Quote:
Originally Posted by Wooster
There is a revised Development Permit that was submitted a few weeks ago for the south block. Not sure how extensive the changes are (someone mentioned they are minor - mostly related to use?), I guess we'll wait and see. Unibrain, any insight?
|
I haven't seen the DP, or have any inside information ( and I certainly could be wrong on this), but I was assuming that this revised DP was actually to add the south block - it had not yet been approved before. The original base building DP just allows for work to be done up to grade on the south block (and states explicitly that the above grade stuff is in a future DP), thus a permit revision was going to be required to build the south block above grade.
I don't think it means that any changes have been made to the plans for the south block - though I'm sure there's AT LEAST minor tweaks - there always is.
My interpretation (without anything to back it up) was that perhaps they want to start building the south block shortly, not waiting until the tower is complete for a year, as had been talked about a while back. Perhaps the plan is still to wait, but this DP revision had to happen anyway. The +15 connections will have to be added later too. (unless they are included with the south block revision)