Quote:
Originally Posted by The_Henry_Man
Now I'm starting to believe more and more that the currently long lineups just to get into the C-line stations are just due to those stupid attendants forcing people to file into single lines like kids.
|
Exactly, they are over policing it.
I have had no waits on the Canada line so far this week (riding it every day due to my job).
And any waits that have happened has occurred due to unnecessary policing of passengers. I still think the attendants would be far more useful and efficient on the platform itself directing people to let passengers on the train off first.
The fact that the line can move 210 000 with its current fleet with minimal occurences of major waits is what is amazing.
The fact is the frequency can still be doubled just by buying more train sets. (3 mins to 90 seconds) That would put the Canada line theiretically around 400 000. Then, all the stations can easily be built to the 50 meter lengths, allowing a third car to be added, possibly bumping up a crush capacity near 500 000, especially if a few more entrances/exits are built accessing the more busy stations.
Knowing that, one can then safely assume that fully built (50m platforms, 3 car trains every 90 seconds with a few more entrances/exits) the C-line could relatively comfortably (no long station waits) move 400 000 people a day. It will be many decades until such a demand is needed, seeing how we are only currently at 100 000 a day now during normal conditions.
The Olympics so far have proven that with good flow management a fully operating C-line could move 500 000 people a day with delays, therefore 400 000 could likely be moved without delays. Pretty darn good if you ask me.