial - Metrotown - Columbia - King George - Langley can't be the Expo line.
Well it can. Back then, I wished the Canada Line had a distinction between the airport and Richmond branches just to make it more consistent with the Expo/Millennium Line configuration. Now, interestingly, I wish the SkyTrain system branded like the Canada Line.

Expo Line: Waterfront to King George via Columbia
Millennium Line: Waterfront to Douglas College (Tricities Branch) and Waterfront to Columbia (New Westminster Branch)

Quote:
Originally Posted by jsbertram View Post
Since Lougheed has a 2nd platform (currently unfinished), some of the Expo trains can be Waterfront - Broadway/Commercial - Metrotown - Columbia - Lougheed, with the Lougheed 2nd platform as the terminal station. Having a train sitting at the 2nd platform waiting to return to Columbia, Metrotown and Waterfront won't block the EverMillenium trains using the main platform at Lougheed.
I love how we always talk about what the Lougheed Stn platform configuration is. I'll explain what the plan was originally for this station.

Let "Platform 1" be the unused and unfinished platform
Let "Platform 2" be the current inbound/westbound platform to VCC-Clark
Let "Platform 3" be the current outbound/eastbound platform to Waterfront via Columbia

Because of the rather confusing cross-track configuration east of the station, trains from Columbia will cross over to the track for Platform 1. Trains from Douglas College will also go to Platform 1.

There is a little more flexibility with Platform 2 and 3, as both can be easily used for trains to Columbia and trains to Douglas College.

Officedweller has a few diagrams which makes it a lot more simpler. I'm too lazy to dig it out again.

I think it's worth investment to reconfigure Lougheed Stn though. Currently, the station uses a centre dual platform with an island platform on the side:

Platform 1 (not used)
--------------------------Track
--------------------------Track
Platform 2/3
--------------------------Track

IfI think they should rebuild Platform 1 and the unused track so that the station uses two centre dual platforms instead with the following train configuration:

--------------------------Track: Inbound/Westbound to VCC-Clark
Platform 1/2
--------------------------Track: Outbound/Eastbound to Columbia
Platform 2/3
--------------------------Track: Outbound/Eastbound to Douglas College

This layout makes a lot more sense for the shuttle configuration between Lougheed and Columbia. Transfers between trains really occur on the platform level. Let's say you are on a train going at Columbia. Trains from Columbia enter the centre track. If you want to go to VCC-Clark, simply transfer across the platform. Similarly, if you want Douglas College, you also transfer across the platform. This layout works for both directions!

The shuttle train can be timed to work with trains from both or either directions, so that when you make a transfer, the train will already be there waiting for you.
     
     
  #2660  
Old Posted Mar 12, 2010, 11:12 PM
CPE's Avatar
CPE CPE is offline
Registered User
 
Join Date: Nov 2007
Location: Vancouver
Posts: 143
Translink wont do that, it makes too much sense.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 4:26 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.